Tyre Curing Press Safe Work Method Statement

Tyre Curing Press Safe Work Method Statement (SWMS Template) delivered in Microsoft Word format for easy editing.

Tyre Curing Press Safe Work Method Statement

Tyre Curing Press Safe Work Method Statement (SWMS)

Looking to start work on site? Or maybe you're just looking to make your workplace safer, or possibly you're going for that next Government Tender - Either way, the Tyre Curing Press Safe Work Method Statement (SWMS) is comprehensive, easy to understand and is designed to be implemented into your business with as little fuss as possible.

Look, we understand business can be hard enough as it is without all the red tape, often written in language only a martian would understand. That's why every Safe Work Method Statement Template is written in an easy to understand format, while at the same time being some of the highest quality in the industry. Our SWMS documents get you on site, save you loads of time and are easy to use. This way, you can get on with doing what you do best.


The Tyre Curing Press Safe Work Method Statement (SWMS) covers the following Job Steps, including potential hazards, control measures and risk ratings:

  1. Planning and preparation
  2. Training and capabilities
  3. Assess onsite conditions
  4. Set up work area
  5. Temporary Traffic Control (TMP)
  6. Delivery of materials and equipment
  7. General precautions
  8. Operation
  9. Cleaning and maintenance
  10. On completion

The Tyre Curing Press Safe Work Method Statement Includes


Risk Assessment Matrix | Hierarchy of Controls | PPE | Emergency Response

Your Tyre Curing Press Safe Work Method Statement (SWMS) is ready to be used in three easy steps:

  1. Add your company logo and details to the SWMS Template.
  2. Identify site specific risks.
  3. Address any site specific risks and add them to your SWMS Template.

Your SWMS is now read to use, and may also be used as training materials for work related activities such as Workplace Inductions or WHS-OHS Toolbox Meeting Talks.

Tyre Curing Press Safe Work Method Statement

  • Detailed and pre-filled Tyre Curing Press Safe Work Method Statement.
  • Immediate Download Delivery.
  • Fully editable Safe Work Method Statement Template.
  • Easy to customise - instructions included.
  • Referenced to AS/NZS (Standards) and Legislation. 
Need to edit your
Tyre Curing Press Safe Work Method Statement
$ 96.80 AUD
$ 96.80 AUD
Buy now

5 SWMS Pack

$86.50 each
$ 432.50 AUD
$ 432.50 AUD
Buy now

10 SWMS Pack

$76.50 each
$ 765.00 AUD
$ 765.00 AUD
Buy now

20 SWMS Pack

$65.50ea
$ 1,310.00 AUD
$ 1,310.00 AUD
Buy now

50 SWMS Pack

$55.50 each
$ 2,275.00 AUD
$ 2,275.00 AUD
Buy now

View a Safe Work Method Statement Example

See an example of a Safe Work Method Statement Template below. All our SWMS Template documents are comprehensive in nature, easy to use, and are a huge time saver. Our Safe Work Method Statement Templates are quick and easy to customise to your specific business or operation and are perfectly suited for every day use, for larger contracts and tenders right through to qualifying for contractor management platforms such as CM3.

What is a Safe Work Method Statement?

A SWMS is a document that outlines the high-risk construction work activities that will be performed at a workplace, the hazards that will be present as a result of these activities, and the controls that will be implemented to mitigate the risks.

A single SWMS can be utilised for numerous high-risk construction work activities, such as employing powered mobile plant, working at heights of more than 2 metres, and working near to a road that is used by traffic other than pedestrians.

A SWMS is an administrative control that is used to support higher-order controls, such as engineering controls, that are designed to remove or reduce hazards to health and safety.

A SWMS differs from other documentation such as a Job Safety Analysis or a Safe Operating Procedure in that it focuses on specific jobs or processes. A SWMS isn't meant to be a procedure; rather, it's a tool for supervisors and workers to check and monitor the workplace control measures. For high-risk work activities, a PCBU (Person Conducting a Business or Undertaking)  must prepare a Safe Work Method Statement (SWMS) or check that one has been prepared before starting work. It is important to note that before any work process has started, a SWMS must be prepared.

A PCBU, on the other hand, also must manage health and safety hazards by eliminating or reducing them as much as possible. Before beginning any work on a project, the principal contractor must also obtain a copy of the SWMS.

What information does a Safe Work Method Statement need to contain?

A Safe Work Method Statement should identify high-risk work and any specify hazards related to high-risk construction work as well as any health and safety risks. The SWMS should describe the risk-control measures to be implemented, monitored, and reviewed and also should describe how the risk-control measures will be effective at reducing or eliminating the risk, and how they will be implemented, monitored, and reviewed.

