Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Excavator Safe Work Method Statement (SWMS)

SKU:SWMAU571

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Excavator Safe Work Method Statement (SWMS)

Introducing our Excavator Safe Work Method Statement (SWMS)! Our SWMS is designed to help you ensure that your project is completed safely and efficiently. Here are some key features of our product:

  • Pre-filled and Comprehensive: Our SWMS comes pre-filled with all the necessary details for working with an excavator. We understand that time is money, which is why our product is designed to be comprehensive and cover all bases, so you don’t have to worry about missing any critical details.
  • Fully editable and customisable in Microsoft Word format: Our SWMS is easy to edit and customise to meet your specific needs. You can tailor the document to suit your project and ensure that it aligns with your company’s procedures and requirements.
  • Includes scope of the project and project details: Our SWMS includes a section where you can detail the scope of the project, project location, and other critical details that are important for the safe and efficient completion of the project.
  • Includes a checklist of any high-risk machinery on site: Our SWMS includes a checklist of all high-risk machinery that will be used on the project site, including the excavator. This ensures that all machinery is inspected and maintained regularly to minimise the risk of accidents and injuries.
  • Includes space for recording any staff training: Our SWMS includes a section where you can record staff training and ensure that all workers are competent to operate the excavator safely and effectively.
  • Includes before and after risk ratings: Our SWMS includes a before and after risk assessment, which helps you measure the effectiveness of your safety measures and identify any areas where improvements can be made.
  • Includes resources for use of legislative references: Our SWMS includes resources for the use of legislative references. This helps you ensure that you comply with all relevant regulations and standards when working with an excavator.
  • Includes all PPE required: Our SWMS includes a list of all personal protective equipment (PPE) required when working with an excavator. This ensures that workers are properly protected from any hazards that may arise on the worksite.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix, which helps you identify potential hazards and assess the level of risk associated with each task.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This helps you ensure that all necessary steps have been taken to mitigate risks and ensure the safety of workers on the site.
  • Includes sign off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons. This helps you ensure that all workers have read and understood the SWMS and are committed to complying with its requirements.
  • Easy to use, easy to customise: Our SWMS is designed to be user-friendly and easy to customise, so you can quickly and easily create a document that meets your needs.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work. This ensures that our product is suitable for a wide range of projects and meets the needs of contractors at every level.
  • Instantly delivered download: Our SWMS is available as an instantly downloadable document, so you can start using it right away!

In summary, our Safe Work Method Statement for working with an excavator is a comprehensive, user-friendly, and customisable document that includes all the necessary information for completing your project safely and efficiently. Our SWMS is suitable for use on large contracts and tenders, and it is instantly downloadable, making it a convenient and accessible tool for contractors at every level.


Here is some safety information related to working with an excavator.

Hazards and Risks:

  • Risk of injuries to operators and other workers due to contact with moving parts of the excavator
  • Risk of injuries to operators and other workers due to falling debris
  • Risk of damage to underground services such as gas, water, and electricity
  • Risk of collapse of the excavation trench walls
  • Risk of injuries to workers due to unstable ground conditions
  • Risk of injuries to workers due to contact with hazardous materials and substances such as asbestos and chemicals

Control Measures:

  • Conduct a site inspection to identify hazards and assess risks before commencing work
  • Establish exclusion zones around the excavation area and restrict access to authorised personnel only
  • Mark and locate all underground services before commencing excavation work
  • Ensure that the excavation is done in accordance with the relevant excavation codes and standards
  • Provide suitable Personal Protective Equipment (PPE) such as hard hats, high visibility vests, and safety boots to all workers on site
  • Ensure that the excavator is operated only by authorised and competent operators
  • Ensure that the excavator is properly maintained and inspected before each use
  • Use appropriate digging techniques to prevent the collapse of the trench walls
  • Ensure that workers do not enter the excavation trench unless it has been shored or sloped according to the excavation codes and standards
  • Provide suitable respiratory protective equipment (RPE) to workers when handling hazardous materials and substances
  • Provide training to workers on the hazards and risks associated with excavation work and the control measures in place to manage those hazards and risks

Emergency Procedures:

  • In the event of an emergency, workers must immediately stop work and evacuate the site
  • First Aid facilities and personnel must be available on site at all times
  • Workers must be trained on the location and proper use of emergency equipment such as fire extinguishers and first aid kits

Gary’s Safety Tips

Hey, everyone! Today, we’re going to talk about something that’s extremely important for anyone who works in construction or any industry that involves digging: excavator safety.

Now, I know what you’re thinking. “Gary, why are we talking about excavator safety? That sounds boring.” But let me tell you something, my friends. There’s nothing boring about staying alive and avoiding accidents that could potentially cause serious injury or even death.

First and foremost, let’s talk about some of the dangers of working with an excavator. One of the biggest risks is what’s known as “struck-by” accidents. These occur when a worker is hit by a moving object, such as the excavator’s boom, bucket, or even the machine itself.

Another danger is getting caught or crushed between the excavator and another object, such as a wall or another piece of machinery. This can happen if the operator isn’t paying close enough attention or if the worker isn’t visible to the operator.

But here’s the thing, my friends. These accidents aren’t inevitable. There are steps you can take to minimise your risk and stay safe on the job.

First and foremost, you need to be properly trained to operate an excavator. If you’re not familiar with the machine, take a training course or work with someone who can show you the ropes. You should never operate an excavator unless you’re confident in your abilities and know how to do so safely.

Secondly, you need to wear the appropriate safety gear. This includes a hard hat, steel-toed boots, gloves, and any other protective equipment that’s recommended for your job site. Not only will this gear protect you in the event of an accident, but it will also help prevent accidents from happening in the first place.

Another important safety tip is to always be aware of your surroundings. This means paying close attention to where the excavator is moving, as well as where other workers are located. You should also make sure that your work area is well-lit and that there are no obstacles or hazards in your path.

It’s also important to communicate effectively with the excavator operator. If you’re working near the machine, make sure the operator knows where you are and what you’re doing. You should also be able to hear the operator clearly, so make sure you’re wearing ear protection if necessary.

Finally, it’s important to keep the excavator properly maintained. This means checking the machine regularly for any signs of wear or damage, as well as making sure that all safety features are working properly. If you notice any issues, report them to your supervisor right away so they can be addressed before they become a bigger problem.

So there you have it, my friends. Excavator safety isn’t something to take lightly, but by following these tips, you can minimise your risk of injury and stay safe on the job. Remember, accidents can happen to anyone, but with the right training, gear, and awareness, you can stay safe and avoid becoming another statistic.

Cheers,

Excavator Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Excavator Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket