Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Mobile Plant Safe Work Method Statement (SWMS)

SKU:SWMAU521

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Mobile Plant Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement (SWMS) specifically designed for mobile plant use. Our SWMS is a comprehensive tool that assists in identifying potential hazards and ensuring safety protocols are in place before starting work.

Key Features:

Pre-filled and Comprehensive: Our SWMS is pre-filled with a comprehensive list of safety requirements specific to mobile plant work. This document is your go-to reference guide to ensure safety protocols are followed.

• Fully Editable and Customisable: Our SWMS is available in Microsoft Word format, allowing easy editing and customisation to meet your specific project needs.

• Scope of Project and Project Details: Our SWMS includes a detailed scope of the project, outlining what tasks are involved and the resources required for each task.

• High Risk Machinery Checklist: Our SWMS includes a checklist of any high risk machinery that will be used on the site. This helps to identify potential hazards and to ensure all safety measures are in place.

• Staff Training Record: Our SWMS includes a space for recording staff training, ensuring all workers are trained and competent in the use of the mobile plant.

• Before and After Risk Ratings: Our SWMS includes a section for recording risk assessments before and after the implementation of safety measures. This helps to ensure that all risks are identified and appropriately managed.

• Legislative References: Our SWMS includes legislative references to ensure that all safety protocols are in compliance with Australian law.

• PPE Requirements: Our SWMS includes a list of all personal protective equipment (PPE) required for mobile plant use. This ensures that all workers are equipped with the necessary PPE to maintain a safe work environment.

• Risk Assessment and Risk Assessment Matrix: Our SWMS includes a risk assessment and a risk assessment matrix to identify and evaluate the level of risk associated with each task.

• Implementation Checklist: Our SWMS includes a checklist to ensure that all requirements have been covered when implementing the SWMS. This helps to ensure that all necessary safety protocols are in place.

• Sign Off Page: Our SWMS includes a sign off page for all workers and responsible persons, ensuring that everyone is aware of and agrees to the safety protocols in place.

• Easy to Use and Customise: Our SWMS is user-friendly and easy to customise, ensuring that it can be adapted to suit your specific project needs.

• Suitable for Large Contracts and Tenders: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work.

• Instant Download: Our SWMS is available for instant download, ensuring that you can start implementing safety protocols as soon as possible.

We understand the importance of safety in the workplace, which is why we have designed our SWMS with your safety in mind. Our SWMS provides a comprehensive guide to ensure that all necessary safety protocols are in place, reducing the risk of accidents and ensuring a safe work environment.

Here is some safety information related to mobile plants.

Hazards and Risks: The use of mobile plant equipment can present a range of hazards and risks to workers and others in the workplace. Some of the hazards and risks associated with mobile plant include:

  1. Striking pedestrians or other vehicles
  2. Overturning of machinery
  3. Entanglement in moving parts
  4. Crushing and impact injuries
  5. Falling objects or materials
  6. Collisions with overhead structures
  7. Fire or explosion from fuel or hydraulic leaks
  8. Exposure to noise, vibration, and dust
  9. Electrocution or electrical shock
  10. Accidents during maintenance or repair activities

Control Measures:

To manage and control the hazards and risks associated with the use of mobile plant equipment, the following control measures must be implemented:

  1. Conduct a pre-operational inspection of the mobile plant before use to ensure that it is in good working condition and all safety features are operational.
  2. Ensure all operators of mobile plant equipment are licensed, trained, and competent to operate the specific machinery they will be using.
  3. Implement traffic management plans and procedures to separate mobile plant from pedestrians and other vehicles in the workplace.
  4. Provide adequate lighting for night-time operations to ensure operators can see pedestrians and other vehicles.
  5. Ensure all mobile plant is equipped with roll-over protection structures (ROPS) and seatbelts and that they are worn at all times by the operator.
  6. Maintain clear visibility by removing obstacles or placing spotters to guide operators when visibility is obstructed.
  7. Implement safe work procedures for maintenance and repair activities, including lockout/tagout procedures and equipment isolation.
  8. Provide appropriate personal protective equipment (PPE) such as hard hats, safety glasses, high-visibility clothing, and hearing protection.
  9. Ensure that all mobile plant is adequately maintained and serviced, and all safety features are operational.

Emergency Procedures:

In the event of an emergency involving mobile plant equipment, workers must follow these procedures:

  1. Immediately stop the mobile plant equipment and turn off the engine.
  2. If the operator is trapped or injured, call for medical assistance immediately.
  3. Evacuate the area if there is a risk of fire or explosion.
  4. Follow the site-specific emergency procedures.

Gary’s Safety Tips

Hey there, everyone! Today, I want to talk to you about developing best practices for safe work method statements. This is a topic that is near and dear to my heart because I believe that everyone deserves to work in a safe and healthy environment.

Now, let’s dive right into it. What are safe work method statements, you might ask? Safe work method statements, or SWMS for short, are documents that outline the steps that need to be taken to complete a job safely. These statements are critical in any workplace where there are hazards that could lead to injury or harm to workers.

So, how can you develop best practices for safe work method statements? Well, first and foremost, it’s important to make sure that all of your SWMS are up to date and reflect the current state of your workplace. This means that you need to regularly review and update your SWMS to ensure that they are still relevant and effective.

One of the best ways to do this is by involving your workers in the process. Your workers are on the front lines, and they have valuable insights into the hazards that they face on a daily basis. By involving them in the development of your SWMS, you can ensure that the statements are effective and practical.

Another important best practice for safe work method statements is to make sure that they are easy to understand and follow. This means that you need to use clear and concise language, and avoid technical jargon or complex terminology. Your workers need to be able to understand the SWMS so that they can follow them effectively.

It’s also important to make sure that your SWMS are easily accessible to your workers. This means that you need to have them available in a variety of formats, such as printed copies, digital copies, and even mobile apps. By making the SWMS easily accessible, you can ensure that your workers have the information they need to stay safe on the job.

One of the most critical best practices for safe work method statements is to make sure that they are regularly reviewed and updated. Hazards and risks in the workplace can change rapidly, and it’s important to ensure that your SWMS reflect these changes. Regular reviews and updates can help to ensure that your workers are always following the most up-to-date procedures and practices.

Now, I know that some of you might be thinking that developing best practices for safe work method statements is a lot of work. And, yes, it can be. But the benefits of doing so are enormous. By having effective SWMS in place, you can reduce the risk of workplace injuries and accidents, improve productivity, and even reduce costs associated with workplace accidents.

But, most importantly, developing best practices for safe work method statements shows your workers that you care about their safety and well-being. When workers feel safe and valued, they are more productive, more engaged, and more likely to stay with your company for the long term.

So, there you have it, folks. Developing best practices for safe work method statements is critical to the success of any workplace. By involving your workers in the process, making the statements easy to understand and follow, regularly reviewing and updating them, and making them easily accessible, you can create a safe and healthy workplace for everyone.

Thanks for tuning in, and remember: safety always comes first!

Cheers,

Mobile Plant Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Mobile Plant Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket