Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Diaphragm Pump Safe Work Method Statement (SWMS)

SKU:SWMAU713

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Diaphragm Pump Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement for using a diaphragm pump – your essential tool for ensuring safety on your work site. This comprehensive document is pre-filled with all the necessary information, making it easy to customise and tailor to your specific needs. Here are some of the key features of our SWMS:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the essential information required for safe operation of a diaphragm pump. It covers all the necessary details, ensuring nothing is overlooked when it comes to safety on your work site.
  • Fully editable and customisable: Our SWMS comes in Microsoft Word format, making it easy to edit and customise to your specific project requirements. This feature ensures that you can adapt the document to meet the unique needs of your work site.
  • Includes the scope of the project and project details: Our SWMS includes a clear and concise description of the project scope and all relevant project details. This feature ensures that everyone involved in the project is aware of the specifics and is on the same page.
  • Includes checklist of any high-risk machinery on site: Our SWMS includes a checklist of any high-risk machinery on site. This feature ensures that all safety measures are taken into account, and risks associated with high-risk machinery are minimised.
  • Includes space for recording any staff training: Our SWMS includes a space for recording staff training. This feature ensures that all workers on site are adequately trained in the safe operation of the diaphragm pump.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings. This feature ensures that any risks are identified and addressed before work commences, and that risk ratings are reviewed and adjusted as required throughout the project.
  • Includes resources for use of legislative references: Our SWMS includes resources for the use of legislative references. This feature ensures that your project is compliant with all relevant legislation and regulations.
  • Includes all PPE required: Our SWMS includes all PPE required for the safe operation of a diaphragm pump. This feature ensures that all workers on site are equipped with the necessary PPE to minimise the risk of injury.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix. This feature ensures that all risks associated with the operation of a diaphragm pump are identified and assessed, and that appropriate control measures are implemented.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This feature ensures that nothing is overlooked when it comes to safety on your work site.
  • Includes sign-off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons. This feature ensures that all workers on site acknowledge their responsibility for safety and commit to following the SWMS.
  • Easy to use, easy to customise: Our SWMS is designed to be easy to use and easy to customise. This feature ensures that you can focus on your work, knowing that safety is taken care of.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work. This feature ensures that you can use our SWMS for any project, no matter the size or complexity.
  • Instantly delivered download: Our SWMS is available as an instantly delivered download, ensuring that you have access to the document as soon as you need it.

In conclusion, our Safe Work Method Statement for using a diaphragm pump is an essential tool for ensuring safety on your work site.

Here is some safety information related to using a diaphragm pump.

Hazards:

  • Electric shock
  • Burns
  • Chemical exposure
  • Noise exposure
  • Pinch points
  • Trip hazards
  • Crushing hazards
  • Struck by moving parts
  • Eye injuries

Personal Protective Equipment (PPE):

  • Hard hat
  • Safety glasses or goggles
  • Face shield
  • Chemical resistant gloves
  • Chemical resistant apron
  • Safety shoes
  • Hearing protection

Pre-Operational Checks:

  • Ensure that the diaphragm pump is in good working condition and that all safety features are operational.
  • Check all hoses, fittings, and connectors for leaks, damage, or wear and replace if necessary.
  • Ensure that the pump is grounded and that all electrical connections are secure.
  • Make sure that the pump is properly secured and that there are no loose parts.
  • Ensure that the pump is not overfilled with liquid.

Operating Procedures:

  • Only trained and competent workers should operate the diaphragm pump.
  • Follow the manufacturer’s instructions for starting, operating, and stopping the pump.
  • Do not touch the pump or any of its parts while it is in operation.
  • Keep hands and clothing away from moving parts.
  • Do not exceed the maximum pressure or flow rate of the pump.
  • Avoid overloading the pump with abrasive or corrosive materials.
  • Use appropriate PPE when handling chemicals or other hazardous materials.
  • Keep the work area clean and free of debris or other hazards.
  • Do not attempt to modify or repair the pump unless trained and authorised to do so.
  • Immediately report any safety concerns, incidents, or near-misses to the supervisor.

Emergency Procedures:

  • In case of an emergency, immediately shut off the power and disconnect the electrical cord.
  • Call emergency services if necessary.
  • Evacuate the area if there is a risk of explosion, fire, or chemical exposure.
  • Administer first aid if necessary.
  • Notify the supervisor and safety officer of the incident as soon as possible.

Gary’s Safety Tips

Hey there, my friends! Today, we’re going to talk about diaphragm pumps, and more specifically, the dangers that come with working with them and how you can ensure your safety while doing so.

First off, let’s start with the basics. A diaphragm pump is a type of positive displacement pump that uses a diaphragm to move fluid. These pumps are commonly used in a variety of industries, including agriculture, construction, and mining.

Now, let’s talk about the dangers that come with working with diaphragm pumps. One of the biggest risks is the potential for the diaphragm to rupture or tear. This can happen due to a variety of reasons, such as overloading the pump, running it dry, or using it with incompatible fluids.

When a diaphragm ruptures, it can release hazardous materials or liquids, which can be harmful to your health. For example, if you’re working with a diaphragm pump that’s used for pumping chemicals, a ruptured diaphragm can cause chemical exposure, which can lead to chemical burns or even respiratory problems.

Another danger associated with diaphragm pumps is the risk of electrical shock. Many diaphragm pumps are powered by electricity, which means that there’s a risk of electric shock if the pump is not properly grounded or if it’s exposed to moisture.

So, how can you ensure your safety when working with diaphragm pumps? Here are a few tips:

  1. Read the manual – Before using a diaphragm pump, make sure to read the manual thoroughly. The manual will provide you with important information on how to operate the pump safely and how to avoid potential hazards.
  2. Wear protective gear – When working with diaphragm pumps, it’s important to wear the proper protective gear, such as gloves, goggles, and a respirator. This will help to protect you from hazardous materials or liquids that may be released if the diaphragm ruptures.
  3. Use compatible fluids – Diaphragm pumps are designed to work with specific fluids. Using fluids that are not compatible with the pump can cause the diaphragm to rupture. Make sure to read the manual and only use fluids that are recommended for use with your pump.
  4. Don’t overload the pump – Overloading the pump can cause the diaphragm to rupture. Make sure to operate the pump within its recommended capacity.
  5. Check the pump regularly – Regularly checking the pump for signs of wear and tear can help to prevent accidents. Look for signs of leaks, cracks, or other damage, and replace any damaged parts immediately.
  6. Ground the pump – Make sure to properly ground the pump to prevent the risk of electrical shock. This is especially important if you’re working with a pump that’s powered by electricity.
  7. Keep the pump dry – Diaphragm pumps should not be exposed to moisture, as this can increase the risk of electrical shock. Make sure to keep the pump dry and in a well-ventilated area.

In conclusion, diaphragm pumps are an important tool for many industries, but they can also be dangerous if not used properly. By following these safety recommendations, you can ensure your safety and avoid potential hazards. Remember to always read the manual, wear protective gear, use compatible fluids, check the pump regularly, ground the pump, and keep it dry. Stay safe out there, my friends!

Cheers,

Diaphragm Pump Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Diaphragm Pump Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket