Heating Oven Safe Work Method Statement

Heating Oven Safe Work Method Statement (SWMS Template) delivered in Microsoft Word format for easy editing.

Heating Oven Safe Work Method Statement

Heating Oven Safe Work Method Statement (SWMS)

Whether you need to get on site to start work, looking to create a safe work environment or pitching for that next big contract or government tender - the Heating Oven Safe Work Method Statement is easy to customise, easy to use and integrate into your current Safety Management System. If you don't have a Safety Management System, we need to talk, seriously, you don't need to be carrying that level of risk exposure in your business - we can help.

Look, we understand that business should be rewarding and not consumed by tedious red tape. The Safe Work Method Statement Template we create is in an easy to understand format, while at the same time being some of the highest quality documents in the industry. Our SWMS documents get you onsite, save you loads of time and are very user-friendly. This way, you can get on with doing what you do best.

The Heating Oven Safe Work Method Statement (SWMS) covers the following Job Steps, including potential hazards, control measures and risk ratings:

  1. Planning and preparation
  2. Training and capabilities
  3. Assess on site conditions
  4. Set up work area
  5. Temporary Traffic Control (TMP)
  6. Delivery of materials and equipment
  7. General precautions
  8. Rack ovens
  9. Rotating turntable ovens
  10. Shelf ovens
  11. Gas fired ovens
  12. Operation
  13. Cleaning and maintenance
  14. On completion

The Heating Oven Safe Work Method Statement, includes;


Risk Assessment Matrix | Hierarchy of Controls | PPE | Emergency Response

Your Heating Oven Safe Work Method Statement is ready to be used in three easy steps:

  1. Add your company logo and details to the SWMS Template.
  2. Identify site specific risks.
  3. Address any site specific risks and add them to your SWMS Template.

Your SWMS is now read to use, and may also be used as training materials for work related activities such as Workplace Inductions or WHS-OHS Toolbox Meeting Talks.

Bluesafe Quick Tips:

  1. Don't overload the heating oven.
  2. Don't block pressure-relief doors and panels.
  3. Re-evaluate when you modify equipment or the heating processes.

Heating Oven Safe Work Method Statement

Need to edit your
Heating Oven Safe Work Method Statement
$ 96.80 AUD
$ 96.80 AUD
Buy now

5 SWMS Pack

$86.50 each
$ 432.50 AUD
$ 432.50 AUD
Buy now

10 SWMS Pack

$76.50 each
$ 765.00 AUD
$ 765.00 AUD
Buy now

20 SWMS Pack

$65.50ea
$ 1,310.00 AUD
$ 1,310.00 AUD
Buy now

50 SWMS Pack

$55.50 each
$ 2,275.00 AUD
$ 2,275.00 AUD
Buy now

View a Safe Work Method Statement Example

See an example of a Safe Work Method Statement Template below. All our SWMS Template documents are comprehensive in nature, easy to use, and are a huge time saver. Our Safe Work Method Statement Templates are quick and easy to customise to your specific business or operation and are perfectly suited for every day use, for larger contracts and tenders right through to qualifying for contractor management platforms such as CM3.

What is a Safe Work Method Statement?

A SWMS is a document that outlines the high-risk construction work activities that will be performed at a workplace, the hazards that will be present as a result of these activities, and the controls that will be implemented to mitigate the risks.

A single SWMS can be utilised for numerous high-risk construction work activities, such as employing powered mobile plant, working at heights of more than 2 metres, and working near to a road that is used by traffic other than pedestrians.

A SWMS is an administrative control that is used to support higher-order controls, such as engineering controls, that are designed to remove or reduce hazards to health and safety.

A SWMS differs from other documentation such as a Job Safety Analysis or a Safe Operating Procedure in that it focuses on specific jobs or processes. A SWMS isn't meant to be a procedure; rather, it's a tool for supervisors and workers to check and monitor the workplace control measures. For high-risk work activities, a PCBU (Person Conducting a Business or Undertaking)  must prepare a Safe Work Method Statement (SWMS) or check that one has been prepared before starting work. It is important to note that before any work process has started, a SWMS must be prepared.

A PCBU, on the other hand, also must manage health and safety hazards by eliminating or reducing them as much as possible. Before beginning any work on a project, the principal contractor must also obtain a copy of the SWMS.

What information does a Safe Work Method Statement need to contain?

A Safe Work Method Statement should identify high-risk work and any specify hazards related to high-risk construction work as well as any health and safety risks. The SWMS should describe the risk-control measures to be implemented, monitored, and reviewed and also should describe how the risk-control measures will be effective at reducing or eliminating the risk, and how they will be implemented, monitored, and reviewed.

A Safe Work Method Statement should be concise and focus on outlining the specific risks identified for the high-risk work to be performed, as well as the control measures to be implemented to ensure that the work is completed safely.

A long and overly complex Safe Work Method Statement which could be difficult to comprehend, implement and monitor or review may be confusing for workers to mentally digest and therefore is not ideal in helping to reduce or eliminate risks in the workplace. It is imperative that workers, and especially those who do not speak English, are able to understand the Safe Work Method Statement. Consider having pictures or diagrams added to the SWMS as a more effective way of presenting information contained within the SWMS.

The SWMS should also contain other regulatory requirements to protect health and safety of all personnel, such as controlling noise exposure and manual job risks. Also, keep in mind that evidence of a completed risk assessment may be required by the regulator or for auditing reasons if the Safe Work Method Statement is based on a workplace-specific risk assessment.

Who's Responsible for creating the Safe Work Method Statement?

In collaboration with workers who will be directly engaged in the activity, the person responsible for carrying out the work is usually best equipped to prepare the SWMS document. In most cases, this means that a Safe Work Method Statement is created by the builder for his or her employees, or by the subcontractor for their employees.

To establish who is in the best position to prepare the Safe Work Method Statement, the principle contractor, builder, and/or subcontractors should decide who will take responsibility for the SWMS.

It's also a requirement that all managers, contractors, supervisors, and workers be involved in the creation of a Safe Work Method Statement. Workers must be consulted so that they understand the SWMS in depth and what they must do to establish and maintain risks and implement control measures to manage the risk. Sharing information and utilising workers' knowledge and experience may also aid in ensuring that the task is completed in accordance with the SWMS.

If your workplace has a Health and Safety Representative, they should also be contacted while creating a Safe Work Method Statement.

What does the principal contractor's responsibility entail?

Before beginning work, a principal contractor must take all reasonable steps to obtain a SWMS from any contractor performing high-risk work. If no SWMS exists, the principal contractor must arrange for one to be created, for example by the contractor or subcontractor.

A general contractor should establish plans to ensure that high-risk work is carried out safely and in compliance with the Safe Work Method Statement. This can be done by keeping an eye on how the SWMS is being implemented on the ground.

The principal contractors' WHS management plan must also include detailed arrangements for collecting, assessing, monitoring, and reviewing the SWMS, according to the WHS Regulations.

How to Write a Safe Work Method Statement 

If you're looking to write your own Heating Oven Safe Work Method Statement, the first step is to create the document as a Safe Work Method Statement Template. This way, you can use the same SWMS Template and then adjust the document for each different heating oven project as needed, making sure that your Heating Oven SWMS Template addresses any site specific risks.

The fastest and most cost effective solution would be to purchase a Bluesafe Heating Oven SWMS Template. However, if you decide to take the route of writing your own heating oven SWMS.

There are some fundamental requirements and information which you may want to consider adding to your Heating Oven SWMS such as:

  • Details of the person(s) responsible for making sure implementation, monitoring and compliance of the Heating Oven SWMS as well as any reviews and modifications. 
  • Any information detailing safety meetings or toolbox talks in relation to heating oven work, scheduled in accordance with legislative requirements to first identify any site hazards where the heating oven work is being conducted, secondly, communicate the risks and hazards and then take steps to eliminate or control each hazard in relation to the heating oven work being done.
  • Any changes added to the Heating Oven SWMS after an incident or a near miss. 

Note: The Heating Oven SWMS must be kept and be available for inspection at least until the heating oven work is completed. Where the Heating Oven SWMS is revised, all versions of the SWMS Template should be kept. If a notifiable incident occurs in relation to the Heating Oven Safe Work Method Statement, the Heating Oven SWMS must be kept for a minimum of two years from the date of the incident.

Your Heating Oven Safe Work Method Statement Template should list any high risk construction work, such as: 

  • Does the heating oven work outlined in the Heating Oven SWMS involve a risk of a person falling more than 2 meters?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out on or near pressurised gas mains or piping?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out on a telecommunication tower?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out on or near chemical, fuel or refrigerant lines?
  • Does the heating oven work outlined in the Heating Oven SWMS involve demolition of an element of a structure that is load-bearing?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out on or near energised electrical installations or services?
  • Does the heating oven work outlined in the Heating Oven SWMS involve demolition of an element related to the physical integrity of a structure?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out in an area that may have a contaminated or flammable atmosphere?
  • Does the heating oven work outlined in the Heating Oven SWMS involve, or is likely to involve, disturbing asbestos?
  • Does the heating oven work outlined in the Heating Oven SWMS involve tilt-up or precast concrete?
  • Does the heating oven work outlined in the Heating Oven SWMS involve structural alteration or repair that requires temporary support to prevent collapse?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out in or near a confined space?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out in an area of a workplace where there is any movement of powered mobile plant?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out in/near a shaft or trench deeper than 1.5m or tunnel involving use of explosives?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out in areas with artificial extremes of temperature?
  • Is the heating oven work outlined in the Heating Oven SWMS carried out in or near water or other liquid that involves a risk of drowning?
  • Does the heating oven work outlined in the Heating Oven SWMS involve diving work? 

Your Heating Oven Safe Work Method Statement should also identify any high-risk machinery or equipment in operation near the work site, such as:

Your Heating Oven SWMS should also list any Personal Protective Equipment such as: 

  • Foot Protection - Boots or closed in shoes
  • Hand Protection - Gloves
  • Head Protection - Hard hat or helmet
  • Hearing Protection - Ear plugs or ear muffs
  • Eye Protection - Safety glasses, goggles or face shields
  • Respiratory Protection - Face masks etc
  • Face Protection - Face shield, welding mask etc
  • High Visual Clothing
  • Protective Clothing - Overalls etc
  • Fall Protection - Safety harness, edge protection etc
  • Sun Protection - Sunscreen, hat etc
  • Hair and Jewellery Secured - Hair Net, etc 

The Heating Oven SWMS must be reviewed continually to ensure it remains effective and relevant. The Heating Oven SWMS must be reviewed (and revised if necessary) if relevant control measures in relation to heating oven work are revised. The review process should be carried out in consultation with workers (including contractors and subcontractors) who may be affected by the Heating Oven and their health and safety representatives who represented that workgroup at the workplace.

When the Heating Oven SWMS has been revised, the person conducting a business or undertaking must ensure:

  1. All persons involved in the heating oven work are advised that a revision has been made and how they can access the revised Heating Oven SWMS;
  2. Persons who will need to change a work procedure or system as a result of the review are advised of the changes in a way that will enable them to implement their duties consistently with the revised Heating Oven SWMS; and,
  3. Workers that will be involved in the heating oven work are provided with the relevant information and instruction that will assist them to understand and implement the revised Heating Oven SWMS. 

When preparing your Heating Oven SWMS, here are some topics you might want to also include to ensure you have covered as many risks and hazards as possible.

Planning and Preparation When Working With and Around Heating Oven. 

When writing your Heating Oven SWMS, establish any policies, procedures and systems for working with Heating Oven in consultation with the Principal Contractor and workers while being sure to establish:

  • Health and Safety guidelines for heating oven work
  • Emergency plans and evacuation procedures for the Heating Oven SWMS
  • Worker inductions for Heating Oven
  • Toolbox talks (safety meetings) added to the Heating Oven SWMS
  • Outline details of supervision of the site and workers on the Heating Oven SWMS
  • Check all workers qualifications, permits and competencies for Heating Oven operations
  • Ensure the Heating Oven and any related equipment is functioning correctly
  • Hazard reporting procedures in place and added to the Heating Oven SWMS
  • Incident reporting procedures in place and added to the Heating Oven SWMS
  • Exclusion zones when conducting heating oven work
  • Risk Assessment for TASK completed and noted on the Heating Oven SWMS
  • Electrical NO GO ZONES identified, discussed and documented.

Assessment of Site Conditions

Thoroughly assess the work site/area conditions when working with heating oven and ensure that:

  1. A risk assessment of the heating oven work is conducted
  2. Suitable access and adequate space to conduct heating oven work safely
  3. Consult with all stakeholders on potential hazards and risks when conducting heating oven work
  4. Consultation with all relevant workers and personnel for Heating Oven SWMS details
  5. If conducting Heating Oven at night, ensure there is adequate lighting
  6. Check that the work environment is suitable for heating oven work

Heating Oven Training and Worker Qualifications 

Ensure all workers have the appropriate licenses in conducting Heating Oven as well as any qualifications that may be required for various heating oven projects before starting work. If White Cards are required, retain copies of all cards, licenses and qualifications of personnel.

All personnel must: 

  1. Be trained and/or have received instructions on the Heating Oven SWMS including all safety and emergency procedures.
  2. Be qualified, knowledgeable and competent in Heating Oven operations and heating oven work as well as all delegated tasks/responsibilities
  3. Be fully aware and understand the scope of work in relation to the Heating Oven SWMS

Below are some examples of some Control Measures to be implemented when creating your own Heating Oven Safe Work Method Statement Template:

  • Clothing with open or wide sleeves or loose fitting clothing must not be worn.
  • Always wear gloves for placing products into or removing then from the hot oven.
  • Objects that are not required for normal work must not be placed in the oven.
  • To avoid being scalded, use dry cloth or oven mitts when picking up hot items.
  • Wearing heat resistant gloves and apron must be worn.
  • Hot objects must be handled with care.
  • Make sure the fan system is interlocked with the door to switch off when door is opened.
  • Be careful and do not bump into oven doors or tip over them when moving racks.
  • Table drive and fan must switch off when door is opened.
  • Be careful when reaching into oven to remove product.
  • If shelves are still rotating, do not attempt to remove products.
  • Make sure the fan system is interlocked with the door to switch off when door is opened.
  • Be careful while moving shelves.
  • Make sure the oven is purged before igniting gas burner.
  • Refer to the manufacturer's recommendations for using the oven for its intended purpose and proper loading.
  • For loading oven, follow the recommendations of the manufacturer.
  • When working with oven, try to avoid contact with hot surfaces by bare skin.
  • Never tamper with or remove any safety device or guard on the oven.
  • Doors of oven must be opened carefully. Always stand to one side to allow the steam and hot air to escape.
  • Never overload an oven.
  • Wearing heat resistant gloves and aprons is necessary.
  • Hot equipment or surfaces must have warning stickers or signs near them.
  • Before carrying out any maintenance or cleaning work on the oven, disconnect or isolate the oven from the electricity supply.
  • Do not clean the interior of the oven it is still hot.
  • Never clean an oven with a high-pressure water jet.

National: View the Model Codes of Practice for Excavation Work on Safe Work Australia's website here.
Victoria: Victoria's Code of Practice for Excavation Work may be viewed on Work Safe Victoria's website here.