Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Hydraulic Press Safe Work Method Statement (SWMS)

SKU:SWMAU7781

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Hydraulic Press Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement for working with a hydraulic press – a pre-filled and comprehensive document that covers all the necessary details to help ensure safe work practices. Our SWMS is designed to be fully editable and customisable in Microsoft Word format, making it easy to adapt to your specific needs and requirements.

Key Features:

  • Comprehensive and Pre-filled: Our SWMS covers all the important details needed to work safely with a hydraulic press, including the scope of the project, project details, risk assessment and risk assessment matrix, legislative references, PPE requirements, and more.
  • Fully Editable: Our SWMS is fully editable and customisable in Microsoft Word format, which means you can easily add or remove any information to suit your specific requirements.
  • High Risk Machinery Checklist: Our SWMS includes a checklist of any high-risk machinery on site, which helps ensure that all necessary precautions are taken to prevent accidents.
  • Staff Training Record: Our SWMS includes a space for recording staff training, which is an essential aspect of ensuring safe work practices.
  • Before and After Risk Ratings: Our SWMS includes a section for recording before and after risk ratings, which helps ensure that all necessary precautions have been taken and that the work environment is safe.
  • Legislative References: Our SWMS includes resources for use of legislative references, which helps ensure that all necessary regulations are followed.
  • PPE Requirements: Our SWMS includes all PPE required to work safely with a hydraulic press, which helps ensure that workers are protected from any potential hazards.
  • Implementation Checklist: Our SWMS includes a checklist to ensure that all necessary requirements have been covered when implementing the SWMS, which helps ensure that all aspects of the work environment are safe.
  • Sign Off Page: Our SWMS includes a sign-off page for all workers and responsible persons, which helps ensure that everyone involved in the project is aware of the requirements and has agreed to follow them.
  • Easy to Use: Our SWMS is designed to be easy to use, with clear and concise language that makes it easy to understand.
  • Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, which means it can be used for a wide range of projects.
  • Instantly Delivered Download: Our SWMS is available for instant download, which means you can start using it right away.

Overall, our Safe Work Method Statement for working with a hydraulic press is a comprehensive and easy-to-use document that can help ensure safe work practices. It is fully editable and customisable, making it suitable for a wide range of projects, and includes all the necessary details to help prevent accidents and ensure a safe work environment.

Here is some safety information related to working with a hydraulic press.

  1. Hazard identification and risk assessment: Identify and assess the hazards associated with operating a hydraulic press, including the risk of crush injuries, electrical shock, and the release of hydraulic fluid under pressure.
  2. Personal protective equipment (PPE): Specify the required PPE for operating the hydraulic press, including safety glasses, steel-toed shoes, and gloves.
  3. Pre-operation inspection: Perform a pre-operation inspection of the hydraulic press to ensure it is in safe working condition. This should include checking the oil level, inspecting the electrical connections, and testing the emergency stop button.
  4. Setup and operation: Follow the manufacturer’s instructions for setting up and operating the hydraulic press. This should include aligning the workpiece, adjusting the press force and speed, and positioning the operator and any helpers safely.
  5. Maintenance and cleaning: Regularly inspect and maintain the hydraulic press to prevent breakdowns and ensure safe operation. This should include cleaning the machine, replacing worn or damaged parts, and performing periodic hydraulic fluid changes.
  6. Emergency procedures: Establish emergency procedures in the event of an accident or equipment failure. This should include procedures for shutting down the press, providing first aid to injured workers, and contacting emergency services.
  7. Training and supervision: Ensure that all workers who will be operating the hydraulic press are properly trained and supervised. This should include training on safe work practices, emergency procedures, and the proper use of PPE.

Gary’s Safety Tips

Hey there everyone, it’s great to be here with you today to talk about an important topic that I feel doesn’t get enough attention – working with hydraulic presses. These machines are powerful tools that can make a big difference in manufacturing, but they also come with some serious risks that you need to be aware of. So let’s dive in and talk about the dangers and safety recommendations when working with a hydraulic press.

First and foremost, let’s talk about what a hydraulic press is. These machines use hydraulic pressure to compress materials, often with a force of hundreds or even thousands of pounds per square inch. They’re commonly used in industries like automotive manufacturing, construction, and even in some home workshops.

Now, while hydraulic presses can be incredibly useful, they also pose some serious dangers if not used properly. The biggest risk is the potential for crushing injuries. If your hand or any other body part gets caught between the press’s moving parts, you could be in serious trouble. These machines are incredibly powerful and can easily crush bones, so it’s important to be extremely careful when working around them.

So, how can you stay safe when working with a hydraulic press? Here are a few key tips:

  1. Always wear proper personal protective equipment (PPE).

When working with any heavy machinery, it’s important to protect yourself from harm. That’s why it’s crucial to wear the right PPE when using a hydraulic press. This should include things like heavy-duty gloves, safety glasses, and steel-toed boots. Make sure your PPE is in good condition and fits properly, as ill-fitting gear can be just as dangerous as no gear at all.

  1. Never put your hands or any other body part between the moving parts of the press.

This may seem like common sense, but accidents can happen when you’re not paying attention. Always keep your hands and other body parts away from the press’s moving parts, and never try to reach in to adjust anything while the press is in operation. If you need to make adjustments, shut the machine down and follow proper lockout/tagout procedures to ensure it can’t be turned on accidentally.

  1. Follow proper lockout/tagout procedures.

Speaking of lockout/tagout, this is a crucial safety procedure that should always be followed when working with any heavy machinery. Lockout/tagout involves isolating the machine from its power source and securing it so it can’t be accidentally turned on. This is important not just for your own safety, but also for the safety of any other workers who may be in the area.

  1. Always use the right tools and materials.

When using a hydraulic press, it’s important to use the right tools and materials for the job. This includes things like the right dies and punches, as well as the right type and thickness of material you’re working with. Using the wrong tools or materials can cause the press to malfunction or even break, which can be extremely dangerous.

  1. Train and educate yourself and your team.

Finally, it’s important to make sure everyone who works with the press is properly trained and educated on its safe operation. This includes things like understanding lockout/tagout procedures, knowing how to properly use PPE, and understanding the risks associated with the machine. Regular safety training should be conducted to ensure everyone is up-to-date on best practices.

So there you have it – some key safety recommendations for working with a hydraulic press. Remember, these machines can be incredibly useful, but they can also be incredibly dangerous if not used properly. By following these tips and taking safety seriously, you can help ensure that you and your team stay safe on the job.

Thanks for tuning in today, and as always, stay safe out there!

Cheers,

Hydraulic Press Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Hydraulic Press Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket