Call 1300 877 609 to find out about the latest offers available.

WHS System Packages

Industry Specific and Customised Safety Management Systems

ISO 9001 Quality Packages

Quality Assurance Documentation System Packages

ISO 45001 Safety Packages

Industry Specific ISO 45001 Safety Management System Packages

NDIS & Aged Care Packages

NDIS and Aged Care Documentation Systems and Related Services

Unlock the latest package deals.

1300 877 609

Pastry Sheeter Safe Work Method Statement (SWMS)

SKU:SWMAU109

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Pastry Sheeter Safe Work Method Statement (SWMS)

Introducing our comprehensive Pastry Sheeter Safe Work Method Statement (SWMS) – the essential tool for ensuring workplace safety when working with this high-risk machinery. Our SWMS is designed to help you easily identify and manage potential hazards, ultimately minimising the risk of accidents and injuries.

Here are some key features of our SWMS:

  • Pre-filled and Comprehensive: Our SWMS is pre-filled with all the necessary details to get you started. It covers all the key aspects of working with a pastry sheeter, including the scope of the project, project details, risk assessment, PPE requirements, legislative references and more.
  • Fully editable and customisable: Our SWMS is fully editable and customisable in Microsoft Word format, making it easy for you to make any necessary changes to suit your specific project requirements.
  • Includes checklist of any high risk machinery on site: Our SWMS includes a checklist of any high-risk machinery on site, helping you to easily identify any potential hazards and manage them accordingly.
  • Includes space for recording any staff training: Our SWMS includes space for recording any staff training, ensuring that all workers are adequately trained and competent to use the pastry sheeter safely.
  • Includes before and after risk ratings: Our SWMS includes before and after risk ratings, providing a clear indication of the level of risk associated with the task before and after control measures have been implemented.
  • Includes resources for use of legislative references: Our SWMS includes resources for the use of legislative references, ensuring that you are up to date with the latest legislation and compliance requirements.
  • Includes all PPE required: Our SWMS includes all the necessary PPE required to work with a pastry sheeter, ensuring that all workers are adequately protected from potential hazards.
  • Includes risk assessment and risk assessment matrix: Our SWMS includes a comprehensive risk assessment and risk assessment matrix, helping you to identify and manage potential hazards effectively.
  • Includes a checklist to ensure all requirements have been covered: Our SWMS includes a checklist to ensure all requirements have been covered when implementing the SWMS, helping you to ensure that all necessary steps have been taken to manage potential hazards.
  • Includes sign-off page for all workers and responsible persons: Our SWMS includes a sign-off page for all workers and responsible persons, ensuring that everyone involved in the project has acknowledged and accepted their responsibilities for workplace safety.
  • Easy to use, easy to customise: Our SWMS is designed to be easy to use and easy to customise, ensuring that you can quickly and easily implement the necessary safety measures.
  • Suitable for large contracts and tenders, including tier 1 contractual work: Our SWMS is suitable for large contracts and tenders, including tier 1 contractual work, ensuring that you can confidently demonstrate your commitment to workplace safety.
  • Instantly delivered download: Our SWMS is available as an instant download, providing you with immediate access to this essential workplace safety tool.

We understand the importance of workplace safety, and our SWMS is designed to help you manage potential hazards and minimise the risk of accidents and injuries. With our SWMS for working with a pastry sheeter, you can be confident that you have the necessary tools to ensure workplace safety.

Here is some safety information related to working with a pastry sheeter.

Hazards: The potential hazards associated with using a pastry sheeter include:

  1. Entanglement and crushing hazard due to the moving parts of the machine.
  2. Electrical hazard due to the use of an electrical motor.
  3. Slipping and tripping hazard due to the presence of flour and/or water on the floor.
  4. Cuts and injuries from the sharp edges of the machine.
  5. Burns from the heated rollers.

Control Measures:

  1. Before using the machine, ensure that all safety guards and covers are in place and secured.
  2. Ensure that the pastry sheeter is properly grounded and that the electrical connections are in good condition.
  3. Clean the floor regularly and place a non-slip mat around the machine.
  4. Always wear personal protective equipment such as gloves and safety glasses when using the machine.
  5. Always use the machine as intended, and avoid touching the moving parts.
  6. Avoid wearing loose clothing or jewellery that could become entangled in the machine.
  7. When feeding the dough through the machine, use a dough scraper to prevent hands from getting too close to the rollers.
  8. Do not use the machine if it is not functioning properly, and report any faults to a supervisor.
  9. Keep the area around the machine clear of clutter and other hazards.
  10. Ensure that all personnel using the machine are trained and competent to do so.
  11. Ensure that emergency procedures are in place and that all personnel know how to respond in the event of an emergency.
  12. Turn off the machine when it is not in use.
  13. Never leave the machine unattended when it is in operation.
  14. Conduct regular inspections and maintenance on the machine to ensure that it is functioning properly.
  15. Display warning signs near the machine to alert personnel of the potential hazards.

Gary’s Safety Tips

Hey there, my friends! Today, I want to talk about a topic that is very important for those of you who work with pastries: pastry sheeters. These machines are great for rolling out dough and creating perfectly thin layers of pastry, but they can also be very dangerous if not used correctly. So, let’s dive in and talk about the dangers and safety recommendations when working with a pastry sheeter.

First things first, let’s talk about the dangers. Pastry sheeters are powerful machines that can easily cause injury if not handled with care. One of the biggest dangers is getting your fingers or hand caught in the rollers. This can happen if you are not paying attention or if you are trying to feed the machine too much dough at once. Another danger is the possibility of the dough tearing or getting stuck in the machine, which can cause the sheeter to malfunction or even break down.

Now, let’s talk about some safety recommendations to help you avoid these dangers. First and foremost, always read the instruction manual and follow the manufacturer’s guidelines for use. This will help you understand the proper way to operate the machine and how to avoid any potential hazards.

When using the pastry sheeter, make sure to always use the safety guard. This is a shield that covers the rollers and prevents your fingers from getting caught in the machine. It’s important to never remove or disable the safety guard, as this can be extremely dangerous.

Another safety recommendation is to never overload the machine with too much dough. Only feed the sheeter the amount of dough that it is designed to handle, and never force the dough through the machine. This can cause the machine to malfunction or break down, and can also be dangerous for the person operating it.

It’s also important to keep the pastry sheeter clean and well-maintained. Make sure to regularly clean the rollers and any other parts of the machine that come into contact with the dough. This will help prevent any build-up or debris that can cause the machine to malfunction or become a health hazard.

When working with the pastry sheeter, always wear appropriate clothing and protective gear. This includes gloves, aprons, and closed-toe shoes. It’s also a good idea to tie back long hair and remove any jewellery that could get caught in the machine.

Lastly, always pay attention when operating the pastry sheeter. Avoid distractions and make sure to focus on the task at hand. If you need to take a break, turn off the machine and wait for it to come to a complete stop before leaving it unattended.

In conclusion, pastry sheeters can be a great tool for creating perfect pastries, but they can also be very dangerous if not used correctly. It’s important to always follow the manufacturer’s guidelines, use the safety guard, never overload the machine, keep it clean and well-maintained, wear appropriate clothing and protective gear, and always pay attention when operating the machine. By following these safety recommendations, you can avoid potential hazards and ensure a safe and productive work environment. Stay safe out there, my friends!

Cheers,

Pastry Sheeter Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Pastry Sheeter Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket