Power Steering Flusher Safe Work Method Statement

Power Steering Flusher Safe Work Method Statement (SWMS Template) delivered in Microsoft Word format for easy editing.

Power Steering Flusher Safe Work Method Statement

Power Steering Flusher Safe Work Method Statement (SWMS)

Looking to start work on site? Or maybe you're just looking to make your workplace safer, or possibly you're going for that next Government Tender - Either way, the Power Steering Flusher Safe Work Method Statement (SWMS) is comprehensive, easy to understand and is designed to be implemented into your business with as little fuss as possible.

Look, we understand the challenges that many business owners face, let alone having to understand complicated safety documentation written in a language that nobody understands. That's why every Safe Work Method Statement Template is written in an easy to understand format, while at the same time being some of the highest quality in the industry. Our SWMS documents get you on site, save you loads of time and are easy to use. This way, you can get on with doing what you do best.


The Power Steering Flusher Safe Work Method Statement (SWMS) covers the following Job Steps, including potential hazards, control measures and risk ratings:

  1. Planning and preparation
  2. Training and capabilities
  3. Assess onsite conditions
  4. Set up work area
  5. Temporary Traffic Control (TMP)
  6. Delivery of materials and equipment
  7. General precautions
  8. Vehicle preparation
  9. Connection to vehicle
  10. Changing power steering oil
  11. On completion

The Power Steering Flusher Safe Work Method Statement Includes


Risk Assessment Matrix | Hierarchy of Controls | PPE | Emergency Response

Your Power Steering Flusher Safe Work Method Statement is ready to be used in three easy steps:

  1. Add your company logo and details to the SWMS Template.
  2. Identify site specific risks.
  3. Address any site specific risks and add them to your SWMS Template.

Your SWMS is now read to use, and may also be used as training materials for work related activities such as Workplace Inductions or WHS-OHS Toolbox Meeting Talks.

Power Steering Flusher Safe Work Method Statement

  • High quality and ready to use Power Steering Flusher Safe Work Method Statement.
  • Instant Delivery.
  • Fully editable Safe Work Method Statement (SWMS) Template.
  • Easy to customise - instructions included.
  • Referenced to AS/NZS (Standards) and Legislation. 
Need to edit your
Power Steering Flusher Safe Work Method Statement
$ 96.80 AUD
$ 96.80 AUD
Buy now

5 SWMS Pack

$86.50 each
$ 432.50 AUD
$ 432.50 AUD
Buy now

10 SWMS Pack

$76.50 each
$ 765.00 AUD
$ 765.00 AUD
Buy now

20 SWMS Pack

$65.50ea
$ 1,310.00 AUD
$ 1,310.00 AUD
Buy now

50 SWMS Pack

$55.50 each
$ 2,275.00 AUD
$ 2,275.00 AUD
Buy now

View a Safe Work Method Statement Example

See an example of a Safe Work Method Statement Template below. All our SWMS Template documents are comprehensive in nature, easy to use, and are a huge time saver. Our Safe Work Method Statement Templates are quick and easy to customise to your specific business or operation and are perfectly suited for every day use, for larger contracts and tenders right through to qualifying for contractor management platforms such as CM3.

What is a Safe Work Method Statement?

A SWMS is a document that outlines the high-risk construction work activities that will be performed at a workplace, the hazards that will be present as a result of these activities, and the controls that will be implemented to mitigate the risks.

A single SWMS can be utilised for numerous high-risk construction work activities, such as employing powered mobile plant, working at heights of more than 2 metres, and working near to a road that is used by traffic other than pedestrians.

A SWMS is an administrative control that is used to support higher-order controls, such as engineering controls, that are designed to remove or reduce hazards to health and safety.

A SWMS differs from other documentation such as a Job Safety Analysis or a Safe Operating Procedure in that it focuses on specific jobs or processes. A SWMS isn't meant to be a procedure; rather, it's a tool for supervisors and workers to check and monitor the workplace control measures. For high-risk work activities, a PCBU (Person Conducting a Business or Undertaking)  must prepare a Safe Work Method Statement (SWMS) or check that one has been prepared before starting work. It is important to note that before any work process has started, a SWMS must be prepared.

A PCBU, on the other hand, also must manage health and safety hazards by eliminating or reducing them as much as possible. Before beginning any work on a project, the principal contractor must also obtain a copy of the SWMS.

What information does a Safe Work Method Statement need to contain?

A Safe Work Method Statement should identify high-risk work and any specify hazards related to high-risk construction work as well as any health and safety risks. The SWMS should describe the risk-control measures to be implemented, monitored, and reviewed and also should describe how the risk-control measures will be effective at reducing or eliminating the risk, and how they will be implemented, monitored, and reviewed.

A Safe Work Method Statement should be concise and focus on outlining the specific risks identified for the high-risk work to be performed, as well as the control measures to be implemented to ensure that the work is completed safely.

A long and overly complex Safe Work Method Statement which could be difficult to comprehend, implement and monitor or review may be confusing for workers to mentally digest and therefore is not ideal in helping to reduce or eliminate risks in the workplace. It is imperative that workers, and especially those who do not speak English, are able to understand the Safe Work Method Statement. Consider having pictures or diagrams added to the SWMS as a more effective way of presenting information contained within the SWMS.

The SWMS should also contain other regulatory requirements to protect health and safety of all personnel, such as controlling noise exposure and manual job risks. Also, keep in mind that evidence of a completed risk assessment may be required by the regulator or for auditing reasons if the Safe Work Method Statement is based on a workplace-specific risk assessment.

Who's Responsible for creating the Safe Work Method Statement?

In collaboration with workers who will be directly engaged in the activity, the person responsible for carrying out the work is usually best equipped to prepare the SWMS document. In most cases, this means that a Safe Work Method Statement is created by the builder for his or her employees, or by the subcontractor for their employees.

To establish who is in the best position to prepare the Safe Work Method Statement, the principle contractor, builder, and/or subcontractors should decide who will take responsibility for the SWMS.

It's also a requirement that all managers, contractors, supervisors, and workers be involved in the creation of a Safe Work Method Statement. Workers must be consulted so that they understand the SWMS in depth and what they must do to establish and maintain risks and implement control measures to manage the risk. Sharing information and utilising workers' knowledge and experience may also aid in ensuring that the task is completed in accordance with the SWMS.

If your workplace has a Health and Safety Representative, they should also be contacted while creating a Safe Work Method Statement.

What does the principal contractor's responsibility entail?

Before beginning work, a principal contractor must take all reasonable steps to obtain a SWMS from any contractor performing high-risk work. If no SWMS exists, the principal contractor must arrange for one to be created, for example by the contractor or subcontractor.

A general contractor should establish plans to ensure that high-risk work is carried out safely and in compliance with the Safe Work Method Statement. This can be done by keeping an eye on how the SWMS is being implemented on the ground.

The principal contractors' WHS management plan must also include detailed arrangements for collecting, assessing, monitoring, and reviewing the SWMS, according to the WHS Regulations.

How to Write a Safe Work Method Statement 

If you're looking to write your own Power Steering Flusher Safe Work Method Statement, the first step is to create the document as a Safe Work Method Statement Template. This way, you can use the same SWMS Template and then adjust the document for each different power steering flusher project as needed, making sure that your Power Steering Flusher SWMS Template addresses any site specific risks. 

The fastest and most cost effective solution would be to purchase a Bluesafe Power Steering Flusher SWMS Template. However, if you decide to take the route of writing your own power steering flusher SWMS.

There are some fundamental requirements and information which you may want to consider adding to your Power Steering Flusher SWMS such as:

  • Details of the person(s) responsible for making sure implementation, monitoring and compliance of the Power Steering Flusher SWMS as well as any reviews and modifications.
  • Any information detailing safety meetings or toolbox talks in relation to power steering flusher work, scheduled in accordance with legislative requirements to first identify any site hazards where the power steering flusher work is being conducted, secondly, communicate the risks and hazards and then take steps to eliminate or control each hazard in relation to the power steering flusher work being done.
  • Any changes added to the Power Steering Flusher SWMS after an incident or a near miss. 

Note: The Power Steering Flusher SWMS must be kept and be available for inspection at least until the power steering flusher work is completed. Where the Power Steering Flusher SWMS is revised, all versions of the SWMS Template should be kept. If a notifiable incident occurs in relation to the Power Steering Flusher Safe Work Method Statement, the Power SteeringFlusher SWMS must be kept for a minimum of two years from the date of the incident.

Your Power Steering Flusher Safe Work Method Statement Template should list any high risk construction work, such as:

  • Does the power steering flusher work outlined in the Power Steering Flusher SWMS involve a risk of a person falling more than 2 meters?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out on or near pressurised gas mains or piping?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out on a telecommunication tower?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out on or near chemical, fuel or refrigerant lines?
  • Does the power steering flusher work outlined in the Power Steering Flusher SWMS involve demolition of an element of a structure that is load-bearing?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out on or near energised electrical installations or services?
  • Does the power steering flusher work outlined in the Power Steering Flusher SWMS involve demolition of an element related to the physical integrity of a structure?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out in an area that may have a contaminated or flammable atmosphere?
  • Does the power steering flusher work outlined in the Power Steering Flusher SWMS involve, or is likely to involve, disturbing asbestos?
  • Does the power steering flusher work outlined in the Power Steering Flusher SWMS involve tilt-up or precast concrete?
  • Does the power steering flusher work outlined in the Power Steering Flusher SWMS involve structural alteration or repair that requires temporary support to prevent collapse?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out in or near a confined space?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out in an area of a workplace where there is any movement of powered mobile plant?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out in/near a shaft or trench deeper than 1.5m or tunnel involving use of explosives?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out in areas with artificial extremes of temperature?
  • Is the power steering flusher work outlined in the Power Steering Flusher SWMS carried out in or near water or other liquid that involves a risk of drowning?
  • Does the power steering flusher work outlined in the Power Steering Flusher SWMS involve diving work

Your Power Steering Flusher Safe Work Method Statement should also identify any high-risk machinery or equipment in operation near the work site, such as:

Your Power Steering Flusher SWMS should also list any Personal Protective Equipment such as:

  • Foot Protection - Boots or closed in shoes
  • Hand Protection - Gloves
  • Head Protection - Hard hat or helmet
  • Hearing Protection - Ear plugs or ear muffs
  • Eye Protection - Safety glasses, goggles or face shields
  • Respiratory Protection - Face masks etc
  • Face Protection - Face shield, welding mask etc
  • High Visual Clothing
  • Protective Clothing - Overalls etc
  • Fall Protection - Safety harness, edge protection etc
  • Sun Protection - Sunscreen, hat etc
  • Hair and Jewellery Secured - Hair Net, etc

The Power Steering Flusher SWMS must be reviewed continually to ensure it remains effective and relevant. The Power Steering Flusher SWMS must be reviewed (and revised if necessary) if relevant control measures in relation to power steering flusher work are revised. The review process should be carried out in consultation with workers (including contractors and subcontractors) who may be affected by the Power Steering Flusher and their health and safety representatives who represented that work group at the workplace.

When the Power Steering Flusher SWMS has been revised, the person conducting a business or undertaking must ensure:

  1. All persons involved in the power steering flusher work are advised that a revision has been made and how they can access the revised Power Steering Flusher SWMS;
  2. Persons who will need to change a work procedure or system as a result of the review are advised of the changes in a way that will enable them to implement their duties consistently with the revised Power Steering Flusher SWMS; and,
  3. Workers that will be involved in the power steering flusher work are provided with the relevant information and instruction that will assist them to understand and implement the revised Power Steering Flusher SWMS.

When preparing your Power Steering Flusher SWMS, here are some topics you might want to also include to ensure you have covered as many risks and hazards as possible.

Planning and Preparation When Working With and Around Power Steering Flusher. 

When writing your Power Steering Flusher SWMS, establish any policies, procedures and systems for working with Power Steering Flusher in consultation with the Principal Contractor and workers while being sure to establish:

  • Health and Safety guidelines for power steering flusher work
  • Emergency plans and evacuation procedures for the Power Steering Flusher SWMS
  • Worker inductions for Power Steering Flusher
  • Toolbox talks (safety meetings) added to the Power Steering Flusher SWMS
  • Outline details of supervision of the site and workers on the Power Steering Flusher SWMS
  • Check all workers qualifications, permits and competencies for Power Steering Flusher operations
  • Ensure the Power Steering Flusher and any related equipment is functioning correctly
  • Hazard reporting procedures in place and added to the Power Steering Flusher SWMS
  • Incident reporting procedures in place and added to the Power Steering Flusher SWMS
  • Exclusion zones when conducting power steering flusher work
  • Risk Assessment for TASK completed and noted on the Power Steering Flusher SWMS
  • Electrical NO GO ZONES identified, discussed and documented. 

Assessment of Site Conditions

Thoroughly assess the work site/area conditions when using power steering flusher and ensure that:

  1. A risk assessment of the power steering flusher work is conducted
  2. Suitable access and adequate space to conduct power steering flusher work safely
  3. Consult with all stakeholders on potential hazards and risks when conducting power steering flusher work
  4. Consultation with all relevant workers and personnel for Power Steering Flusher SWMS details
  5. If conducting Power Steering Flusher at night, ensure there is adequate lighting
  6. Check that the work environment is suitable for power steering flusher work

Power Steering Flusher Training and Worker Qualifications

Ensure all workers have the appropriate licenses in conducting Power Steering Flusher as well as any qualifications that may be required for various power steering flusher projects before starting work. If White Cards are required, retain copies of all cards, licenses and qualifications of personnel.

All personnel must:

  1. Be trained and/or have received instructions on the Power Steering Flusher SWMS including all safety and emergency procedures.
  2. Be qualified, knowledgeable and competent in Power Steering Flusher operations and power steering flusher work as well as all delegated tasks/responsibilities
  3. Be fully aware and understand the scope of work in relation to the Power Steering Flusher SWMS 

Below are some examples of some Control Measures to be implemented when creating your own Power Steering Flusher Safe Work Method Statement Template:

  • Make sure that the area where work will be performed is clean and away from obstructions, waste, rubbish, etc., and that floors are clean of oil and grease.
  • Always carry out work in a well-ventilated area with good lighting.
  • Always set the transmission selector to PARK or the gear selector to neutral, and set the park brake prior to starting work on vehicle always make sure that vehicle is unable to move during servicing.
  • Use tail pipe exhaust hose for proper ventilation in an indoor area always provide suitable ventilation.
  • Visually Inspect all the fan belts, hoses, oil and fuel lines, and cooling system.
  • Inspect for and repair any power steering oil leaks be fore servicing unit.
  • Use proper size spanners and tools to remove/refit hoses, etc. repair any leaks and faults that could put workers at risk before commencing service.
  • Check that all hose attachments and cables are away from fan blades, exhaust system or any moving parts always keep away from moving parts.
  • Make sure that electrical connections are made to the proper polarity (RED/+ lead to RED/+ battery terminal, and BLACK/- lead to engine block ground wearing eye protection is necessary.
  • Always follow the vehicle manufacturer’s instructions regarding connection of leads make sure of connecting ground lead to part of vehicle engine away from battery.
  • Monitor system in use to make sure that hoses remain in place, and that no overfilling or emptying of the oil reservoir occurs always clean up any spills immediately.
  • Be careful and do not touch hot power steering oil when draining wearing eye protection is necessary.
  • Be aware of position of cooling system, and keep away from hot parts wearing suitable hand protection is necessary.
  • Make sure that all hoses are in place and properly attached before turning flushing unit on always provide adequate working space.

National: View the Model Codes of Practice for Excavation Work on Safe Work Australia's website here.
Victoria: Victoria's Code of Practice for Excavation Work may be viewed on Work Safe Victoria's website here.