Call 1300 877 609 to find out about the latest offers available.

Rotary Saw Safe Work Method Statement (SWMS)

SKU:SWMAU224

SWMS document delivered by email instantly.
Simply add your company logo.
Effortlessly add or delete information on any SWMS template.
Delivered in Microsoft Word format for easy editing.
Comply with Australian & New Zealand legislation.
Edit documents on the fly with the Microsoft Office Mobile App.
You only pay once, with unlimited use.

Download a Sample SWMS

Rotary Saw Safe Work Method Statement (SWMS)

Introducing our Safe Work Method Statement Template for using a rotary saw – a helpful tool to assist you in managing the risk assessment and safety requirements for your next project.

This pre-filled and comprehensive SWMS template is fully editable and customisable in Microsoft Word format, making it incredibly easy to modify to suit your specific needs. It includes all the necessary project details, including the scope of the project, checklist of high-risk machinery on site, and space to record staff training, before and after risk ratings, and legislative references.

Our SWMS template is designed to ensure that all necessary safety measures and personal protective equipment (PPE) are accounted for, and that risk assessments and risk assessment matrices are completed. Additionally, we’ve included a handy checklist to ensure all requirements have been covered when implementing the SWMS.

This template is suitable for both small and large-scale projects, including tier 1 contractual work, and is delivered as an instant download for your convenience. Our SWMS template also includes a sign-off page for all workers and responsible persons, ensuring that everyone is accountable for their role in maintaining safety on the worksite.

We understand the importance of managing risk and keeping workers safe, which is why we’ve created this easy-to-use and easy-to-customise SWMS template. With our template, you’ll have peace of mind knowing that all safety measures have been considered and documented, and that you’re providing a safe working environment for everyone involved.

Don’t leave safety to chance – download our Safe Work Method Statement Template for using a rotary saw today and take the first step towards a safer worksite!

Here is some safety information regarding Rotary Saw.

Overview: Rotary saws are commonly used in construction, woodworking, and other industries to cut materials such as wood, metal, and plastic. However, improper use of rotary saws can result in serious injury.

Personal Protective Equipment:

  • Eye protection (safety glasses or goggles)
  • Hearing protection (earplugs or earmuffs)
  • Dust mask or respirator
  • Hard hat
  • Gloves

Preparation:

  • Inspect the saw to ensure it is in good working condition and all guards are in place.
  • Select the appropriate blade for the material being cut.
  • Set up a safe work area with adequate lighting, ventilation, and space to move around.
  • Ensure that there are no tripping hazards and that the workpiece is securely clamped or held in place.

Operation:

  • Start the saw and allow it to reach full speed before making any cuts.
  • Hold the saw with both hands and keep fingers away from the blade.
  • Make sure the blade is not touching the workpiece before starting the cut.
  • Use a steady, even pressure to guide the saw through the material.
  • Do not force the saw through the material. Let the saw do the work.
  • Avoid cutting through nails, screws, or other metal objects that could damage the blade.
  • Keep the blade clear of sawdust and debris during use.
  • Do not overreach or lean over the saw while it is in operation.

Emergency Procedures:

  • In case of an emergency, shut off the saw immediately and seek medical attention if necessary.
  • In the event of a blade breakage, turn off the saw and remove the blade fragments before continuing work.
  • In the event of a fire, use a fire extinguisher or call the fire department.

Cleaning and Maintenance:

  • Turn off the saw and unplug it before performing any cleaning or maintenance.
  • Keep the saw and work area clean and free of sawdust and debris.
  • Regularly inspect the saw and blade for damage or wear and replace as necessary.
  • Follow the manufacturer’s instructions for lubrication and maintenance.

Gary’s Safety Tips

G’day folks, it’s Gary here, and today we’re gonna talk about accidents and injuries that can be avoided with Safe Work Method Statements (SWMS). As a business owner or manager, it’s your responsibility to ensure the safety of your employees in the workplace. Accidents and injuries can have a significant impact on your business, both financially and in terms of your reputation. By implementing a SWMS, you can significantly reduce the risk of accidents and injuries in your workplace.

Let’s start by defining what a Safe Work Method Statement is. A SWMS is a written document that outlines the potential hazards associated with a particular job or task and the measures that will be taken to control those hazards. It’s a step-by-step guide that ensures everyone involved in the job or task is aware of the potential risks and knows how to prevent accidents and injuries.

One of the most significant benefits of a SWMS is that it helps to identify potential hazards before work begins. By identifying hazards early, you can take steps to eliminate or control them, reducing the risk of accidents and injuries. This is particularly important in high-risk industries such as construction and mining, where a single accident can have devastating consequences.

Let’s take a look at some of the accidents and injuries that can be avoided with a SWMS.

Falls

Falls are one of the most common causes of workplace injuries and can result in serious injuries or even death. Falls can occur in a range of workplaces, from construction sites to office buildings. A SWMS can help to identify potential fall hazards and outline the steps that will be taken to prevent falls. This may include the use of safety harnesses, guardrails, or other safety equipment.

Manual Handling

Manual handling injuries are another common workplace injury. These injuries can occur when employees are required to lift, push, or pull heavy objects. A SWMS can help to identify potential manual handling hazards and outline the steps that will be taken to prevent injuries. This may include the use of lifting equipment or the implementation of safe lifting techniques.

Electrical Accidents

Electrical accidents can occur in a range of workplaces, from construction sites to office buildings. These accidents can result in serious injuries or even death. A SWMS can help to identify potential electrical hazards and outline the steps that will be taken to prevent accidents. This may include the use of appropriate personal protective equipment (PPE) and the implementation of safe work practices when working with electrical equipment.

Chemical Accidents

Chemical accidents can occur in workplaces where hazardous chemicals are used or stored. These accidents can result in serious injuries or even death. A SWMS can help to identify potential chemical hazards and outline the steps that will be taken to prevent accidents. This may include the use of appropriate PPE, the implementation of safe work practices when working with hazardous chemicals, and the provision of appropriate training to employees.

Machinery Accidents

Machinery accidents can occur in workplaces where heavy machinery is used, such as construction sites or factories. These accidents can result in serious injuries or even death. A SWMS can help to identify potential machinery hazards and outline the steps that will be taken to prevent accidents. This may include the use of appropriate PPE, the implementation of safe work practices when operating machinery, and the provision of appropriate training to employees.

In conclusion, accidents and injuries can have a significant impact on your business. By implementing a SWMS, you can significantly reduce the risk of accidents and injuries in your workplace. A SWMS helps to identify potential hazards before work begins, ensuring everyone involved in the job or task is aware of the potential risks and knows how to prevent accidents and injuries. So, if you haven’t already implemented a SWMS in your workplace, it’s time to take action and ensure the safety of your employees. Remember, workplace safety should always be a top priority for any business owner or manager.

Cheers,

Rotary Saw Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Rotary Saw Safe Work Method Statement (SWMS)

Total Inc GST

$96.80

After working for larger companies that take their safety seriously, Bluesafe’s documentation was on par with these companies. You’ve given us the ability to access the same sort of resources that only bigger companies have access to.

Warren Kingsley
Alstain Sheetmetal

 

I was very impressed with both the service and the turnaround time in dealing with Bluesafe. I was up and running with minimal fuss.

Dr Doug Josephides
Bayside Natural Medicine

 

You guys added real value with the required documentation that was high quality, affordable, very well put together and easy to implement. By the way, we secured our government tender for another seven years.

Rodney Prendergast
MMLA Group

 

Getting through an audit can be a daunting experience. Bluesafe’s documentation made the experience so much easier than we had anticipated and we passed the audit without any issues whatsoever. Thanks again, highly appreciated.

Brock Richards
Richards Quality Projects

 

Thanks so much for the quick response! Not only are the documents comprehensive, but on the same morning my audit was due I received the support I needed within the hour. Highly recommended!

Kathie Gorman
Kaygee Home and Community Support

 

From the initial contact we’ve had with Bluesafe we’ve found that your customer service, product quality and the after sales support to have been nothing short of excellent. You’ve given us a great customer experience.

Glenn King
Turnco Office Furniture

 

I just want to say a heartfelt thanks to the team at Bluesafe. Thank you so much for your service, help and support… We passed our NDIS audit!

Dr Scott Ling
Sustain Health

 

Need some help?

Phone Support
Monday to Friday
8:30am – 5pm
1300 877 609

Email Support
Monday to Friday
8:30am – 5pm
[email protected]

Support Ticket
Monday to Friday
8:30am – 5pm

Create a Support Ticket