Transmission Jack Safe Work Method Statement

Transmission Jack Safe Work Method Statement (SWMS Template) delivered in Microsoft Word format for easy editing.

Transmission Jack Safe Work Method Statement

Transmission Jack Safe Work Method Statement (SWMS)

Looking to start work on site? Or maybe you're just looking to make your workplace safer, or possibly you're going for that next Government Tender - Either way, the Transmission Jack Safe Work Method Statement (SWMS) is comprehensive, easy to understand and is designed to be implemented into your business with as little fuss as possible.

Look, we understand the challenges that many business owners face, let alone having to understand complicated safety documentation written in a language that nobody understands. That's why every Safe Work Method Statement Template is written in an easy to understand format, while at the same time being some of the highest quality in the industry. Our SWMS documents get you on site, save you loads of time and are easy to use. This way, you can get on with doing what you do best.


The Transmission Jack Safe Work Method Statement (SWMS) covers the following Job Steps, including potential hazards, control measures and risk ratings:

  1. Planning and preparation
  2. Training and capabilities
  3. Assess onsite conditions
  4. Set up work area
  5. Temporary Traffic Control (TMP)
  6. Delivery of materials and equipment
  7. Pre-use inspection
  8. Use of transmission jack
  9. Maintenance
  10. On completion

The Transmission Jack Safe Work Method Statement Includes


Risk Assessment Matrix | Hierarchy of Controls | PPE | Emergency Response

Your Transmission Jack Safe Work Method Statement (SWMS) is ready to be used in three easy steps:

  1. Add your company logo and details to the SWMS Template.
  2. Identify site specific risks.
  3. Address any site specific risks and add them to your SWMS Template.

Now that your Safe Work Method Statement (SWMS) is ready for use, you can also make the SWMS document available as a training resource for activities such as WHS-OHS Toolbox Meeting Talks or Workplace Inductions.

Transmission Jack Safe Work Method Statement

  • Detailed and pre-filled Transmission Jack Safe Work Method Statement.
  • Instant Delivery.
  • Fully editable Safe Work Method Statement Template.
  • Easy to customise - instructions included.
  • Referenced to Australian and NZ Standards (AS/NZS) & Legislation. 
Need to edit your
Transmission Jack Safe Work Method Statement
$ 96.80 AUD
$ 96.80 AUD
Buy now

5 SWMS Pack

$86.50 each
$ 432.50 AUD
$ 432.50 AUD
Buy now

10 SWMS Pack

$76.50 each
$ 765.00 AUD
$ 765.00 AUD
Buy now

20 SWMS Pack

$65.50ea
$ 1,310.00 AUD
$ 1,310.00 AUD
Buy now

50 SWMS Pack

$55.50 each
$ 2,275.00 AUD
$ 2,275.00 AUD
Buy now

View a Safe Work Method Statement Example

See an example of a Safe Work Method Statement Template below. All our SWMS Template documents are comprehensive in nature, easy to use, and are a huge time saver. Our Safe Work Method Statement Templates are quick and easy to customise to your specific business or operation and are perfectly suited for every day use, for larger contracts and tenders right through to qualifying for contractor management platforms such as CM3.

What is a Safe Work Method Statement?

A SWMS is a document that outlines the high-risk construction work activities that will be performed at a workplace, the hazards that will be present as a result of these activities, and the controls that will be implemented to mitigate the risks.

A single SWMS can be utilised for numerous high-risk construction work activities, such as employing powered mobile plant, working at heights of more than 2 metres, and working near to a road that is used by traffic other than pedestrians.

A SWMS is an administrative control that is used to support higher-order controls, such as engineering controls, that are designed to remove or reduce hazards to health and safety.

A SWMS differs from other documentation such as a Job Safety Analysis or a Safe Operating Procedure in that it focuses on specific jobs or processes. A SWMS isn't meant to be a procedure; rather, it's a tool for supervisors and workers to check and monitor the workplace control measures. For high-risk work activities, a PCBU (Person Conducting a Business or Undertaking)  must prepare a Safe Work Method Statement (SWMS) or check that one has been prepared before starting work. It is important to note that before any work process has started, a SWMS must be prepared.

A PCBU, on the other hand, also must manage health and safety hazards by eliminating or reducing them as much as possible. Before beginning any work on a project, the principal contractor must also obtain a copy of the SWMS.

What information does a Safe Work Method Statement need to contain?

A Safe Work Method Statement should identify high-risk work and any specify hazards related to high-risk construction work as well as any health and safety risks. The SWMS should describe the risk-control measures to be implemented, monitored, and reviewed and also should describe how the risk-control measures will be effective at reducing or eliminating the risk, and how they will be implemented, monitored, and reviewed.

A Safe Work Method Statement should be concise and focus on outlining the specific risks identified for the high-risk work to be performed, as well as the control measures to be implemented to ensure that the work is completed safely.

A long and overly complex Safe Work Method Statement which could be difficult to comprehend, implement and monitor or review may be confusing for workers to mentally digest and therefore is not ideal in helping to reduce or eliminate risks in the workplace. It is imperative that workers, and especially those who do not speak English, are able to understand the Safe Work Method Statement. Consider having pictures or diagrams added to the SWMS as a more effective way of presenting information contained within the SWMS.

The SWMS should also contain other regulatory requirements to protect health and safety of all personnel, such as controlling noise exposure and manual job risks. Also, keep in mind that evidence of a completed risk assessment may be required by the regulator or for auditing reasons if the Safe Work Method Statement is based on a workplace-specific risk assessment.

Who's Responsible for creating the Safe Work Method Statement?

In collaboration with workers who will be directly engaged in the activity, the person responsible for carrying out the work is usually best equipped to prepare the SWMS document. In most cases, this means that a Safe Work Method Statement is created by the builder for his or her employees, or by the subcontractor for their employees.

To establish who is in the best position to prepare the Safe Work Method Statement, the principle contractor, builder, and/or subcontractors should decide who will take responsibility for the SWMS.

It's also a requirement that all managers, contractors, supervisors, and workers be involved in the creation of a Safe Work Method Statement. Workers must be consulted so that they understand the SWMS in depth and what they must do to establish and maintain risks and implement control measures to manage the risk. Sharing information and utilising workers' knowledge and experience may also aid in ensuring that the task is completed in accordance with the SWMS.

If your workplace has a Health and Safety Representative, they should also be contacted while creating a Safe Work Method Statement.

What does the principal contractor's responsibility entail?

Before beginning work, a principal contractor must take all reasonable steps to obtain a SWMS from any contractor performing high-risk work. If no SWMS exists, the principal contractor must arrange for one to be created, for example by the contractor or subcontractor.

A general contractor should establish plans to ensure that high-risk work is carried out safely and in compliance with the Safe Work Method Statement. This can be done by keeping an eye on how the SWMS is being implemented on the ground.

The principal contractors' WHS management plan must also include detailed arrangements for collecting, assessing, monitoring, and reviewing the SWMS, according to the WHS Regulations.

How to Write a Safe Work Method Statement 

If you're looking to write your own Transmission Jack Safe Work Method Statement, the first step is to create the document as a Safe Work Method Statement Template. This way, you can use the same SWMS Template and then adjust the document for each different transmission jack project as needed, making sure that your Transmission Jack SWMS Template addresses any site specific risks. 

The fastest and most cost effective solution would be to purchase a Bluesafe Transmission Jack SWMS Template. However, if you decide to take the route of writing your own transmission jack SWMS.

There are some fundamental requirements and information which you may want to consider adding to your Transmission Jack SWMS such as:

  • Details of the person(s) responsible for making sure implementation, monitoring and compliance of the Transmission Jack SWMS as well as any reviews and modifications.
  • Any information detailing safety meetings or toolbox talks in relation to transmission jack work, scheduled in accordance with legislative requirements to first identify any site hazards where the transmission jack work is being conducted, secondly, communicate the risks and hazards and then take steps to eliminate or control each hazard in relation to the transmission jack work being done.
  • Any changes added to the Transmission Jack SWMS after an incident or a near miss. 

Note: The Transmission Jack SWMS must be kept and be available for inspection at least until the transmission jack work is completed. Where the Transmission Jack SWMS is revised, all versions of theSWMS Template should be kept. If a notifiable incident occurs in relation to the Transmission Jack Safe Work Method Statement, the Transmission Jack SWMS must be kept for a minimum of two years from the date of the incident.

Your Transmission Jack Safe Work Method Statement Template should list any high risk construction work, such as:

  • Does the transmission jack work outlined in the Transmission Jack SWMS involve a risk of a person falling more than 2 meters?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out on or near pressurised gas mains or piping?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out on a telecommunication tower?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out on or near chemical, fuel or refrigerant lines?
  • Does the transmission jack work outlined in the Transmission Jack SWMS involve demolition of an element of a structure that is load-bearing?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out on or near energised electrical installations or services?
  • Does the transmission jack work outlined in the Transmission Jack SWMS involve demolition of an element related to the physical integrity of a structure?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out in an area that may have a contaminated or flammable atmosphere?
  • Does the transmission jack work outlined in the Transmission Jack SWMS involve, or is likely to involve, disturbing asbestos?
  • Does the transmission jack work outlined in the Transmission Jack SWMS involve tilt-up or precast concrete?
  • Does the transmission jack work outlined in the Transmission Jack SWMS involve structural alteration or repair that requires temporary support to prevent collapse?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out in or near a confined space?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out in an area of a workplace where there is any movement of powered mobile plant?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out in/near a shaft or trench deeper than 1.5m or tunnel involving use of explosives?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out in areas with artificial extremes of temperature?
  • Is the transmission jack work outlined in the Transmission Jack SWMS carried out in or near water or other liquid that involves a risk of drowning?
  • Does the transmission jack work outlined in the Transmission Jack SWMS involve diving work?

Your Transmission Jack Safe Work Method Statement should also identify any high-risk machinery or equipment in operation near the worksite, such as:

Your Transmission Jack SWMS should also list any Personal Protective Equipment such as: 

  • Foot Protection - Boots or closed in shoes
  • Hand Protection - Gloves
  • Head Protection - Hard hat or helmet
  • Hearing Protection - Ear plugs or ear muffs
  • Eye Protection - Safety glasses, goggles or face shields
  • Respiratory Protection - Face masks etc
  • Face Protection - Face shield, welding mask etc
  • High Visual Clothing
  • Protective Clothing - Overalls etc
  • Fall Protection - Safety harness, edge protection etc
  • Sun Protection - Sunscreen, hat etc
  • Hair and Jewellery Secured - Hair Net, etc

The Transmission Jack SWMS must be reviewed continually to ensure it remains effective and relevant. The Transmission Jack SWMS must be reviewed (and revised if necessary) if relevant control measures in relation to transmission jack work are revised. The review process should be carried out in consultation with workers (including contractors and subcontractors) who may be affected by the Transmission Jack and their health and safety representatives who represented that work group at the workplace.

When the Transmission Jack SWMS has been revised, the person conducting a business or undertaking must ensure:  

  1. All persons involved in the transmission jack work are advised that a revision has been made and how they can access the revised Transmission Jack SWMS;
  2. Persons who will need to change a work procedure or system as a result of the review are advised of the changes in a way that will enable them to implement their duties consistently with the revised Transmission Jack SWMS; and,
  3. Workers that will be involved in the transmission jack work are provided with the relevant information and instruction that will assist them to understand and implement the revised Transmission Jack SWMS.

When preparing your Transmission Jack SWMS, here are some topics you might want to also include to ensure you have covered as many risks and hazards as possible.

Planning and Preparation When Working With and Around Transmission Jack. 

When writing your Transmission Jack SWMS, establish any policies, procedures and systems for working with Transmission Jack in consultation with the Principal Contractor and workers while being sure to establish:

  • Health and Safety guidelines for transmission jack work
  • Emergency plans and evacuation procedures for the Transmission Jack SWMS
  • Worker inductions for Transmission Jack
  • Toolbox talks (safety meetings) added to the TransmissionJack SWMS
  • Outline details of supervision of the site and workers on the Transmission Jack SWMS
  • Check all workers qualifications, permits and competencies for Transmission Jack operations
  • Ensure the Transmission Jack and any related equipment is functioning correctly
  • Hazard reporting procedures in place and added to the Transmission Jack SWMS
  • Incident reporting procedures in place and added to the Transmission Jack SWMS
  • Exclusion zones when conducting transmission jack work
  • Risk Assessment for TASK completed and noted on the Transmission Jack SWMS
  • Electrical NO GO ZONES identified, discussed and documented.

Assessment of Site Conditions

Thoroughly assess the work site/area conditions when excavating and ensure that:

  1. A risk assessment of the transmission jack work is conducted
  2. Suitable access and adequate space to conduct transmission jack work safely
  3. Consult with all stakeholders on potential hazards and risks when conducting transmission jack work
  4. Consultation with all relevant workers and personnel for Transmission Jack SWMS details
  5. If conducting Transmission Jack at night, ensure there is adequate lighting
  6. Check that the work environment is suitable for transmission jack work

Transmission Jack Training and Worker Qualifications

Ensure all workers have the appropriate licenses in conducting Transmission Jack as well as any qualifications that may be required for various transmission jack projects before starting work. If White Cards are required, retain copies of all cards, licenses and qualifications of personnel.

All personnel must:

  1. Be trained and/or have received instructions on the Transmission Jack SWMS including all safety and emergency procedures.
  2. Be qualified, knowledgeable and competent in Transmission Jack operations and transmission jack work as well as all delegated tasks/responsibilities
  3. Be fully aware and understand the scope of work in relation to the Transmission Jack SWMS

Below are some examples of some Control Measures to be implemented when creating your own Transmission Jack Safe Work Method Statement Template:

  • Inspect all components visually, including welds, for missing, damaged or distorted parts such as nuts and bolts.
  • Make sure the wheels and castors turn freely.
  • Inspect the jack visually for any signs of leakage of oil.
  • Inspect there are no damages and wear on ratchet tie-downs and they are operating properly.
  • If damaged, arrange for immediate repairs and do not use.
  • Always keep the wheels well lubricated.
  • Avoid using a faulty jack.
  • Faulty ratchet tie-downs must be replaced.
  • Work area where the jack is to be used must be clear of dirt, rubbish on the floor. There must be no grease and oil spills on the floor.
  • Prepare the transmission for removing wiring, tail shaft and linkages. Leave some of the bolts in the bell housing and the rear cross member in their place.
  • Place and position the jack under the vehicle. Pump the jackup to raise the carrier plate, until it is in the proper lifting position and just touches the transmission.
  • Adjust the four corner brackets so they securely contact the transmission case.
  • Place the tie-down straps on the transmission and tighten them until the casing is tightly held on the carrier plate. Tie the loose ends of the straps to prevent them from catching.
  • After removing the final mounting bolts, remove the transmission from the vehicle.
  • The transmission must be lowered fully, before moving the jack for avoiding the risk of overturning.
  • For replacing the transmission in the vehicle, follow the reverse procedure above.
  • It is necessary to wear foot protection.
  • It is necessary to wear eye protection.
  • Securely hold the transmission on the transmission jack, before removing the final bolts from the bell housing and the rear crossmember.
  • Make sure that the tie-downs are not caught or twisted.
  • Remove the tie-downs only when the transmission has to be removed from the transmission jack.
  • Always keep the pins, castors and wheels clean and oil them lightly.
  • Keep the jack free of oil and grease.
  • Check regularly for leaks and use only approved oil to top up when necessary.

National: View the Model Codes of Practice for Excavation Work on Safe Work Australia's website here.
Victoria: Victoria's Code of Practice for Excavation Work may be viewed on Work Safe Victoria's website here.