Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Drilling Pilot Holes Core Drilling Anchors To Floor Safe Work Method Statement (SWMS)

SKU:SWMAU918

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Drilling Pilot Holes Core Drilling Anchors To Floor Safe Work Method Statement (SWMS)

Introducing the Safe Work Method Statement for drilling pilot holes and core drilling anchors to the floor, a comprehensive and pre-filled document designed to help you implement a safe and successful project without any hassle. Our SWMS is tailored to suit the needs of all contractors and companies looking to carry out drilling pilot holes and core drilling anchors to the floor.

Here are some key features of our SWMS:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the necessary details, making it easy for you to understand and implement. It covers everything from project scope to PPE requirements, and more.
  • Fully Editable and Customisable: Our SWMS is provided in Microsoft Word format, giving you the flexibility to edit and customise it to suit your specific needs. This means you can tailor it to your specific project and site requirements.
  • Includes Scope and Project Details: Our SWMS includes all the necessary information about the scope of the project, including project details such as location, duration, and specific tasks to be carried out.
  • Includes High-Risk Machinery Checklist: Our SWMS includes a checklist of all high-risk machinery that will be on site during the project. This ensures that all necessary precautions are taken to prevent accidents.
  • Includes Staff Training Record: Our SWMS includes space for recording any staff training that has taken place. This helps ensure that all workers are properly trained and competent in their duties.
  • Includes Before and After Risk Ratings: Our SWMS includes a before and after risk rating, which allows you to assess the level of risk before and after the implementation of the SWMS.
  • Includes Legislative References: Our SWMS includes resources for use of legislative references, ensuring that you are compliant with all relevant laws and regulations.
  • Includes Required PPE: Our SWMS includes all PPE required for the project. This ensures that all workers are properly protected and reduces the risk of accidents.
  • Includes Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and risk assessment matrix, which helps you to identify and manage potential risks on site.
  • Includes SWMS Checklist: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This ensures that nothing is overlooked and all safety precautions are taken.
  • Includes Sign Off Page: Our SWMS includes a sign-off page for all workers and responsible persons. This ensures that everyone involved in the project understands and agrees to the safety measures in place.
  • Easy to Use and Customise: Our SWMS is designed to be easy to use and customise. It’s suitable for large contracts and tenders, including tier 1 contractual work.
  • Instant Download: Our SWMS is available for instant download, so you can start using it right away.

Overall, our Safe Work Method Statement for drilling pilot holes and core drilling anchors to the floor is a comprehensive and user-friendly document that helps you to implement a safe and successful project. We believe that our SWMS can help you achieve your project goals while ensuring the safety of everyone involved.

Here is some safety information related to drilling pilot holes core drilling anchors to floor.

Hazards:

  • Electrocution from contact with live electrical wires
  • Exposure to airborne dust and debris
  • Noise exposure
  • Slips, trips, and falls
  • Hand injuries from drilling equipment
  • Struck by objects or equipment

Control Measures:

  • Identify all potential hazards before starting the work
  • Ensure all electrical sources in the area are turned off and locked out before starting work
  • Wear appropriate personal protective equipment (PPE) such as safety glasses, earplugs, gloves, and hard hats
  • Use dust control measures such as vacuuming or wet sweeping to reduce airborne dust and debris
  • Use drilling equipment with safety guards and interlocks to prevent hand injuries
  • Ensure all workers are trained in safe work practices for working at heights and use fall protection equipment as required

Procedure:

  1. Conduct a risk assessment and identify all potential hazards.
  2. Ensure all electrical sources in the area are turned off and locked out before starting work.
  3. Wear appropriate PPE such as safety glasses, earplugs, gloves, and hard hats.
  4. Mark the location where the anchor is to be installed on the floor.
  5. Drill a pilot hole using an appropriate sized drill bit.
  6. Vacuum or wet sweep the area to control airborne dust and debris.
  7. Install the anchor using the appropriate equipment and techniques.
  8. Conduct a visual inspection of the installation to ensure it is secure.
  9. Clean up the work area and dispose of all debris appropriately.
  10. Record the details of the work conducted in the site logbook.

Emergency Procedures: In the event of an emergency, such as a worker injury or equipment failure, immediately stop work and notify the site supervisor or project manager. First aid should be administered as required, and emergency services should be contacted if necessary.

Gary’s Safety Tips

Hey everyone, it’s great to be back and today we’re going to talk about something that’s crucial for professionals in the construction and engineering industries: drilling pilot holes for core drilling anchors in the workplace.

First off, let’s talk about the dangers involved with this process. When you’re drilling pilot holes for core drilling anchors in a professional setting, there are a lot of things that can go wrong. One of the biggest risks is hitting an existing wire or pipe that could cause significant damage to the infrastructure of the building. This could lead to major repairs and costly downtime for the business.

Another danger to keep in mind is the potential for kickback. When using a power drill, if you don’t have a good grip on the tool or if the bit catches, it can cause the drill to spin out of control, which could lead to serious injuries to yourself or others on the job.

It’s important to remember that even the most experienced professionals are at risk for accidents, so it’s essential to take every precaution possible to ensure your safety and the safety of your colleagues.

So, what are some safety recommendations that you should follow when drilling pilot holes for core drilling anchors in the workplace?

First, always make sure that you’re using the right tool for the job. This means using a high-quality drill and bits that are designed specifically for the materials you’re working with. You should also ensure that the drill is in good working order, with all the safety features intact, and that you have a good grip on the tool before starting the job.

Second, before you start drilling, make sure you know exactly where you need to drill and that you’ve checked the area for any potential hazards. This could include pipes, wires, or even rebar that could be hidden beneath the surface. Taking the time to do a thorough inspection before starting the job can help you avoid costly mistakes and prevent accidents from happening.

Third, wear appropriate personal protective equipment (PPE). This includes safety glasses or goggles to protect your eyes from debris or flying particles, as well as ear protection to guard against the loud noise generated by the drill. You should also wear gloves to protect your hands and ensure that you have a good grip on the drill.

Fourth, always work with a partner or colleague. Having a second person on the job can help you keep an eye out for potential hazards, as well as provide assistance if something goes wrong. This is especially important when drilling at heights or in awkward positions where you might not have good visibility.

Finally, if you’re not sure about something, don’t be afraid to ask for help or advice. It’s always better to take a little extra time to make sure you’re doing things safely and correctly than to rush through a job and risk an accident.

In conclusion, drilling pilot holes for core drilling anchors in the workplace can be a risky job, but by following these safety recommendations, you can help reduce the chances of accidents or injuries on the job. Remember to always use the right tools, inspect the area for potential hazards, wear appropriate PPE, work with a partner or colleague, and don’t be afraid to ask for help if you need it.

Stay safe out there, my friends, and I’ll see you in the next one.

Cheers,

Drilling Pilot Holes Core Drilling Anchors To Floor Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Drilling Pilot Holes Core Drilling Anchors To Floor Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket