Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Cable Winch Safe Work Method Statement (SWMS)

SKU:SWMAU7783

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Cable Winch Safe Work Method Statement (SWMS)

Introducing our comprehensive Safe Work Method Statement (SWMS) for using cable winch, designed to help your team stay safe while carrying out winching tasks on site. Our SWMS is pre-filled and easy to customise in Microsoft Word format, making it simple to edit to suit the specific needs of your project.

Here are the key features of our SWMS for using cable winch:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the necessary details for using a cable winch on site, making it comprehensive and easy to use.
  • Fully Editable and Customisable: Our SWMS is fully editable and customisable in Microsoft Word format, allowing you to easily tailor it to the specific needs of your project.
  • Includes Scope of the Project and Project Details: Our SWMS includes a clear scope of the project and project details, helping to ensure that everyone involved is aware of what is required.
  • Includes Checklist of Any High Risk Machinery on Site: Our SWMS includes a checklist of any high risk machinery on site, helping to ensure that all risks are identified and addressed.
  • Includes Space for Recording Any Staff Training: Our SWMS includes space for recording any staff training, ensuring that everyone involved has the necessary training and knowledge to carry out the work safely.
  • Includes Before and After Risk Ratings: Our SWMS includes before and after risk ratings, helping you to easily track and monitor risk levels throughout the project.
  • Includes Resources for Use of Legislative References: Our SWMS includes resources for use of legislative references, ensuring that you are complying with all relevant regulations and legislation.
  • Includes All PPE Required: Our SWMS includes all PPE required for using a cable winch on site, helping to ensure that everyone is properly protected.
  • Includes Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and risk assessment matrix, helping you to identify and manage any potential risks.
  • Includes a Checklist to Ensure All Requirements Have Been Covered: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS, helping you to ensure that nothing has been missed.
  • Includes Sign Off Page for All Workers and Responsible Persons: Our SWMS includes a sign off page for all workers and responsible persons, helping you to ensure that everyone involved has acknowledged and agreed to the SWMS.
  • Easy to Use, Easy to Customise: Our SWMS is designed to be easy to use and easy to customise, making it a convenient and efficient tool for your team.
  • Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Our SWMS is suitable for use on large contracts and tenders, including tier 1 contractual work.
  • Instantly Delivered Download: Our SWMS is available as an instantly delivered download, so you can get started right away.

We understand that safety is a top priority on any worksite, and our SWMS for using cable winch is designed to help your team stay safe and comply with all relevant regulations and legislation. So why not try our SWMS today and see how it can benefit your team and your project?

Here is some safety information related to using cable winch.

Hazards and Risks:

The use of a cable winch can result in serious injuries and fatalities if not used correctly. The risks associated with operating a cable winch include:

  • Crushing injuries from the cable or winch
  • Struck by moving parts of the winch
  • Electrical hazards
  • Falling objects or persons
  • Manual handling injuries
  • Noise exposure

Control Measures:

Before commencing any work involving a cable winch, workers must ensure that all control measures are in place to minimise risks. Control measures include:

  • Conducting a risk assessment before commencing work to identify potential hazards and implementing control measures to eliminate or reduce the risks.
  • Providing adequate personal protective equipment (PPE) to workers, including hearing protection, eye protection, gloves, hard hats, and safety footwear.
  • Ensuring all workers are trained and competent in the use of a cable winch and familiar with the manufacturer’s instructions.
  • Ensuring that the cable winch is inspected before each use, and any defects or damage are repaired before use.
  • Using appropriate signage and barricades to prevent unauthorised personnel from entering the work area.
  • Establishing exclusion zones around the cable winch to prevent workers from entering the area while the winch is in operation.
  • Providing appropriate lifting and rigging equipment to handle loads and avoid manual handling injuries.
  • Ensuring the work area is adequately lit to prevent accidents and falls.
  • Providing a first aid kit and trained first aid personnel on site.

Operating Procedures:

The following operating procedures must be followed when using a cable winch:

  • Ensure that the cable winch is securely anchored to a stable structure before use.
  • Ensure that the cable winch is rated for the weight of the load being lifted.
  • Use appropriate rigging equipment to lift the load and avoid manual handling injuries.
  • Ensure that the load is balanced and does not exceed the capacity of the cable winch.
  • Never exceed the cable winch’s maximum pulling capacity.
  • Ensure that the cable winch is switched off and the cable is fully retracted before conducting any maintenance or repairs.
  • Use appropriate lockout and tag out procedures when conducting maintenance or repairs on the cable winch.
  • Follow the manufacturer’s instructions for the safe operation of the cable winch.

Emergency Procedures:

In the event of an emergency, workers must follow the following procedures:

  • Stop the cable winch immediately if any worker is in danger or there is an emergency.
  • Call emergency services if necessary.
  • Administer first aid if required.
  • Conduct an investigation to identify the cause of the emergency and implement corrective actions to prevent a similar incident from occurring.

Gary’s Safety Tips

Hey there my friends, today we’re going to talk about something really important that could save your life if you work in a field where you use cable winches. Yes, you heard it right – we’re talking about the dangers and safety procedures of working with cable winches.

First of all, let me tell you that cable winches are an essential tool in many industries. They are used for lifting heavy loads, pulling equipment, and even for towing vehicles. But as with any heavy machinery, there are risks associated with using cable winches that can result in serious injury or even death if proper safety procedures are not followed.

One of the biggest dangers of working with cable winches is the risk of the cable breaking. When the cable breaks, it can whip around with tremendous force, causing serious injury or even death to anyone in its path. This is why it’s important to always inspect the cable before using it, and to replace it if there are any signs of wear and tear or damage.

Another danger of working with cable winches is the risk of the load falling or slipping off the winch. This can happen if the load is not properly secured or if the winch is not being used properly. To prevent this, make sure that the load is securely fastened to the winch, and that the winch is being used within its rated capacity.

In addition to these dangers, there are other risks associated with working with cable winches that can be mitigated by following proper safety procedures. For example, it’s important to always wear appropriate personal protective equipment (PPE) when using a cable winch. This includes things like gloves, safety glasses, and a hard hat.

It’s also important to make sure that the winch is properly anchored before using it. This means that the winch should be attached to a stable object that can withstand the force being applied to it. If the winch is not properly anchored, it could come loose and cause serious injury or damage.

Another important safety procedure is to always keep your hands and feet away from the cable when it’s under tension. If you need to adjust the cable, make sure to release the tension first and then make your adjustments. This will prevent the cable from snapping back and causing injury.

Finally, it’s important to always use the winch in accordance with the manufacturer’s instructions. This means that you should read and follow the instructions carefully, and make sure that you understand how to use the winch safely and effectively. If you’re not sure how to use the winch, ask for help or seek out training before using it.

In conclusion, working with cable winches can be dangerous if proper safety procedures are not followed. It’s important to inspect the cable, secure the load properly, wear appropriate PPE, anchor the winch, keep your hands and feet away from the cable, and use the winch in accordance with the manufacturer’s instructions. By following these safety procedures, you can greatly reduce the risk of injury or death when working with cable winches.

Remember my friends, safety is not just a priority, it’s a value. Always put safety first, and never compromise on it. Your life is too precious to take risks that can be easily avoided. Stay safe and keep hustling!

Cheers,

Cable Winch Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Cable Winch Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket