Strapping Tool (Hand) Safe Work Method Statement

Strapping Tool (Hand) Safe Work Method Statement (SWMS Template) delivered in Microsoft Word format for easy editing.

Strapping Tool (Hand) Safe Work Method Statement

Strapping Tool (Hand) Safe Work Method Statement (SWMS)

Looking to start work on site? Or maybe you're just looking to make your workplace safer, or possibly you're going for that next Government Tender - Either way, the Strapping Tool (Hand) Safe Work Method Statement (SWMS) is comprehensive, easy to understand and is designed to be implemented into your business with as little fuss as possible.

Look, we understand the challenges that many business owners face, let alone having to understand complicated safety documentation written in a language that nobody understands. That's why every Safe Work Method Statement Template is written in an easy to understand format, while at the same time being some of the highest quality in the industry. Our SWMS documents get you on site, save you loads of time and are easy to use. This way, you can get on with doing what you do best.


The Strapping Tool (Hand) Safe Work Method Statement (SWMS) covers the following Job Steps, including potential hazards, control measures and risk ratings:

  1. Planning and preparation
  2. Training and capabilities
  3. Assess onsite conditions
  4. Set up work area
  5. Temporary Traffic Control (TMP)
  6. Delivery of materials and equipment
  7. General precautions
  8. Pre-start checks
  9. Operation (steel strap)
  10. Operation (plastic strap)
  11. On completion

The Strapping Tool (Hand) Safe Work Method Statement Includes


Risk Assessment Matrix | Hierarchy of Controls | PPE | Emergency Response

Your Strapping Tool (Hand) Safe Work Method Statement is ready to be used in three easy steps:

  1. Add your company logo and details to the SWMS Template.
  2. Identify site specific risks.
  3. Address any site specific risks and add them to your SWMS Template.

Now that your Safe Work Method Statement (SWMS) is ready for use, you can also make the SWMS document available as a training resource for activities such as WHS-OHS Toolbox Meeting Talks or Workplace Inductions.

Strapping Tool (Hand) Safe Work Method Statement

  • Detailed and pre-filled Strapping Tool (Hand) Safe Work Method Statement.
  • Immediate Download Delivery.
  • Fully editable Safe Work Method Statement Template.
  • Easy to customise - instructions included.
  • Referenced to AS/NZS (Standards) and Legislation. 
Need to edit your
Strapping Tool (Hand) Safe Work Method Statement
$ 96.80 AUD
$ 96.80 AUD
Buy now

5 SWMS Pack

$86.50 each
$ 432.50 AUD
$ 432.50 AUD
Buy now

10 SWMS Pack

$76.50 each
$ 765.00 AUD
$ 765.00 AUD
Buy now

20 SWMS Pack

$65.50ea
$ 1,310.00 AUD
$ 1,310.00 AUD
Buy now

50 SWMS Pack

$55.50 each
$ 2,275.00 AUD
$ 2,275.00 AUD
Buy now

View a Safe Work Method Statement Example

See an example of a Safe Work Method Statement Template below. All our SWMS Template documents are comprehensive in nature, easy to use, and are a huge time saver. Our Safe Work Method Statement Templates are quick and easy to customise to your specific business or operation and are perfectly suited for every day use, for larger contracts and tenders right through to qualifying for contractor management platforms such as CM3.

What is a Safe Work Method Statement?

A SWMS is a document that outlines the high-risk construction work activities that will be performed at a workplace, the hazards that will be present as a result of these activities, and the controls that will be implemented to mitigate the risks.

A single SWMS can be utilised for numerous high-risk construction work activities, such as employing powered mobile plant, working at heights of more than 2 metres, and working near to a road that is used by traffic other than pedestrians.

A SWMS is an administrative control that is used to support higher-order controls, such as engineering controls, that are designed to remove or reduce hazards to health and safety.

A SWMS differs from other documentation such as a Job Safety Analysis or a Safe Operating Procedure in that it focuses on specific jobs or processes. A SWMS isn't meant to be a procedure; rather, it's a tool for supervisors and workers to check and monitor the workplace control measures. For high-risk work activities, a PCBU (Person Conducting a Business or Undertaking)  must prepare a Safe Work Method Statement (SWMS) or check that one has been prepared before starting work. It is important to note that before any work process has started, a SWMS must be prepared.

A PCBU, on the other hand, also must manage health and safety hazards by eliminating or reducing them as much as possible. Before beginning any work on a project, the principal contractor must also obtain a copy of the SWMS.

What information does a Safe Work Method Statement need to contain?

A Safe Work Method Statement should identify high-risk work and any specify hazards related to high-risk construction work as well as any health and safety risks. The SWMS should describe the risk-control measures to be implemented, monitored, and reviewed and also should describe how the risk-control measures will be effective at reducing or eliminating the risk, and how they will be implemented, monitored, and reviewed.

A Safe Work Method Statement should be concise and focus on outlining the specific risks identified for the high-risk work to be performed, as well as the control measures to be implemented to ensure that the work is completed safely.

A long and overly complex Safe Work Method Statement which could be difficult to comprehend, implement and monitor or review may be confusing for workers to mentally digest and therefore is not ideal in helping to reduce or eliminate risks in the workplace. It is imperative that workers, and especially those who do not speak English, are able to understand the Safe Work Method Statement. Consider having pictures or diagrams added to the SWMS as a more effective way of presenting information contained within the SWMS.

The SWMS should also contain other regulatory requirements to protect health and safety of all personnel, such as controlling noise exposure and manual job risks. Also, keep in mind that evidence of a completed risk assessment may be required by the regulator or for auditing reasons if the Safe Work Method Statement is based on a workplace-specific risk assessment.

Who's Responsible for creating the Safe Work Method Statement?

In collaboration with workers who will be directly engaged in the activity, the person responsible for carrying out the work is usually best equipped to prepare the SWMS document. In most cases, this means that a Safe Work Method Statement is created by the builder for his or her employees, or by the subcontractor for their employees.

To establish who is in the best position to prepare the Safe Work Method Statement, the principle contractor, builder, and/or subcontractors should decide who will take responsibility for the SWMS.

It's also a requirement that all managers, contractors, supervisors, and workers be involved in the creation of a Safe Work Method Statement. Workers must be consulted so that they understand the SWMS in depth and what they must do to establish and maintain risks and implement control measures to manage the risk. Sharing information and utilising workers' knowledge and experience may also aid in ensuring that the task is completed in accordance with the SWMS.

If your workplace has a Health and Safety Representative, they should also be contacted while creating a Safe Work Method Statement.

What does the principal contractor's responsibility entail?

Before beginning work, a principal contractor must take all reasonable steps to obtain a SWMS from any contractor performing high-risk work. If no SWMS exists, the principal contractor must arrange for one to be created, for example by the contractor or subcontractor.

A general contractor should establish plans to ensure that high-risk work is carried out safely and in compliance with the Safe Work Method Statement. This can be done by keeping an eye on how the SWMS is being implemented on the ground.

The principal contractors' WHS management plan must also include detailed arrangements for collecting, assessing, monitoring, and reviewing the SWMS, according to the WHS Regulations.

How to Write a Safe Work Method Statement 

If you're looking to write your own Strapping Tool (Hand) Safe Work Method Statement, the first step is to create the document as a Safe Work Method Statement Template. This way, you can use the same SWMS Template and then adjust the document for each different strapping tool (hand) project as needed, making sure that your Strapping Tool (Hand) SWMS Template addresses any site specific risks. 

The fastest and most cost effective solution would be to purchase a Bluesafe Strapping Tool (Hand) SWMS Template. However, if you decide to take the route of writing your own strapping tool (hand) SWMS.

There are some fundamental requirements and information which you may want to consider adding to your Strapping Tool (Hand) SWMS such as:

  • Details of the person(s) responsible for making sure implementation, monitoring and compliance of the Strapping Tool (Hand) SWMS as well as any reviews and modifications. 
  • Any information detailing safety meetings or toolbox talks in relation to strapping tool (hand) work, scheduled in accordance with legislative requirements to first identify any site hazards where the strapping tool (hand) work is being conducted, secondly, communicate the risks and hazards and then take steps to eliminate or control each hazard in relation to the strapping tool (hand) work being done.
  • Any changes added to the Strapping Tool (Hand) SWMS after an incident or a near miss. 

Note: The Strapping Tool (Hand) SWMS must be kept and be available for inspection at least until the strapping tool (hand) work is completed. Where the Strapping Tool (Hand) SWMS is revised, all versions of the SWMS Template should be kept. If a notifiable incident occurs in relation to the Strapping Tool (Hand) Safe Work Method Statement, the Strapping Tool (Hand) SWMS must be kept for a minimum of two years from the date of the incident.

Your Strapping Tool (Hand) Safe Work Method StatementTemplate should list any high risk construction work, such as: 

  • Does the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS involve a risk of a person falling more than 2 meters?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out on or near pressurised gas mains or piping?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out on a telecommunication tower?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out on or near chemical, fuel or refrigerant lines?
  • Does the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS involve demolition of an element of a structure that is load-bearing?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out on or near energised electrical installations or services?
  • Does the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS involve demolition of an element related to the physical integrity of a structure?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out in an area that may have a contaminated or flammable atmosphere?
  • Does the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS involve, or is likely to involve, disturbing asbestos?
  • Does the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS involve tilt-up or precast concrete?
  • Does the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS involve structural alteration or repair that requires temporary support to prevent collapse?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out in or near a confined space?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out in an area of a workplace where there is any movement of powered mobile plant?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out in/near a shaft or trench deeper than 1.5m or tunnel involving use of explosives?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out in areas with artificial extremes of temperature?
  • Is the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS carried out in or near water or other liquid that involves a risk of drowning?
  • Does the strapping tool (hand) work outlined in the Strapping Tool (Hand) SWMS involve diving work?

Your Strapping Tool (Hand) Safe Work Method Statement should also identify any high-risk machinery or equipment in operation near the worksite, such as:

Your Strapping Tool (Hand) SWMS should also list any Personal Protective Equipment such as: 

  • Foot Protection - Boots or closed in shoes
  • Hand Protection - Gloves
  • Head Protection - Hard hat or helmet
  • Hearing Protection - Ear plugs or ear muffs
  • Eye Protection - Safety glasses, goggles or face shields
  • Respiratory Protection - Face masks etc
  • Face Protection - Face shield, welding mask etc
  • High Visual Clothing
  • Protective Clothing - Overalls etc
  • Fall Protection - Safety harness, edge protection etc
  • Sun Protection - Sunscreen, hat etc
  • Hair and Jewellery Secured - Hair Net, etc

The Strapping Tool (Hand) SWMS must be reviewed continually to ensure it remains effective and relevant. The Strapping Tool (Hand) SWMS must be reviewed (and revised if necessary) if relevant control measures in relation to strapping tool (hand) work are revised. The review process should be carried out in consultation with workers (including contractors and subcontractors) who may be affected by the Strapping Tool (Hand) and their health and safety representatives who represented that work group at the workplace.

When the Strapping Tool (Hand) SWMS has been revised, the person conducting a business or undertaking must ensure:

  1. All persons involved in the strapping tool (hand) work are advised that a revision has been made and how they can access the revised Strapping Tool (Hand) SWMS;
  2. Persons who will need to change a work procedure or system as a result of the review are advised of the changes in a way that will enable them to implement their duties consistently with the revised Strapping Tool (Hand) SWMS; and,
  3. Workers that will be involved in the strapping tool(hand) work are provided with the relevant information and instruction that will assist them to understand and implement the revised Strapping Tool (Hand) SWMS.

When preparing your Strapping Tool (Hand) SWMS, here are some topics you might want to also include to ensure you have covered as many risks and hazards as possible.

Planning and Preparation When Working With and Around Strapping Tool (Hand).

When writing your Strapping Tool (Hand) SWMS, establish any policies, procedures and systems for working with Strapping Tool (Hand) in consultation with the Principal Contractor and workers while being sure to establish:

  • Health and Safety guidelines for strapping tool (hand) work
  • Emergency plans and evacuation procedures for the Strapping Tool (Hand) SWMS
  • Worker inductions for Strapping Tool (Hand)
  • Toolbox talks (safety meetings) added to the Strapping Tool (Hand) SWMS
  • Outline details of supervision of the site and workers on the Strapping Tool (Hand) SWMS
  • Check all workers qualifications, permits and competencies for Strapping Tool (Hand) operations
  • Ensure the Strapping Tool (Hand) and any related equipment is functioning correctly
  • Hazard reporting procedures in place and added to the Strapping Tool (Hand) SWMS
  • Incident reporting procedures in place and added to the Strapping Tool (Hand) SWMS
  • Exclusion zones when conducting strapping tool (hand) work
  • Risk Assessment for TASK completed and noted on the Strapping Tool (Hand) SWMS
  • Electrical NO GO ZONES identified, discussed and documented.

Assessment of Site Conditions 

Thoroughly assess the work site/area conditions when excavating and ensure that:

  1. A risk assessment of the strapping tool (hand) work is conducted
  2. Suitable access and adequate space to conduct strapping tool(hand) work safely
  3. Consult with all stakeholders on potential hazards and risks when conducting strapping tool (hand) work
  4. Consultation with all relevant workers and personnel for Strapping Tool (Hand) SWMS details
  5. If conducting Strapping Tool (Hand) at night, ensure there is adequate lighting
  6. Check that the work environment is suitable for strapping tool (hand) work

Strapping Tool (Hand) Training and Worker Qualifications

Ensure all workers have the appropriate licenses in conducting Strapping Tool (Hand) as well as any qualifications that may be required for various strapping tool (hand) projects before starting work. If White Cards are required, retain copies of all cards, licenses and qualifications of personnel.

All personnel must:

  1. Be trained and/or have received instructions on the Strapping Tool (Hand) SWMS including all safety and emergency procedures.
  2. Be qualified, knowledgeable and competent in Strapping Tool (Hand) operations and strapping tool (hand) work as well as all delegated tasks/responsibilities
  3. Be fully aware and understand the scope of work in relation to the Strapping Tool (Hand) SWMS

Below are some examples of some Control Measures to be implemented when creating your own Strapping Tool (Hand) Safe Work Method Statement Template:

  • Make sure that proper tool is selected for type of strapping being used never over-tension strapping.
  • Always use edge protectors to protect strapping from sharp corners avoid sharp bends and kinks.
  • Avoid touching cut ends of plastic or steel strap wearing and protection is necessary.
  • Strap will fly when cut or broken while under tension. Stand to side and away from the direction that the free end will fly when cutting strapping wearing eye protection is necessary.
  • Use only a strap cutter to cut plastic strap and cutting shears to cut steel strap always use proper tool to cut strapping.
  • Inspect all the tools before use for loose, worn, distorted or broken parts never use faulty equipment.
  • Always follow manufacturer’s instructions to make sure that strap is fed in a proper path through tensioner, and that straps are aligned for securing.
  • Avoid touching the sharp ends of steel strap wearing hand protection is necessary.
  • Place steel strap in carry dispenser to avoid coil unwinding.
  • Keep items being bound off the floor to allow the strap to be passed under the item wearing eye protection is necessary.
  • Make sure never to over-tension the strap, and protect steel strap from sharp corners.
  • Make sure that steel seals are of the proper size and type for size of strap being used.
  • Make sure that seals are properly crimped before releasing tension on strap.
  • Use proper strap cutting tools to cut steel strap after fitting.
  • Avoid touching sharp edges of polypropylene strapping wearing hand protection is necessary.
  • Always place plastic strap in dispenser to allow strap to be pulled from drum without twisting.
  • Keep items being bound off the floor to allow the strap to be passed under the item.
  • Make sure never to over-tension strap, and protect strap from sharp edges and corners. Make sure that steel seals are of the proper size and type for the strap being used.
  • Make sure that seals are properly crimped, or that wire buckles are properly fitted before releasing tension on strap.
  • Regularly inspect all the weld produced by electric (battery or mains powered) hand strapping machines to make sure that strapping will not fail in service never use electric machines in wet conditions.

National: View the Model Codes of Practice for Excavation Work on Safe Work Australia's website here.
Victoria: Victoria's Code of Practice for Excavation Work may be viewed on Work Safe Victoria's website here.