Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Carton Folding And Gluing Machine Safe Work Method Statement (SWMS)

SKU:SWMAU487

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Carton Folding And Gluing Machine Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement (SWMS) for carton folding and gluing machine, designed to assist your business in maintaining a safe and healthy work environment while carrying out your projects. Our SWMS is pre-filled and comprehensive, ensuring that all the necessary details are covered, while also being fully editable and customisable in Microsoft Word format for easy editing.

Key Features:

  • Scope of the project and project details: Our SWMS includes a clear outline of the scope of the project and relevant project details, ensuring that everyone is on the same page from the get-go.
  • Checklist of any high-risk machinery on site: Our SWMS includes a comprehensive checklist of any high-risk machinery that may be present on site, to ensure that risks are identified and addressed.
  • Space for recording staff training: Our SWMS includes a section for recording staff training, helping to ensure that all employees have received the necessary training to carry out their work safely.
  • Before and after risk ratings: Our SWMS includes a section for recording before and after risk ratings, allowing for the evaluation of the effectiveness of the risk controls put in place.
  • Resources for use of legislative references: Our SWMS includes resources for the use of legislative references, ensuring that all relevant legislation is being complied with.
  • All PPE required: Our SWMS includes a list of all personal protective equipment (PPE) required for the job, ensuring that workers are adequately protected.
  • Risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix, enabling a systematic approach to identifying, assessing and managing risks.
  • Checklist to ensure all requirements have been covered when implementing the SWMS: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS, reducing the risk of any crucial steps being missed.
  • Sign-off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons, ensuring that everyone is accountable for their actions and responsibilities.
  • Easy to use, easy to customise: Our SWMS is designed to be user-friendly and can be easily customised to suit the needs of your business.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, making it a valuable resource for businesses of all sizes.
  • Instantly delivered download: Our SWMS is available for instant download, ensuring that you can get started on your project without delay.

Our SWMS is not a guarantee, but it is a valuable resource for your business to assist in creating a safe work environment. At [company name], we are committed to helping businesses operate safely and responsibly, and our SWMS for carton folding and gluing machine is a testament to that commitment.

Here is some safety information related to using carpet folding and gluing machine.

Risk Assessment: Before starting work on the carton folding and gluing machine, a risk assessment must be conducted to identify any potential hazards associated with the operation of the machine. The following risks have been identified and appropriate measures have been taken to minimise these risks:

  1. Pinch points: The moving parts of the machine can cause pinch points which can cause serious injury to operators. Guards must be in place to prevent operators from coming into contact with moving parts.
  2. Entanglement: Operators can become entangled in the machine if loose clothing or hair gets caught in the moving parts. Operators must wear appropriate clothing and tie back long hair to prevent this risk.
  3. Burns: The heating elements of the machine can cause burns to operators if not handled properly. Operators must wear appropriate heat-resistant gloves when handling the machine.
  4. Electrical hazard: The machine is powered by electricity and can pose an electrical hazard if not properly maintained. Only authorised personnel are allowed to perform maintenance on the machine.
  5. Slips, trips, and falls: The area around the machine can become slippery due to oil and water spills. Operators must keep the area clean and dry to prevent slips, trips, and falls.

Safe Work Procedures:

  1. Preparation: Before operating the machine, operators must ensure that all guards and safety devices are in place and functioning properly. Any defective parts or guards must be replaced before the machine is operated.
  2. Personal protective equipment: Operators must wear appropriate personal protective equipment, including safety glasses, heat-resistant gloves, and appropriate footwear.
  3. Machine operation: Operators must follow the manufacturer’s instructions for operating the machine. They must ensure that the machine is properly lubricated and that all adjustments are made while the machine is turned off.
  4. Maintenance: Only authorised personnel are allowed to perform maintenance on the machine. The machine must be turned off and unplugged before any maintenance is performed. Lock-out/tag-out procedures must be followed to ensure that the machine cannot be accidentally turned on while maintenance is being performed.
  5. Housekeeping: The area around the machine must be kept clean and free of debris. Oil and water spills must be cleaned up immediately to prevent slips, trips, and falls.

Emergency Procedures: In the event of an emergency, such as an operator becoming entangled in the machine, the operator must immediately press the emergency stop button located on the machine. The operator must then follow the site’s emergency procedures for reporting the incident.

Gary’s Safety Tips

What’s up everybody, it’s your safety guy Gary coming at you with some important safety recommendations and procedures for working with carton folding and gluing machines. Now, before we get started, I want to make it clear that safety should always be your top priority when working with machinery of any kind. One wrong move could result in serious injury or even death, so it’s important that you take the necessary precautions to protect yourself and those around you.

Let’s start with some general safety tips that you should always keep in mind when working with carton folding and gluing machines. First and foremost, always wear the appropriate personal protective equipment (PPE) for the job. This includes safety glasses, earplugs or earmuffs, gloves, and any other equipment recommended by the manufacturer or your employer.

Next, make sure that you are properly trained on the operation of the machine. This means reading the instruction manual thoroughly and getting hands-on training from a qualified trainer. Never attempt to operate the machine if you are unsure of how to use it properly.

It’s also important to keep the work area clean and free of clutter. This not only makes it easier to operate the machine, but it also reduces the risk of accidents or injuries caused by tripping or slipping on debris.

Now let’s talk about some of the specific dangers associated with carton folding and gluing machines. One of the biggest risks is getting your fingers caught in the machine’s moving parts. To prevent this, always keep your hands and fingers away from the machine’s pinch points, and use push sticks or other tools to feed material into the machine.

Another common danger is getting hit by flying debris or materials. To prevent this, make sure that the machine’s guards and shields are in place and functioning properly. Never remove or bypass these safety features, as they are there to protect you from harm.

It’s also important to be aware of the potential for electrical hazards when working with these machines. Make sure that the machine is properly grounded and that all electrical connections are in good condition. If you notice any frayed wires or other signs of electrical damage, report it to your supervisor immediately.

Finally, it’s important to be aware of the potential for fires or explosions when working with adhesives or other flammable materials. Make sure that the area around the machine is well-ventilated, and never smoke or use open flames near the machine.

In addition to these general safety tips and specific dangers, there are also some best practices that can help you stay safe while working with carton folding and gluing machines. For example, always inspect the machine before use to make sure that it is in good working order. If you notice any problems or issues, report them to your supervisor immediately.

It’s also a good idea to perform regular maintenance on the machine to keep it running smoothly and prevent breakdowns. This can include cleaning and lubricating moving parts, replacing worn or damaged components, and checking the machine’s alignment.

Finally, always follow proper lockout/tagout procedures when working on the machine. This means de-energising the machine and securing it from accidental startup before performing any maintenance or repair work.

In conclusion, working with carton folding and gluing machines can be a rewarding and productive job, but it also comes with some serious risks. By following these safety recommendations, procedures, and best practices, you can help ensure that you and your coworkers stay safe on the job. Remember, safety should always be your top priority, and never hesitate to speak up if you notice any potential hazards or unsafe practices in the workplace. Stay safe out there, and keep on crushing it!

Cheers,

Carton Folding And Gluing Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Carton Folding And Gluing Machine Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket