Call 1300 877 609 to find out about the latest offers available.

Fire Prevention Safe Work Method Statement (SWMS)

SKU:SWMAU6272

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Fire Prevention Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement for fire prevention, designed to help you implement effective safety measures on your worksite. Our SWMS is a pre-filled and comprehensive document that covers all the necessary details to ensure a safe working environment.

Some key features of our SWMS include:

  • Fully editable and customisable in Microsoft Word format: Our SWMS is designed to be easily editable, so you can tailor it to your specific needs. We understand that every worksite is different, which is why our SWMS is flexible and customisable.
  • Includes the scope of the project and project details: Our SWMS includes all the necessary details to ensure that everyone on site is aware of the scope of the project and their role in it.
  • Checklist of any high-risk machinery on site: We understand that high-risk machinery can be a hazard on any worksite, which is why our SWMS includes a comprehensive checklist of any high-risk machinery on site.
  • Space for recording staff training: It’s important to ensure that all staff have received proper training on safety procedures, which is why our SWMS includes space to record any staff training.
  • Before and after risk ratings: Our SWMS includes before and after risk ratings, so you can track the effectiveness of your safety measures.
  • Resources for use of legislative references: Compliance with safety legislation is essential, which is why our SWMS includes resources for the use of legislative references.
  • All PPE required: Personal protective equipment (PPE) is vital on any worksite, which is why our SWMS includes all PPE required.
  • Risk assessment and risk assessment matrix: Our SWMS includes a risk assessment and risk assessment matrix, so you can assess the level of risk on your worksite and implement appropriate safety measures.
  • Checklist to ensure all requirements are covered: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS.
  • Sign off page for all workers and responsible persons: It’s important to ensure that everyone on site is aware of the safety measures in place, which is why our SWMS includes a sign off page for all workers and responsible persons.
  • Easy to use, easy to customise: Our SWMS is designed to be user-friendly and easy to customise, so you can implement effective safety measures with ease.
  • Suitable for large contracts and tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work.
  • Instantly delivered download: Our SWMS is available for instant download, so you can start implementing effective safety measures on your worksite right away.

We understand that safety is a top priority on any worksite, which is why our SWMS is designed to be as comprehensive and effective as possible. With our SWMS, you can implement the necessary safety measures to ensure a safe working environment.

Here is some safety information related to fire prevention.

  1. Hazard Identification:
  • Identify potential fire hazards in the work area and surrounding environment, including flammable materials, electrical equipment, and open flames.
  • Assess the risks associated with each hazard and determine appropriate control measures.
  1. Control Measures:
  • Develop and implement procedures to prevent fires from occurring, including regular maintenance of electrical equipment, proper storage and handling of flammable materials, and the use of fire extinguishers.
  • Train workers on the use of fire prevention equipment and procedures, including how to identify potential fire hazards and respond in the event of a fire.
  1. Emergency Response:
  • Develop and implement emergency response procedures in case of a fire, including procedures for evacuating the work area, alerting emergency services, and using fire extinguishers.
  • Conduct regular fire drills to ensure workers are familiar with the emergency response procedures and can respond effectively in the event of a fire.
  1. Personal Protective Equipment:
  • Provide workers with appropriate personal protective equipment (PPE), including fire-resistant clothing, gloves, and face shields.
  • Ensure workers wear the appropriate PPE when working with flammable materials or in areas where there is a risk of fire.
  1. Communication:
  • Maintain clear communication channels between workers and management regarding fire prevention procedures and emergency response procedures.
  • Ensure workers are informed of any changes to the fire prevention and emergency response procedures and receive regular training on these procedures.

Gary’s Safety Tips

Hey, everyone! Today, I want to talk about a very serious topic that can literally be a matter of life and death: fire prevention. Fires can happen anywhere and at any time, and they can cause immense damage to property and lives. That’s why it’s important to take fire prevention seriously and take steps to keep yourself and those around you safe.

Now, let’s talk about some of the dangers associated with fires. Firstly, fires can spread incredibly fast. Within just a few minutes, a small flame can turn into a raging inferno, engulfing everything in its path. If you’re not prepared and don’t have a plan in place, you could find yourself trapped and unable to escape.

Secondly, fires can be deadly. Not only can they cause physical harm to those caught in the flames, but they can also release toxic smoke and fumes that can be equally as dangerous. In fact, it’s often the smoke and fumes that cause the most harm, as they can quickly incapacitate you and prevent you from escaping.

So, how can you protect yourself and your loved ones from the dangers of fires? Well, the first step is to be prepared. That means having a fire safety plan in place and making sure everyone in your household knows what to do in case of a fire. This plan should include things like knowing the quickest way out of the house, identifying a safe meeting spot outside, and knowing how to call for help.

Another important step is to make sure your home is equipped with smoke detectors. These devices are your first line of defence against fires, as they can detect smoke and alert you before the flames have a chance to spread. Make sure you have smoke detectors in every room of your house, and test them regularly to make sure they’re working properly.

It’s also a good idea to have fire extinguishers on hand in case of small fires. However, it’s important to note that not all fires can be put out with an extinguisher, so make sure you know when it’s safe to use one and when it’s better to just get out of the house and call for help.

Now, let’s talk about some common causes of fires and how you can prevent them. One of the most common causes of house fires is cooking. It’s easy to get distracted when you’re cooking, but it’s important to stay focused and keep an eye on your food at all times. Also, be sure to keep flammable items like oven mitts and paper towels away from the stove.

Another common cause of fires is faulty electrical wiring. If you notice any frayed wires or loose connections in your home, be sure to have them repaired immediately. Also, avoid overloading outlets and extension cords, as this can cause them to overheat and potentially start a fire.

Smoking is another common cause of fires. If you smoke, it’s important to do so outside and away from flammable materials. Make sure to properly extinguish your cigarette or cigar when you’re finished, and never smoke in bed or when you’re drowsy.

Finally, it’s important to be aware of the dangers of candles and space heaters. Candles should never be left unattended, and should always be placed on a stable surface away from flammable items. Space heaters should also be placed on a stable surface and kept away from flammable materials, and should never be left unattended.

In conclusion, fire prevention is no joke. Fires can cause immense damage and put lives at risk, but with the right preparation and precautions, you can keep yourself and your loved ones safe. Remember to have a fire safety plan in place, make sure your home is equipped with smoke detectors, and take steps to prevent common causes of fires.

Hey, what’s up everyone? Today, I want to talk about a very serious topic that can literally be a matter of life and death: fire prevention. Fires can happen anywhere and at any time, and they can cause immense damage to property and lives. That’s why it’s important to take fire prevention seriously and take steps to keep yourself and those around you safe.

Now, let’s talk about some of the dangers associated with fires. Firstly, fires can spread incredibly fast. Within just a few minutes, a small flame can turn into a raging inferno, engulfing everything in its path. If you’re not prepared and don’t have a plan in place, you could find yourself trapped and unable to escape.

Secondly, fires can be deadly. Not only can they cause physical harm to those caught in the flames, but they can also release toxic smoke and fumes that can be equally as dangerous. In fact, it’s often the smoke and fumes that cause the most harm, as they can quickly incapacitate you and prevent you from escaping.

So, how can you protect yourself and your loved ones from the dangers of fires? Well, the first step is to be prepared. That means having a fire safety plan in place and making sure everyone in your household knows what to do in case of a fire. This plan should include things like knowing the quickest way out of the house, identifying a safe meeting spot outside, and knowing how to call for help.

Another important step is to make sure your home is equipped with smoke detectors. These devices are your first line of defence against fires, as they can detect smoke and alert you before the flames have a chance to spread. Make sure you have smoke detectors in every room of your house, and test them regularly to make sure they’re working properly.

It’s also a good idea to have fire extinguishers on hand in case of small fires. However, it’s important to note that not all fires can be put out with an extinguisher, so make sure you know when it’s safe to use one and when it’s better to just get out of the house and call for help.

Now, let’s talk about some common causes of fires and how you can prevent them. One of the most common causes of house fires is cooking. It’s easy to get distracted when you’re cooking, but it’s important to stay focused and keep an eye on your food at all times. Also, be sure to keep flammable items like oven mitts and paper towels away from the stove.

Another common cause of fires is faulty electrical wiring. If you notice any frayed wires or loose connections in your home, be sure to have them repaired immediately. Also, avoid overloading outlets and extension cords, as this can cause them to overheat and potentially start a fire.

Smoking is another common cause of fires. If you smoke, it’s important to do so outside and away from flammable materials. Make sure to properly extinguish your cigarette or cigar when you’re finished, and never smoke in bed or when you’re drowsy.

Finally, it’s important to be aware of the dangers of candles and space heaters. Candles should never be left unattended, and should always be placed on a stable surface away from flammable items. Space heaters should also be placed on a stable surface and kept away from flammable materials, and should never be left unattended.

In conclusion, fire prevention is no joke. Fires can cause immense damage and put lives at risk, but with the right preparation and precautions, you can keep yourself and your loved ones safe. Remember to have a fire safety plan in place, make sure your home is equipped with smoke detectors, and take steps to prevent common causes of fires.

Stay safe out there, and I hope this information has been helpful. Remember, taking the time to prepare and prevent fires can mean the difference between life and death. So, take it seriously and make fire prevention a priority in your home and workplace.

It’s also important to remember that fire prevention is not just a personal responsibility, but a collective one as well. If you see something that could potentially cause a fire, speak up and address it. Don’t assume that someone else will take care of it. It’s better to be safe than sorry.

Lastly, I want to emphasise the importance of staying calm in the event of a fire. Panic and confusion can be just as dangerous as the fire itself, so it’s important to stay calm and focused. Remember your fire safety plan and take the necessary steps to get yourself and your loved ones to safety.

In conclusion, fire prevention is something that we should all take seriously. By being prepared, staying vigilant, and taking the necessary precautions, we can help to prevent fires and keep ourselves and our communities safe. So, take the time to educate yourself on fire safety and make it a priority in your life. Thanks for tuning in, and until next time, stay safe!

Cheers,

Fire Prevention Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Fire Prevention Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket