Hydraulic Press Safe Work Method Statement

Hydraulic Press Safe Work Method Statement (SWMS Template) delivered in Microsoft Word format for easy editing.

Hydraulic Press Safe Work Method Statement

Hydraulic Press Safe Work Method Statement (SWMS)

Whether you need to get on site to start work, looking to create a safe work environment or pitching for that next big contract or government tender - the Hydraulic Press Safe Work Method Statement is easy to customise, easy to use and integrate into your current Safety Management System. If you don't have a Safety Management System, we need to talk, seriously, you don't need to be carrying that level of risk exposure in your business - we can help.

Look, we understand that business should be rewarding and not consumed by tedious red tape. The Safe Work Method Statement Template we create is in an easy to understand format, while at the same time being some of the highest quality documents in the industry. Our SWMS documents get you onsite, save you loads of time and are very user-friendly. This way, you can get on with doing what you do best.

The Hydraulic Press Safe Work Method Statement (SWMS) covers the following Job Steps, including potential hazards, control measures and risk ratings:

  1. Planning and preparation
  2. Training and capabilities
  3. Assess on site conditions
  4. Set up work area
  5. Temporary Traffic Control (TMP)
  6. Delivery of materials and equipment
  7. Setting up
  8. Using hydraulic press
  9. On completion

The Hydraulic Press Safe Work Method Statement, includes;


Risk Assessment Matrix | Hierarchy of Controls | PPE | Emergency Response

Your Hydraulic Press Safe Work Method Statement is ready to be used in three easy steps:

  1. Add your company logo and details to the SWMS Template.
  2. Identify site specific risks.
  3. Address any site specific risks and add them to your SWMS Template.

Now that your Safe Work Method Statement (SWMS) is ready for use, you can also make the SWMS document available as a training resource for activities such as WHS-OHS Toolbox Meeting Talks or Workplace Inductions.

Bluesafe Quick Tips:

  1. Check for any hydraulic fluid leaks.
  2. Ensure you are familiar with the operation of the hydraulic press.
  3. The press table must be clean and steel weights must be flat and secure.

Hydraulic Press Safe Work Method Statement

  • High quality and ready to use Hydraulic Press Safe Work Method Statement.
  • Instant Delivery.
  • Fully editable Safe Work Method Statement Template.
  • Easy to use - no fuss customisation.
  • Referenced to AS/NZS (Standards) and Legislation. 
Need to edit your
Hydraulic Press Safe Work Method Statement
$ 96.80 AUD
$ 96.80 AUD
Buy now

5 SWMS Pack

$86.50 each
$ 432.50 AUD
$ 432.50 AUD
Buy now

10 SWMS Pack

$76.50 each
$ 765.00 AUD
$ 765.00 AUD
Buy now

20 SWMS Pack

$65.50ea
$ 1,310.00 AUD
$ 1,310.00 AUD
Buy now

50 SWMS Pack

$55.50 each
$ 2,275.00 AUD
$ 2,275.00 AUD
Buy now

View a Safe Work Method Statement Example

See an example of a Safe Work Method Statement Template below. All our SWMS Template documents are comprehensive in nature, easy to use, and are a huge time saver. Our Safe Work Method Statement Templates are quick and easy to customise to your specific business or operation and are perfectly suited for every day use, for larger contracts and tenders right through to qualifying for contractor management platforms such as CM3.

What is a Safe Work Method Statement?

A SWMS is a document that outlines the high-risk construction work activities that will be performed at a workplace, the hazards that will be present as a result of these activities, and the controls that will be implemented to mitigate the risks.

A single SWMS can be utilised for numerous high-risk construction work activities, such as employing powered mobile plant, working at heights of more than 2 metres, and working near to a road that is used by traffic other than pedestrians.

A SWMS is an administrative control that is used to support higher-order controls, such as engineering controls, that are designed to remove or reduce hazards to health and safety.

A SWMS differs from other documentation such as a Job Safety Analysis or a Safe Operating Procedure in that it focuses on specific jobs or processes. A SWMS isn't meant to be a procedure; rather, it's a tool for supervisors and workers to check and monitor the workplace control measures. For high-risk work activities, a PCBU (Person Conducting a Business or Undertaking)  must prepare a Safe Work Method Statement (SWMS) or check that one has been prepared before starting work. It is important to note that before any work process has started, a SWMS must be prepared.

A PCBU, on the other hand, also must manage health and safety hazards by eliminating or reducing them as much as possible. Before beginning any work on a project, the principal contractor must also obtain a copy of the SWMS.

What information does a Safe Work Method Statement need to contain?

A Safe Work Method Statement should identify high-risk work and any specify hazards related to high-risk construction work as well as any health and safety risks. The SWMS should describe the risk-control measures to be implemented, monitored, and reviewed and also should describe how the risk-control measures will be effective at reducing or eliminating the risk, and how they will be implemented, monitored, and reviewed.

A Safe Work Method Statement should be concise and focus on outlining the specific risks identified for the high-risk work to be performed, as well as the control measures to be implemented to ensure that the work is completed safely.

A long and overly complex Safe Work Method Statement which could be difficult to comprehend, implement and monitor or review may be confusing for workers to mentally digest and therefore is not ideal in helping to reduce or eliminate risks in the workplace. It is imperative that workers, and especially those who do not speak English, are able to understand the Safe Work Method Statement. Consider having pictures or diagrams added to the SWMS as a more effective way of presenting information contained within the SWMS.

The SWMS should also contain other regulatory requirements to protect health and safety of all personnel, such as controlling noise exposure and manual job risks. Also, keep in mind that evidence of a completed risk assessment may be required by the regulator or for auditing reasons if the Safe Work Method Statement is based on a workplace-specific risk assessment.

Who's Responsible for creating the Safe Work Method Statement?

In collaboration with workers who will be directly engaged in the activity, the person responsible for carrying out the work is usually best equipped to prepare the SWMS document. In most cases, this means that a Safe Work Method Statement is created by the builder for his or her employees, or by the subcontractor for their employees.

To establish who is in the best position to prepare the Safe Work Method Statement, the principle contractor, builder, and/or subcontractors should decide who will take responsibility for the SWMS.

It's also a requirement that all managers, contractors, supervisors, and workers be involved in the creation of a Safe Work Method Statement. Workers must be consulted so that they understand the SWMS in depth and what they must do to establish and maintain risks and implement control measures to manage the risk. Sharing information and utilising workers' knowledge and experience may also aid in ensuring that the task is completed in accordance with the SWMS.

If your workplace has a Health and Safety Representative, they should also be contacted while creating a Safe Work Method Statement.

What does the principal contractor's responsibility entail?

Before beginning work, a principal contractor must take all reasonable steps to obtain a SWMS from any contractor performing high-risk work. If no SWMS exists, the principal contractor must arrange for one to be created, for example by the contractor or subcontractor.

A general contractor should establish plans to ensure that high-risk work is carried out safely and in compliance with the Safe Work Method Statement. This can be done by keeping an eye on how the SWMS is being implemented on the ground.

The principal contractors' WHS management plan must also include detailed arrangements for collecting, assessing, monitoring, and reviewing the SWMS, according to the WHS Regulations.

How to Write a Safe Work Method Statement

If you're looking to write your own Hydraulic Press Safe Work Method Statement, the first step is to create the document as a Safe Work Method Statement Template. This way, you can use the same SWMS Template and then adjust the document for each different hydraulic press project as needed, making sure that your Hydraulic Press SWMS Template addresses any site specific risks.

The fastest and most cost effective solution would be to purchase a Bluesafe Hydraulic Press SWMS Template. However, if you decide to take the route of writing your own hydraulic press SWMS.

