Call 1300 877 609 to find out about the latest offers available.

Pipe Threader Safe Work Method Statement (SWMS)

SKU:SWMAU371

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Pipe Threader Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement (SWMS) for working with a pipe threader – your trusted companion for promoting safety and efficiency on the job site. Crafted with meticulous attention to detail, this comprehensive resource is designed to help you navigate the challenges of pipe threading while prioritising the well-being of your team. Let’s take a closer look at its key features:

  1. Pre-filled and Comprehensive:
    • We’ve taken the initiative to pre-fill the SWMS with essential information, providing you with a solid foundation to work from.
    • Each section has been carefully tailored to address the specific requirements and considerations associated with working with a pipe threader.
  2. Fully Editable and Customisable in Microsoft Word Format:
    • We understand the importance of flexibility in documenting your unique project needs.
    • Our SWMS is delivered in Microsoft Word format, allowing you to effortlessly customise it to suit your project requirements.
  3. Scope of the Project and Project Details:
    • Our SWMS includes a detailed scope of the project, ensuring that all relevant tasks and objectives are identified and addressed.
    • Project details such as location, timeline, and personnel involved are also included, promoting a clear understanding of the project parameters.
  4. Checklist of High-Risk Machinery:
    • Safety is our utmost priority. Our SWMS incorporates a comprehensive checklist of high-risk machinery typically encountered on-site.
    • This checklist acts as a reference point, reminding you to evaluate and address potential risks associated with the use of such machinery.
  5. Space for Recording Staff Training:
    • Proper training is vital to ensure the safe operation of machinery. Our SWMS provides dedicated space to record staff training, enabling you to keep track of who has received appropriate instruction and guidance.
  6. Before and After Risk Ratings:
    • To monitor and evaluate the effectiveness of risk control measures, our SWMS includes sections to record both before and after risk ratings.
    • This allows you to track the impact of implemented safety measures and make informed adjustments as necessary.
  7. Resources for Legislative References:
    • Staying compliant with relevant legislation is essential. Our SWMS provides resources and references to help you navigate the legislative requirements associated with pipe threading.
    • You can access the necessary information to ensure your work aligns with legal obligations.
  8. All Personal Protective Equipment (PPE) Required:
    • We leave no stone unturned when it comes to safety. Our SWMS includes a comprehensive list of the required Personal Protective Equipment (PPE) for working with a pipe threader.
    • By ensuring the correct PPE is worn, you can minimise the risk of injuries and create a secure working environment.
  9. Risk Assessment and Risk Assessment Matrix:
  10. Checklist for Complete Implementation of SWMS:
    • We’ve included a handy checklist within our SWMS, ensuring that you cover all the necessary requirements when implementing the statement.
    • This helps you maintain a systematic approach and ensures that no crucial steps are overlooked in promoting a safe work environment.
  11. Sign-off Page for Workers and Responsible Persons:
    • To promote accountability and ensure everyone is on board with the safety protocols, our SWMS includes a sign-off page.
    • All workers and responsible persons can acknowledge their understanding and commitment to following the outlined procedures.
  12. Easy to Use and Customise:
    • We understand the importance of user-friendly resources. Our SWMS is designed with simplicity in mind, making it easy for you to navigate and customise as needed.
    • With clear headings and intuitive formatting, you can focus on the content without any unnecessary complications.
  1. Suitable for Large Contracts and Tenders:
    • Our SWMS is tailored to meet the requirements of large contracts and tenders, including tier 1 contractual work.
    • Its comprehensive nature ensures that it addresses the specific needs and complexities associated with sizeable projects.
  2. Instantly Delivered Download:
    • We value your time and efficiency. As soon as your purchase is complete, you will receive an instant download of the SWMS.
    • No waiting, no delays – you can start utilising this valuable resource right away.

With a touch of personality mixed with professionalism, our Safe Work Method Statement for working with a pipe threader aims to be your trusted guide on the path to safety and productivity. By providing a pre-filled and comprehensive document that is fully editable and customisable, we empower you to tailor the SWMS to your unique project needs.

We recognise the importance of including all the necessary details within the SWMS, from the scope of the project and project details to a checklist of high-risk machinery. We also understand the significance of documenting staff training, recording before and after risk ratings, and incorporating legislative references.

Safety is paramount, which is why our SWMS includes a comprehensive list of required PPE, a thorough risk assessment, and a risk assessment matrix. To ensure a systematic approach, we provide a checklist for complete implementation of the SWMS.

Furthermore, our SWMS promotes accountability by including a sign-off page for workers and responsible persons, encouraging commitment to following the outlined procedures.

The user experience is at the forefront of our design. We have created an easy-to-use and easy-to-customise document that allows you to focus on the content without unnecessary complications.

Our SWMS is not only suitable for small-scale projects but also designed to meet the demands of large contracts and tenders, including tier 1 contractual work. We understand the complexities associated with such projects and have tailored our SWMS accordingly.

Lastly, we prioritise your time and efficiency. As soon as you complete your purchase, you will have instant access to the downloadable SWMS, enabling you to get started without any delays.

Choose our Safe Work Method Statement for working with a pipe threader, and let it be your trusted companion on the journey toward a safer and more efficient work environment.

Here is some safety information related to using a pipe threader.

  1. Task Description: The task involves the operation of a pipe threader machine to thread pipes.
  2. Hazard Identification: The following hazards have been identified:
  • Contact with moving parts of the machine, leading to injuries.
  • Risk of electrical shock if not using the machine correctly.
  • Strains and sprains due to manual handling of heavy pipes.
  • Trips and falls caused by obstructions or poor housekeeping.
  • Exposure to noise and vibration during machine operation.
  • Inhalation of fumes or dust generated during the process.
  1. Risk Assessment: The following risks have been assessed:
  • High risk: Contact with moving parts, electrical shock.
  • Medium risk: Strains and sprains, trips and falls, noise and vibration.
  • Low risk: Inhalation of fumes or dust.
  1. Control Measures:

4.1 Engineering Controls:

  • Ensure the pipe threader machine is in good working condition and regularly maintained.
  • Inspect the machine before use to ensure all guards are in place and functioning correctly.
  • Use anti-vibration mounts for the machine to reduce vibration transmission.
  • Provide adequate lighting in the work area to minimise the risk of trips and falls.
  • Ensure the work area is clear of obstructions and hazards.

4.2 Personal Protective Equipment (PPE):

  • Wear appropriate personal protective equipment:
    • Safety glasses or face shield to protect against flying debris.
    • Ear protection (earplugs or earmuffs) to minimise noise exposure.
    • Safety gloves to protect hands during manual handling tasks.
    • Steel-toed safety boots to protect against foot injuries.

4.3 Safe Operating Procedures:

  • Only trained and authorised personnel should operate the pipe threader machine.
  • Before starting the machine, ensure the power is switched off and disconnected.
  • Follow the manufacturer’s instructions for machine setup, including securing the pipe properly.
  • Always use the machine guards provided and do not remove or bypass them.
  • Stand in a stable position and maintain a good grip on the machine handles during operation.
  • Keep fingers, hands, and clothing away from moving parts.
  • Do not force the machine; let it work at its designed speed and capacity.
  • If the machine becomes jammed or malfunctions, switch off the power and follow lockout/tagout procedures before attempting to fix it.
  • When threading pipes, maintain a safe distance from the rotating pipe and the threader head.
  • Use lifting equipment or seek assistance when handling heavy pipes to prevent strains and sprains.
  • Regularly inspect the work area for trip hazards and address them promptly.

4.4 Emergency Procedures:

  • In the event of an emergency or accident, immediately stop the machine, switch off the power, and report the incident to the supervisor.
  • If there is a fire or electrical shock, activate the nearest emergency alarm and evacuate the area following the established evacuation plan.
  • In case of injury, administer first aid as trained and seek medical assistance as required.
  1. Training and Communication:
  • All personnel involved in pipe threader operations must receive adequate training on safe operating procedures, hazards, and emergency protocols.
  • Regular toolbox talks and safety meetings should be conducted to reinforce safe practices and address any concerns.

Gary’s Safety Tips

Hey there, folks! Today, I want to dive into an important topic that can save you a lot of headaches and keep you safe in your workshop. We’re talking about working with a pipe threader, and let me tell you, it’s crucial to know the dangers involved and the safety recommendations to follow. So, let’s get right into it, because your safety is my top priority!

Now, when it comes to working with a pipe threader, there are a few potential dangers lurking around the corner if you’re not careful. First and foremost, let’s talk about the risk of injury. Pipe threaders are powerful tools that can cause severe harm if not used properly. One wrong move, and you could end up with cuts, lacerations, or even more serious injuries. Trust me, folks, you don’t want to mess around with that!

Another danger to watch out for is the potential for fires or explosions. When working with pipes and threaders, there’s always a risk of sparks igniting flammable substances. So, it’s essential to be aware of your surroundings and make sure you’re in a safe and well-ventilated area. Remember, folks, safety first!

Now that we’ve covered the dangers, let’s talk about some safety recommendations to keep you out of harm’s way. These tips are going to be game-changers for you, trust me.

First things first, always wear the right protective gear. I’m talking about safety glasses, gloves, and appropriate clothing. You want to protect those eyes and hands, folks, because accidents can happen in the blink of an eye. Safety gear might not be the most stylish, but it’s worth it to keep yourself intact and injury-free.

Next up, make sure you receive proper training before operating a pipe threader. Don’t just dive into it blindly, folks! Take the time to learn how to use the tool correctly and understand all the safety precautions. Knowledge is power, and it can prevent some major mishaps.

When working with a pipe threader, it’s crucial to secure the pipe firmly. You don’t want it slipping or moving around while you’re operating the tool. Use clamps or other appropriate means to hold the pipe in place. Trust me, folks, a stable pipe is a safe pipe.

Now, let’s talk about electricity. If you’re using an electric pipe threader, ensure that you’re working with a grounded electrical outlet and using the right extension cords. Faulty electrical connections can lead to shocks, short circuits, or even electrical fires. So, be cautious and double-check your setup before getting to work.

Regular maintenance is also key, my friends. Keep your pipe threader clean and in good working condition. Inspect it for any damage or signs of wear and tear. If something doesn’t look right, have it repaired or replaced immediately. Don’t take any chances when it comes to your safety.

Last but certainly not least, never rush a job when using a pipe threader. Take your time, be patient, and focus on what you’re doing. It’s easy to get caught up in the hustle and bustle of work, but when you’re dealing with potentially dangerous tools, a momentary lapse in concentration can lead to disaster. So, slow down, breathe, and stay sharp.

Alright, my friends, we’ve covered some of the dangers and safety recommendations when it comes to working with a pipe threader. Remember, your safety is of the utmost importance. So, protect yourself, follow these guidelines, and keep on hustling in a safe and smart manner.

Stay safe out there, folks!

Regards,

Pipe Threader Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Pipe Threader Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket