Multi-Rip Saw Safe Work Method Statement

Multi-Rip Saw Safe Work Method Statement (SWMS Template) delivered in Microsoft Word format for easy editing.

Multi-Rip Saw Safe Work Method Statement

Multi-Rip Saw Safe Work Method Statement (SWMS)

Whether you need to get on site to start work, looking to create a safe work environment or pitching for that next big contract or government tender - the Multi-Rip Saw Safe Work Method Statement is easy to customise, easy to use and integrate into your current Safety Management System. If you don't have a Safety Management System, we need to talk, seriously, and you don't need to be carrying that level of risk exposure in your business - we can help.

Look, we understand that business should be rewarding and not consumed by tedious red tape. The Safe Work Method Statement Template we create is in an easy to understand format, while at the same time being some of the highest quality documents in the industry. Our SWMS documents get you onsite, save you loads of time and are very user-friendly. This way, you can get on with doing what you do best.

The Multi-Rip Saw Safe Work Method Statement (SWMS) covers the following Job Steps, including potential hazards, control measures and risk ratings:

  1. Planning and preparation
  2. Training and capabilities
  3. Assess onsite conditions
  4. Set up work area
  5. Temporary Traffic Control (TMP)
  6. Delivery of materials and equipment
  7. Pre-start checks
  8. Operation
  9. Cleaning and maintenance
  10. On completion

The Multi-Rip Saw Safe Work Method Statement Includes


Risk Assessment Matrix | Hierarchy of Controls | PPE | Emergency Response

Your Multi-Rip Saw Safe Work Method Statement is ready to be used in three easy steps:

  1. Add your company logo and details to the SWMS Template.
  2. Identify site specific risks.
  3. Address any site specific risks and add them to your SWMS Template.

Now that your Safe Work Method Statement (SWMS) is ready for use, you can also make the SWMS document available as a training resource for activities such as WHS-OHS Toolbox Meeting Talks or Workplace Inductions.

Bluesafe Quick Tips:

  1. Check that saw blade runs 'true' and does not wobble.
  2. Keep hands clear of workpiece and away from rotating blade.
  3. Before making adjustments (e.g. guarding) switch off and bring the machine to a complete standstill.

Multi-Rip Saw Safe Work Method Statement

  • Detailed and pre-filled Multi-Rip Saw Safe Work Method Statement.
  • Instant Delivery.
  • Fully editable Safe Work Method Statement Template.
  • Easy to customise - instructions included.
  • Referenced to Australian and NZ Standards (AS/NZS) and Legislation. 
Need to edit your
Multi-Rip Saw Safe Work Method Statement
$ 96.80 AUD
$ 96.80 AUD
Buy now

5 SWMS Pack

$86.50 each
$ 432.50 AUD
$ 432.50 AUD
Buy now

10 SWMS Pack

$76.50 each
$ 765.00 AUD
$ 765.00 AUD
Buy now

20 SWMS Pack

$65.50ea
$ 1,310.00 AUD
$ 1,310.00 AUD
Buy now

50 SWMS Pack

$55.50 each
$ 2,275.00 AUD
$ 2,275.00 AUD
Buy now

View a Safe Work Method Statement Example

See an example of a Safe Work Method Statement Template below. All our SWMS Template documents are comprehensive in nature, easy to use, and are a huge time saver. Our Safe Work Method Statement Templates are quick and easy to customise to your specific business or operation and are perfectly suited for every day use, for larger contracts and tenders right through to qualifying for contractor management platforms such as CM3.

What is a Safe Work Method Statement?

A SWMS is a document that outlines the high-risk construction work activities that will be performed at a workplace, the hazards that will be present as a result of these activities, and the controls that will be implemented to mitigate the risks.

A single SWMS can be utilised for numerous high-risk construction work activities, such as employing powered mobile plant, working at heights of more than 2 metres, and working near to a road that is used by traffic other than pedestrians.

A SWMS is an administrative control that is used to support higher-order controls, such as engineering controls, that are designed to remove or reduce hazards to health and safety.

A SWMS differs from other documentation such as a Job Safety Analysis or a Safe Operating Procedure in that it focuses on specific jobs or processes. A SWMS isn't meant to be a procedure; rather, it's a tool for supervisors and workers to check and monitor the workplace control measures. For high-risk work activities, a PCBU (Person Conducting a Business or Undertaking)  must prepare a Safe Work Method Statement (SWMS) or check that one has been prepared before starting work. It is important to note that before any work process has started, a SWMS must be prepared.

A PCBU, on the other hand, also must manage health and safety hazards by eliminating or reducing them as much as possible. Before beginning any work on a project, the principal contractor must also obtain a copy of the SWMS.

What information does a Safe Work Method Statement need to contain?

A Safe Work Method Statement should identify high-risk work and any specify hazards related to high-risk construction work as well as any health and safety risks. The SWMS should describe the risk-control measures to be implemented, monitored, and reviewed and also should describe how the risk-control measures will be effective at reducing or eliminating the risk, and how they will be implemented, monitored, and reviewed.

A Safe Work Method Statement should be concise and focus on outlining the specific risks identified for the high-risk work to be performed, as well as the control measures to be implemented to ensure that the work is completed safely.

A long and overly complex Safe Work Method Statement which could be difficult to comprehend, implement and monitor or review may be confusing for workers to mentally digest and therefore is not ideal in helping to reduce or eliminate risks in the workplace. It is imperative that workers, and especially those who do not speak English, are able to understand the Safe Work Method Statement. Consider having pictures or diagrams added to the SWMS as a more effective way of presenting information contained within the SWMS.

The SWMS should also contain other regulatory requirements to protect health and safety of all personnel, such as controlling noise exposure and manual job risks. Also, keep in mind that evidence of a completed risk assessment may be required by the regulator or for auditing reasons if the Safe Work Method Statement is based on a workplace-specific risk assessment.

Who's Responsible for creating the Safe Work Method Statement?

In collaboration with workers who will be directly engaged in the activity, the person responsible for carrying out the work is usually best equipped to prepare the SWMS document. In most cases, this means that a Safe Work Method Statement is created by the builder for his or her employees, or by the subcontractor for their employees.

To establish who is in the best position to prepare the Safe Work Method Statement, the principle contractor, builder, and/or subcontractors should decide who will take responsibility for the SWMS.

It's also a requirement that all managers, contractors, supervisors, and workers be involved in the creation of a Safe Work Method Statement. Workers must be consulted so that they understand the SWMS in depth and what they must do to establish and maintain risks and implement control measures to manage the risk. Sharing information and utilising workers' knowledge and experience may also aid in ensuring that the task is completed in accordance with the SWMS.

If your workplace has a Health and Safety Representative, they should also be contacted while creating a Safe Work Method Statement.

What does the principal contractor's responsibility entail?

Before beginning work, a principal contractor must take all reasonable steps to obtain a SWMS from any contractor performing high-risk work. If no SWMS exists, the principal contractor must arrange for one to be created, for example by the contractor or subcontractor.

A general contractor should establish plans to ensure that high-risk work is carried out safely and in compliance with the Safe Work Method Statement. This can be done by keeping an eye on how the SWMS is being implemented on the ground.

The principal contractors' WHS management plan must also include detailed arrangements for collecting, assessing, monitoring, and reviewing the SWMS, according to the WHS Regulations.

How to Write a Safe Work Method Statement 

If you're looking to write your own Multi-Rip Saw Safe Work Method Statement, the first step is to create the document as a Safe Work Method Statement Template. This way, you can use the same SWMS Template and then adjust the document for each different multi-rip saw project as needed, making sure that your Multi-Rip Saw SWMS Template addresses any site specific risks. 

The fastest and most cost effective solution would be to purchase a Bluesafe Multi-Rip Saw SWMS Template. However, if you decide to take the route of writing your own multi-rip saw SWMS.

There are some fundamental requirements and information which you may want to consider adding to your Multi-Rip Saw SWMS such as:

  • Details of the person(s) responsible for making sure implementation, monitoring and compliance of the Multi-Rip Saw SWMS as well as any reviews and modifications. 
  • Any information detailing safety meetings or toolbox talks in relation to multi-rip saw work, scheduled in accordance with legislative requirements to first identify any site hazards where the multi-rip saw work is being conducted, secondly, communicate the risks and hazards and then take steps to eliminate or control each hazard in relation to the multi-rip saw work being done. 
  • Any changes added to the Multi-Rip Saw SWMS after an incident or a near miss. 

Note: The Multi-Rip Saw SWMS must be kept and be available for inspection at least until the multi-rip saw work is completed. Where theMulti-Rip Saw SWMS is revised, all versions of the SWMS Template should be kept. If a notifiable incident occurs in relation to the Multi-Rip Saw Safe Work Method Statement, the Multi-Rip Saw SWMS must be kept for a minimum of two years from the date of the incident.

Your Multi-Rip Saw Safe Work Method Statement Template should list any high risk construction work, such as:

  • Does the multi-rip saw work outlined in the Multi-Rip Saw SWMS involve a risk of a person falling more than 2 meters?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out on or near pressurised gas mains or piping?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out on a telecommunication tower?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out on or near chemical, fuel or refrigerant lines?
  • Does the multi-rip saw work outlined in the Multi-Rip Saw SWMS involve demolition of an element of a structure that is load-bearing?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out on or near energised electrical installations or services?
  • Does the multi-rip saw work outlined in the Multi-Rip Saw SWMS involve demolition of an element related to the physical integrity of a structure?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out in an area that may have a contaminated or flammable atmosphere?
  • Does the multi-rip saw work outlined in the Multi-Rip Saw SWMS involve, or is likely to involve, disturbing asbestos?
  • Does the multi-rip saw work outlined in the Multi-Rip Saw SWMS involve tilt-up or precast concrete?
  • Does the multi-rip saw work outlined in the Multi-Rip Saw SWMS involve structural alteration or repair that requires temporary support to prevent collapse?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out in or near a confined space?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out in an area of a workplace where there is any movement of powered mobile plant?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out in/near a shaft or trench deeper than 1.5m or tunnel involving use of explosives?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out in areas with artificial extremes of temperature?
  • Is the multi-rip saw work outlined in the Multi-Rip Saw SWMS carried out in or near water or other liquid that involves a risk of drowning?
  • Does the multi-rip saw work outlined in the Multi-Rip Saw SWMS involve diving work?

Your Multi-Rip Saw Safe Work Method Statement should also identify any high-risk machinery or equipment in operation near the work site, such as:

Your Multi-Rip Saw SWMS should also list any Personal Protective Equipment such as:

  • Foot Protection - Boots or closed in shoes
  • Hand Protection - Gloves
  • Head Protection - Hard hat or helmet
  • Hearing Protection - Ear plugs or ear muffs
  • Eye Protection - Safety glasses, goggles or face shields
  • Respiratory Protection - Face masks etc
  • Face Protection - Face shield, welding mask etc
  • High Visual Clothing
  • Protective Clothing - Overalls etc
  • Fall Protection - Safety harness, edge protection etc
  • Sun Protection - Sunscreen, hat etc
  • Hair and Jewellery Secured - Hair Net, etc

The Multi-Rip Saw SWMS must be reviewed continually to ensure it remains effective and relevant. The Multi-Rip Saw SWMS must be reviewed (and revised if necessary) if relevant control measures in relation to multi-rip saw work are revised. The review process should be carried out in consultation with workers (including contractors and subcontractors) who may be affected by the Multi-Rip Saw and their health and safety representatives who represented that work group at the workplace.

When the Multi-Rip Saw SWMS has been revised, the person conducting a business or undertaking must ensure: 

  1. All persons involved in the multi-rip saw work are advised that a revision has been made and how they can access the revised Multi-Rip Saw SWMS;
  2. Persons who will need to change a work procedure or system as a result of the review are advised of the changes in a way that will enable them to implement their duties consistently with the revised Multi-Rip Saw SWMS; and,
  3. Workers that will be involved in the multi-rip saw work are provided with the relevant information and instruction that will assist them to understand and implement the revised Multi-Rip Saw SWMS.

When preparing your Multi-Rip Saw SWMS, here are some topics you might want to also include to ensure you have covered as many risks and hazards as possible.  

Planning and Preparation When Working With and Around and Multi-Rip Saw.

When writing your Multi-Rip Saw SWMS, establish any policies, procedures and systems for working with Multi-Rip Saw in consultation with the Principal Contractor and workers while being sure to establish:

  • Health and Safety guidelines for multi-rip saw work
  • Emergency plans and evacuation procedures for the Multi-Rip Saw SWMS
  • Worker inductions for and Multi-Rip Saw
  • Toolbox talks (safety meetings) added to the Multi-Rip Saw SWMS
  • Outline details of supervision of the site and workers on the Multi-Rip Saw SWMS
  • Check all workers qualifications, permits and competencies for Multi-Rip Saw operations
  • Ensure the Multi-Rip Saw and any related equipment is functioning correctly
  • Hazard reporting procedures in place and added to the Multi-Rip Saw SWMS
  • Incident reporting procedures in place and added to the Multi-Rip Saw SWMS
  • Exclusion zones when conducting multi-rip saw work
  • Risk Assessment for TASK completed and noted on the Multi-Rip Saw SWMS
  • Electrical NO GO ZONES identified, discussed and documented. 

Assessment of Site Conditions

Thoroughly assess the work site/area conditions when working with multi-rip saw and ensure that:

  1. A risk assessment of the multi-rip saw work is conducted
  2. Suitable access and adequate space to conduct multi-rip saw work safely
  3. Consult with all stakeholders on potential hazards and risks when conducting multi-rip saw work
  4. Consultation with all relevant workers and personnel for Multi-Rip Saw SWMS details
  5. If conducting and Multi-Rip Saw at night, ensure there is adequate lighting
  6. Check that the work environment is suitable for multi-rip saw work 

Multi-Rip Saw Training and Worker Qualifications

Ensure all workers have the appropriate licenses in conducting and Multi-Rip Saw as well as any qualifications that may be required for various multi-rip saw projects before starting work. If White Cards are required, retain copies of all cards, licenses and qualifications of personnel.

All personnel must: 

  1. Be trained and/or have received instructions on the Multi-Rip Saw SWMS including all safety and emergency procedures.
  2. Be qualified, knowledgeable and competent in Multi-Rip Saw operations and multi-rip saw work as well as all delegated tasks/responsibilities
  3. Be fully aware and understand the scope of work in relation to the Multi-Rip Saw SWMS

Below are some examples of some Control Measures to be implemented when creating your own Multi-Rip Saw Safe Work Method Statement Template: 

  • Before opening the hood, make sure all safety switches are in the off position.
  • There must be no debris or rubbish on the feed in and feed out tables.
  • Make sure debris is not blocking the operation and free movement of saw blades
  • Make sure saw blades are in working condition, sharpen or replace if worn or dull.
  • All connections and power leads must be in good condition.
  • Inspect the due date of inspection on the test tags; make sure the machine is in test.
  • Make sure all controls are in good working condition, especially the emergency stop switch.
  • Before starting up the fan, ensure the dust hopper is empty.
  • Before starting blades, ensure the safety switches are reset and the hood is closed.
  • If machine can be operated, never try to open the hood.
  • Debris must not obstruct saw blades.
  • Blades must be replaced as a set.
  • Never use a faulty machine.
  • Never use a machine, which is out of test period.
  • Never use a faulty machine.
  • Before commencing a cut, ensure the machine has reached full operating speed.
  • Check the size and run test pieces through the machine.
  • Before adjusting the cutting parts of the machine, ensure the machine is turned off and set in the safe mode.
  • Saws generate dust and other airborne particles that can be lodged in the eyes.
  • Operator's breathing zone may be encroached by respirable dust particles.
  • Operating saws will generate harmful levels of noise.
  • Feed stock can have rough edges and sawn edges of boards may cut hands.
  • A ten second wait is recommended for allowing machine to reach full speed.
  • If the machine can be operated, never open the hood.
  • Wearing eye protection is recommended.
  • Wearing P1 particulate dust mask is recommended.
  • Wearing hearing protection is recommended.
  • Wearing cut-resistant gloves is recommended.
  • Before opening hood, ensure all safety switches are off
  • There must be no debris or rubbish on the feed in and feed out tables.
  • Make sure debris is not blocking the operation and free movement of saw blades
  • Make sure saw blades are in working condition, sharpen or replace if worn or dull.
  • Sweep saw dust build-up from operating zone of saw by use of brush, etc.
  • Be careful not to blow dust from inside the machine onto the work area.
  • If the machine can be operated, never open the hood.
  • Debris must not obstruct saw blades.
  • Blades must be replaced as a set.
  • Never use compressed area for blowing dust from inside the saw onto the work area.

National: View the Model Codes of Practice for Excavation Work on Safe Work Australia's website here.
Victoria: Victoria's Code of Practice for Excavation Work may be viewed on Work Safe Victoria's website here.