Edge Sander Safe Work Method Statement

Edge Sander Safe Work Method Statement (SWMS Template) delivered in Microsoft Word format for easy editing.

Edge Sander Safe Work Method Statement

Edge Sander Safe Work Method Statement (SWMS)

Looking to start work on site? Or maybe you're just looking to make your workplace safer, or possibly you're going for that next Government Tender - Either way, the Edge Sander Safe Work Method Statement (SWMS) is comprehensive, easy to understand and is designed to be implemented into your business with as little fuss as possible.

Look, we understand the challenges that many business owners face, let alone having to understand complicated safety documentation written in a language that nobody understands. That's why every Safe Work Method Statement Template is written in an easy to understand format, while at the same time being some of the highest quality in the industry. Our SWMS documents get you on site, save you loads of time and are easy to use. This way, you can get on with doing what you do best.


The Edge Sander Safe Work Method Statement (SWMS) covers the following Job Steps, including potential hazards, control measures and risk ratings:

  1. Planning and preparation
  2. Training and capabilities
  3. Assess onsite conditions
  4. Set up work area
  5. Temporary Traffic Control (TMP)
  6. Delivery of materials and equipment
  7. Pre-start checks
  8. Operation
  9. Cleaning and maintenance
  10. On completion

The Edge Sander Safe Work Method Statement Includes


Risk Assessment Matrix | Hierarchy of Controls | PPE | Emergency Response

Your Edge Sander Safe Work Method Statement is ready to be used in three easy steps:

  1. Add your company logo and details to the SWMS Template.
  2. Identify site specific risks.
  3. Address any site specific risks and add them to your SWMS Template.

Your SWMS is now read to use, and may also be used as training materials for work related activities such as Workplace Inductions or WHS-OHS Toolbox Meeting Talks.

Bluesafe Quick Tips:

  1. Don't wear loose clothing or gloves, keep long hair tied back. Wear appropriate PPE.
  2. Never adjust sander or setup while sander is running.
  3. Never remove guards or alter guards.

Edge Sander Safe Work Method Statement

Need to edit your
Edge Sander Safe Work Method Statement
$ 96.80 AUD
$ 96.80 AUD
Buy now

5 SWMS Pack

$86.50 each
$ 432.50 AUD
$ 432.50 AUD
Buy now

10 SWMS Pack

$76.50 each
$ 765.00 AUD
$ 765.00 AUD
Buy now

20 SWMS Pack

$65.50ea
$ 1,310.00 AUD
$ 1,310.00 AUD
Buy now

50 SWMS Pack

$55.50 each
$ 2,275.00 AUD
$ 2,275.00 AUD
Buy now

View a Safe Work Method Statement Example

See an example of a Safe Work Method Statement Template below. All our SWMS Template documents are comprehensive in nature, easy to use, and are a huge time saver. Our Safe Work Method Statement Templates are quick and easy to customise to your specific business or operation and are perfectly suited for every day use, for larger contracts and tenders right through to qualifying for contractor management platforms such as CM3.

What is a Safe Work Method Statement?

A SWMS is a document that outlines the high-risk construction work activities that will be performed at a workplace, the hazards that will be present as a result of these activities, and the controls that will be implemented to mitigate the risks.

A single SWMS can be utilised for numerous high-risk construction work activities, such as employing powered mobile plant, working at heights of more than 2 metres, and working near to a road that is used by traffic other than pedestrians.

A SWMS is an administrative control that is used to support higher-order controls, such as engineering controls, that are designed to remove or reduce hazards to health and safety.

A SWMS differs from other documentation such as a Job Safety Analysis or a Safe Operating Procedure in that it focuses on specific jobs or processes. A SWMS isn't meant to be a procedure; rather, it's a tool for supervisors and workers to check and monitor the workplace control measures. For high-risk work activities, a PCBU (Person Conducting a Business or Undertaking)  must prepare a Safe Work Method Statement (SWMS) or check that one has been prepared before starting work. It is important to note that before any work process has started, a SWMS must be prepared.

A PCBU, on the other hand, also must manage health and safety hazards by eliminating or reducing them as much as possible. Before beginning any work on a project, the principal contractor must also obtain a copy of the SWMS.

What information does a Safe Work Method Statement need to contain?

A Safe Work Method Statement should identify high-risk work and any specify hazards related to high-risk construction work as well as any health and safety risks. The SWMS should describe the risk-control measures to be implemented, monitored, and reviewed and also should describe how the risk-control measures will be effective at reducing or eliminating the risk, and how they will be implemented, monitored, and reviewed.

A Safe Work Method Statement should be concise and focus on outlining the specific risks identified for the high-risk work to be performed, as well as the control measures to be implemented to ensure that the work is completed safely.

A long and overly complex Safe Work Method Statement which could be difficult to comprehend, implement and monitor or review may be confusing for workers to mentally digest and therefore is not ideal in helping to reduce or eliminate risks in the workplace. It is imperative that workers, and especially those who do not speak English, are able to understand the Safe Work Method Statement. Consider having pictures or diagrams added to the SWMS as a more effective way of presenting information contained within the SWMS.

The SWMS should also contain other regulatory requirements to protect health and safety of all personnel, such as controlling noise exposure and manual job risks. Also, keep in mind that evidence of a completed risk assessment may be required by the regulator or for auditing reasons if the Safe Work Method Statement is based on a workplace-specific risk assessment.

Who's Responsible for creating the Safe Work Method Statement?

In collaboration with workers who will be directly engaged in the activity, the person responsible for carrying out the work is usually best equipped to prepare the SWMS document. In most cases, this means that a Safe Work Method Statement is created by the builder for his or her employees, or by the subcontractor for their employees.

To establish who is in the best position to prepare the Safe Work Method Statement, the principle contractor, builder, and/or subcontractors should decide who will take responsibility for the SWMS.

It's also a requirement that all managers, contractors, supervisors, and workers be involved in the creation of a Safe Work Method Statement. Workers must be consulted so that they understand the SWMS in depth and what they must do to establish and maintain risks and implement control measures to manage the risk. Sharing information and utilising workers' knowledge and experience may also aid in ensuring that the task is completed in accordance with the SWMS.

If your workplace has a Health and Safety Representative, they should also be contacted while creating a Safe Work Method Statement.

What does the principal contractor's responsibility entail?

Before beginning work, a principal contractor must take all reasonable steps to obtain a SWMS from any contractor performing high-risk work. If no SWMS exists, the principal contractor must arrange for one to be created, for example by the contractor or subcontractor.

A general contractor should establish plans to ensure that high-risk work is carried out safely and in compliance with the Safe Work Method Statement. This can be done by keeping an eye on how the SWMS is being implemented on the ground.

The principal contractors' WHS management plan must also include detailed arrangements for collecting, assessing, monitoring, and reviewing the SWMS, according to the WHS Regulations.

How to Write a Safe Work Method Statement 

If you're looking to write your own Edge Sander Safe Work Method Statement, the first step is to create the document as a Safe Work Method Statement Template. This way, you can use the same SWMS Template and then adjust the document for each different edge sander project as needed, making sure that your Edge Sander SWMS Template addresses any site specific risks.

The fastest and most cost effective solution would be to purchase a Bluesafe Edge Sander SWMS Template. However, if you decide to take the route of writing your own edge sander SWMS.

There are some fundamental requirements and information which you may want to consider adding to your Edge Sander SWMS such as:

  • Details of the person(s) responsible for making sure implementation, monitoring and compliance of the Edge Sander SWMS as well as any reviews and modifications.
  • Any information detailing safety meetings or toolbox talks in relation to edge sander work, scheduled in accordance with legislative requirements to first identify any site hazards where the edge sander work is being conducted, secondly, communicate the risks and hazards and then take steps to eliminate or control each hazard in relation to the edge sander work being done.
  • Any changes added to the Edge Sander SWMS after an incident or a near miss. 

Note: The Edge Sander SWMS must be kept and be available for inspection at least until the edge sander work is completed. Where the Edge Sander SWMS is revised, all versions of the SWMS Template should be kept. If a notifiable incident occurs in relation to the Edge Sander Safe Work Method Statement, the Edge Sander SWMS must be kept for a minimum of two years from the date of the incident.

Your Edge Sander Safe Work Method Statement Template should list any high risk construction work, such as:

  • Does the edge sander work outlined in the Edge Sander SWMS involve a risk of a person falling more than 2 meters?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out on or near pressurised gas mains or piping?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out on a telecommunication tower?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out on or near chemical, fuel or refrigerant lines?
  • Does the edge sander work outlined in the Edge Sander SWMS involve demolition of an element of a structure that is load-bearing?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out on or near energised electrical installations or services?
  • Does the edge sander work outlined in the Edge Sander SWMS involve demolition of an element related to the physical integrity of a structure?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out in an area that may have a contaminated or flammable atmosphere?
  • Does the edge sander work outlined in the Edge Sander SWMS involve, or is likely to involve, disturbing asbestos?
  • Does the edge sander work outlined in the Edge Sander SWMS involve tilt-up or precast concrete?
  • Does the edge sander work outlined in the Edge Sander SWMS involve structural alteration or repair that requires temporary support to prevent collapse?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out in or near a confined space?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out in an area of a workplace where there is any movement of powered mobile plant?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out in/near a shaft or trench deeper than 1.5m or tunnel involving use of explosives?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out in areas with artificial extremes of temperature?
  • Is the edge sander work outlined in the Edge Sander SWMS carried out in or near water or other liquid that involves a risk of drowning?
  • Does the edge sander work outlined in the Edge Sander SWMS involve diving work? 

Your Edge Sander Safe Work Method Statement should also identify any high-risk machinery or equipment in operation near the work site, such as: 

Your Edge Sander SWMS should also list any Personal Protective Equipment such as:

  • Foot Protection - Boots or closed in shoes
  • Hand Protection - Gloves
  • Head Protection - Hard hat or helmet
  • Hearing Protection - Ear plugs or ear muffs
  • Eye Protection - Safety glasses, goggles or face shields
  • Respiratory Protection - Face masks etc
  • Face Protection - Face shield, welding mask etc
  • High Visual Clothing
  • Protective Clothing - Overalls etc
  • Fall Protection - Safety harness, edge protection etc
  • Sun Protection - Sunscreen, hat etc
  • Hair and Jewellery Secured - Hair Net, etc

The Edge Sander SWMS must be reviewed continually to ensure it remains effective and relevant. The Edge Sander SWMS must be reviewed (and revised if necessary) if relevant control measures in relation to edge sander work are revised. The review process should be carried out in consultation with workers (including contractors and subcontractors) who may be affected by the Edge Sander and their health and safety representatives who represented that workgroup at the workplace.

When the Edge Sander SWMS has been revised, the person conducting a business or undertaking must ensure:

  1. All persons involved in the edge sander work are advised that a revision has been made and how they can access the revised Edge Sander SWMS;
  2. Persons who will need to change a work procedure or system as a result of the review are advised of the changes in a way that will enable them to implement their duties consistently with the revised Edge Sander SWMS; and,
  3. Workers that will be involved in the edge sander work are provided with the relevant information and instruction that will assist them to understand and implement the revised Edge Sander SWMS.

When preparing your Edge Sander SWMS, here are some topics you might want to also include to ensure you have covered as many risks and hazards as possible.  

Planning and Preparation When Working With and Around Edge Sander.

When writing your Edge Sander SWMS, establish any policies, procedures and systems for working with Edge Sander in consultation with the Principal Contractor and workers while being sure to establish:

  • Health and Safety guidelines for edge sander work
  • Emergency plans and evacuation procedures for the Edge Sander SWMS
  • Worker inductions for Edge Sander
  • Toolbox talks (safety meetings) added to the Edge Sander SWMS
  • Outline details of supervision of the site and workers on the Edge Sander SWMS
  • Check all workers qualifications, permits and competencies for Edge Sander operations
  • Ensure the Edge Sander and any related equipment is functioning correctly
  • Hazard reporting procedures in place and added to the Edge Sander SWMS
  • Incident reporting procedures in place and added to the Edge Sander SWMS
  • Exclusion zones when conducting edge sander work
  • Risk Assessment for TASK completed and noted on the Edge Sander SWMS
  • Electrical NO GO ZONES identified, discussed and documented. 

Assessment of Site Conditions

Thoroughly assess the work site/area conditions when working with edge sander and ensure that:

  1. A risk assessment of the edge sander work is conducted
  2. Suitable access and adequate space to conduct edge sander work safely
  3. Consult with all stakeholders on potential hazards and risks when conducting edge sander work
  4. Consultation with all relevant workers and personnel for Edge Sander SWMS details
  5. If conducting Edge Sander at night, ensure there is adequate lighting
  6. Check that the work environment is suitable for edge sander work 

Edge Sander Training and Worker Qualifications

Ensure all workers have the appropriate licenses in conducting Edge Sander as well as any qualifications that may be required for various edge sander projects before starting work. If White Cards are required, retain copies of all cards, licenses and qualifications of personnel.

All personnel must:

  1. Be trained and/or have received instructions on the Edge Sander SWMS including all safety and emergency procedures.
  2. Be qualified, knowledgeable and competent in Edge Sander operations and edge sander work as well as all delegated tasks/responsibilities
  3. Be fully aware and understand the scope of work in relation to the Edge Sander SWMS

Below are some examples of some Control Measures to be implemented when creating your own Edge Sander Safe Work Method Statement Template: 

  • Make sure the power outlet is safe and check plugs and leads for damage or wear.
  • Make sure all parts such as nuts, bolts and screws are secured.
  • Before using a sanding belt, check it for damages, wear and tears.
  • Do not let the gap between table and belt exceed 1.5mm.
  • Make sure the area around the machine is free from dust on the floor.
  • Never use faulty equipment.
  • Any loose parts must be replaced or tightened.
  • If the belt is found to be damaged or worn, it must be replaced.
  • If the gap is too wide, it must be adjusted.
  • Work area must be kept clean.
  • Be careful and do not bring hands and fingers near to sanding belt when sanding. For holding small items, use a holding tool or an aid such as a push block or a push stick.
  • Prevent unwanted movement of the item being sanded by maintaining control over it.
  • Never force work on to the sanding belt. Always allow to cut at its own pace.
  • Inspect the material to be sanded to assess the risk of any toxic dust while sanding.
  • Use an exhaust dust collector to remove the toxic dust generated.
  • Never use gloves while sanding.
  • Wearing eye protection is necessary.
  • While sanding make sure the work is placed flat on the table.
  • While sanding MDF or craftwood, wearing dust mask is essential.
  • Before starting to clean or maintain the sander, make sure power to the machine is switched off.
  • To remove build-up of sanding residue, use a brush or a tool.
  • For cleaning dust from the cooling vanes of an electric motor, use only low-pressure air.
  • Open the cover, release tension on the belt and remove old belt.
  • Make sure that the selected belt is the correct one, slide it on to the drums, and re-tension the belt for use.
  • Make sure the machine is de-energised before starting to clean or maintain.
  • Wearing eye protection is necessary before cleaning the sander.
  • When fitting a new belt, check the belt direction before fitting.
  • Centre the belt using tracking control.

National: View the Model Codes of Practice for Excavation Work on Safe Work Australia's website here.
Victoria: Victoria's Code of Practice for Excavation Work may be viewed on Work Safe Victoria's website here.