There are some fundamental requirements and information which you may want to consider adding to your Hydraulic Press SWMS such as:

  • Details of the person(s) responsible for making sure implementation, monitoring and compliance of the Hydraulic Press SWMS as well as any reviews and modifications.
  • Any information detailing safety meetings or toolbox talks in relation to hydraulic press work, scheduled in accordance with legislative requirements to first identify any site hazards where the hydraulic press work is being conducted, secondly, communicate the risks and hazards and then take steps to eliminate or control each hazard in relation to the hydraulic presswork being done.
  • Any changes added to the Hydraulic Press SWMS after an incident or a near miss.

Note: The Hydraulic Press SWMS must be kept and be available for inspection at least until the hydraulic press work is completed. Where the Hydraulic Press SWMS is revised, all versions of the SWMS Template should be kept. If a notifiable incident occurs in relation to the Hydraulic Press SafeWork Method Statement, the Hydraulic Press SWMS must be kept for a minimum of two years from the date of the incident.

Your Hydraulic Press Safe Work Method Statement Template should list any high risk construction work, such as:

  • Does the hydraulic press work outlined in the Hydraulic Press SWMS involve a risk of a person falling more than 2 meters?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out on or near pressurised gas mains or piping?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out on a telecommunication tower?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out on or near chemical, fuel or refrigerant lines?
  • Does the hydraulic press work outlined in the Hydraulic Press SWMS involve demolition of an element of a structure that is load-bearing?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out on or near energised electrical installations or services?
  • Does the hydraulic press work outlined in the Hydraulic Press SWMS involve demolition of an element related to the physical integrity of a structure?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out in an area that may have a contaminated or flammable atmosphere?
  • Does the hydraulic press work outlined in the Hydraulic Press SWMS involve, or is likely to involve, disturbing asbestos?
  • Does the hydraulic press work outlined in the Hydraulic Press SWMS involve tilt-up or precast concrete?
  • Does the hydraulic press work outlined in the Hydraulic Press SWMS involve structural alteration or repair that requires temporary support to prevent collapse?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out in or near a confined space?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out in an area of a workplace where there is any movement of powered mobile plant?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out in/near a shaft or trench deeper than 1.5m or tunnel involving use of explosives?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out in areas with artificial extremes of temperature?
  • Is the hydraulic press work outlined in the Hydraulic Press SWMS carried out in or near water or other liquid that involves a risk of drowning?
  • Does the hydraulic press work outlined in the Hydraulic Press SWMS involve diving work?

Your Hydraulic Press Safe Work Method Statement should also identify any high-risk machinery or equipment in operation near the work site, such as: 

Your Hydraulic Press SWMS should also list any Personal Protective Equipment such as:

  • Foot Protection - Boots or closed in shoes
  • Hand Protection - Gloves
  • Head Protection - Hard hat or helmet
  • Hearing Protection - Ear plugs or ear muffs
  • Eye Protection - Safety glasses, goggles or face shields
  • Respiratory Protection - Face masks etc
  • Face Protection - Face shield, welding mask etc
  • High Visual Clothing
  • Protective Clothing - Overalls etc
  • Fall Protection - Safety harness, edge protection etc
  • Sun Protection - Sunscreen, hat etc
  • Hair and Jewellery Secured - Hair Net, etc

The Hydraulic Press SWMS must be reviewed continually to ensure it remains effective and relevant. The Hydraulic Press SWMS must be reviewed (and revised if necessary) if relevant control measures in relation to hydraulic press work are revised. The review process should be carried out in consultation with workers (including contractors and subcontractors) who may be affected by the Hydraulic Press and their health and safety representatives who represented that work group at the workplace. 

When the Hydraulic Press SWMS has been revised, the person conducting a business or undertaking must ensure:

  1. All persons involved in the hydraulic press work are advised that a revision has been made and how they can access the revised Hydraulic Press SWMS;
  2. Persons who will need to change a work procedure or system as a result of the review are advised of the changes in a way that will enable them to implement their duties consistently with the revised Hydraulic Press SWMS; and,
  3. Workers that will be involved in the hydraulic press work are provided with the relevant information and instruction that will assist them to understand and implement the revised Hydraulic Press SWMS.

When preparing your Hydraulic Press SWMS, here are some topics you might want to also include to ensure you have covered as many risks and hazards as possible.

Planning and Preparation When Working With and Around Hydraulic Press.

When writing your Hydraulic Press SWMS, establish any policies, procedures and systems for working with Hydraulic Press in consultation with the Principal Contractor and workers while being sure to establish: 

  • Health and Safety guidelines for hydraulic press work
  • Emergency plans and evacuation procedures for the Hydraulic Press SWMS
  • Worker inductions for Hydraulic Press
  • Toolbox talks (safety meetings) added to the Hydraulic Press SWMS
  • Outline details of supervision of the site and workers on the Hydraulic Press SWMS
  • Check all workers qualifications, permits and competencies for Hydraulic Press operations
  • Ensure the Hydraulic Press and any related equipment is functioning correctly
  • Hazard reporting procedures in place and added to the Hydraulic Press SWMS
  • Incident reporting procedures in place and added to the Hydraulic Press SWMS
  • Exclusion zones when conducting hydraulic press work
  • Risk Assessment for TASK completed and noted on the Hydraulic Press SWMS
  • Electrical NO GO ZONES identified, discussed and documented. 

Assessment of Site Conditions 

Thoroughly assess the work site/area conditions when working with hydraulic press and ensure that:

  1. A risk assessment of the hydraulic press work is conducted
  2. Suitable access and adequate space to conduct hydraulic press work safely
  3. Consult with all stakeholders on potential hazards and risks when conducting hydraulic press work
  4. Consultation with all relevant workers and personnel for Hydraulic Press SWMS details
  5. If conducting Hydraulic Press at night, ensure there is adequate lighting
  6. Check that the work environment is suitable for hydraulic press work

Hydraulic Press Training and Worker Qualifications

Ensure all workers have the appropriate licenses in conducting Hydraulic Press as well as any qualifications that may be required for various hydraulic press projects before starting work. If White Cards are required, retain copies of all cards, licenses and qualifications of personnel.

All personnel must:

  1. Be trained and/or have received instructions on the Hydraulic Press SWMS including all safety and emergency procedures.
  2. Be qualified, knowledgeable and competent in Hydraulic Press operations and hydraulic press work as well as all delegated tasks/responsibilities
  3. Be fully aware and understand the scope of work in relation to the Hydraulic Press SWMS    

Below are some examples of some Control Measures to be implemented when creating your own Hydraulic Press Safe Work Method Statement Template: 

  • Raising or lowering the table must be done carefully.
  • Before adjusting table, remove all loose blocks, parts, plates, etc.
  • Level the table and ensure that all table pins are fully inserted.
  • Where a table winch is fitted to a press, back off the winch after table pins are fully inserted, before placing load on table.
  • Use lifting jig or press ram and cables to lower and raise tables on large presses of over 60 tones.
  • Correct lifting methods must be followed when adjusting the table height.
  • Wearing Type 1 protective footwear is recommended.
  • Before placing load on table, ensure that all table pins are fully inserted.
  • Be careful when handling sharp or rough objects.
  • Secure work pieces on table and prevent from falling.
  • For round, stock pieces use V-blocks to hold in place.
  • For preventing damage or slippage due to metal-to-metal contact, use soft metal blocks such as of brass, copper, etc. or packing piece between work piece and ram.
  • Use screw adjustment (if available) for bringing ram into contact with work.
  • Ensure stability of work and alignment before applying pressure with ram.
  • Pieces of metal may be ejected from work piece at high velocity, due to metal fracture or shear under load.
  • Never use longer packing for maintaining contact between the ram and work piece. Preferably, raise the table.
  • Remove all packing, etc.,and clean the table after use.
  • Wearing leather gloves is recommended.
  • Support work pieces as near as possible to the point of pressure, for preventing distortions and damages.
  • To improve stability, provide additional packing at extremities.
  • Wearing eye protection and face shield is recommended.

National: View the Model Codes of Practice for Excavation Work on Safe Work Australia's website here.
Victoria: Victoria's Code of Practice for Excavation Work may be viewed on Work Safe Victoria's website here.