A Safe Work Method Statement should be concise and focus on outlining the specific risks identified for the high-risk work to be performed, as well as the control measures to be implemented to ensure that the work is completed safely.

A long and overly complex Safe Work Method Statement which could be difficult to comprehend, implement and monitor or review may be confusing for workers to mentally digest and therefore is not ideal in helping to reduce or eliminate risks in the workplace. It is imperative that workers, and especially those who do not speak English, are able to understand the Safe Work Method Statement. Consider having pictures or diagrams added to the SWMS as a more effective way of presenting information contained within the SWMS.

The SWMS should also contain other regulatory requirements to protect health and safety of all personnel, such as controlling noise exposure and manual job risks. Also, keep in mind that evidence of a completed risk assessment may be required by the regulator or for auditing reasons if the Safe Work Method Statement is based on a workplace-specific risk assessment.

Who's Responsible for creating the Safe Work Method Statement?

In collaboration with workers who will be directly engaged in the activity, the person responsible for carrying out the work is usually best equipped to prepare the SWMS document. In most cases, this means that a Safe Work Method Statement is created by the builder for his or her employees, or by the subcontractor for their employees.

To establish who is in the best position to prepare the Safe Work Method Statement, the principle contractor, builder, and/or subcontractors should decide who will take responsibility for the SWMS.

It's also a requirement that all managers, contractors, supervisors, and workers be involved in the creation of a Safe Work Method Statement. Workers must be consulted so that they understand the SWMS in depth and what they must do to establish and maintain risks and implement control measures to manage the risk. Sharing information and utilising workers' knowledge and experience may also aid in ensuring that the task is completed in accordance with the SWMS.

If your workplace has a Health and Safety Representative, they should also be contacted while creating a Safe Work Method Statement.

What does the principal contractor's responsibility entail?

Before beginning work, a principal contractor must take all reasonable steps to obtain a SWMS from any contractor performing high-risk work. If no SWMS exists, the principal contractor must arrange for one to be created, for example by the contractor or subcontractor.

A general contractor should establish plans to ensure that high-risk work is carried out safely and in compliance with the Safe Work Method Statement. This can be done by keeping an eye on how the SWMS is being implemented on the ground.

The principal contractors' WHS management plan must also include detailed arrangements for collecting, assessing, monitoring, and reviewing the SWMS, according to the WHS Regulations.

How to Write a Safe Work Method Statement 

If you're looking to write your own Tyre Curing Press Safe Work Method Statement, the first step is to create the document as a Safe Work Method Statement Template. This way, you can use the same SWMS Template and then adjust the document for each different tyre curing press project as needed, making sure that your Tyre Curing Press SWMS Template addresses any site specific risks. 

The fastest and most cost effective solution would be to purchase a Bluesafe Tyre Curing Press SWMS Template. However, if you decide to take the route of writing your own tyre curing press SWMS.

There are some fundamental requirements and information which you may want to consider adding to your Tyre Curing Press SWMS such as:

  • Details of the person(s) responsible for making sure implementation, monitoring and compliance of the Tyre Curing Press SWMS as well as any reviews and modifications.
  • Any information detailing safety meetings or toolbox talks in relation to tyre curing press work, scheduled in accordance with legislative requirements to first identify any site hazards where the tyre curing presswork is being conducted, secondly, communicate the risks and hazards and then take steps to eliminate or control each hazard in relation to the tyre curing press work being done. 
  • Any changes added to the Tyre Curing Press SWMS after an incident or a near miss.

Note: The Tyre Curing Press SWMS must be kept and be available for inspection at least until the tyre curing press work is completed. Where the Tyre Curing Press SWMS is revised, all versions of the SWMS Template should be kept. If a notifiable incident occurs in relation to the Tyre Curing Press Safe Work Method Statement, the Tyre Curing Press SWMS must be kept for a minimum of two years from the date of the incident.

Your Tyre Curing Press Safe Work Method Statement Template should list any high risk construction work, such as:

  • Does the tyre curing press work outlined in the Tyre Curing Press SWMS involve a risk of a person falling more than 2 meters?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out on or near pressurised gas mains or piping?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out on a telecommunication tower?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out on or near chemical, fuel or refrigerant lines?
  • Does the tyre curing press work outlined in the Tyre Curing Press SWMS involve demolition of an element of a structure that is load-bearing?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out on or near energised electrical installations or services?
  • Does the tyre curing press work outlined in the Tyre Curing Press SWMS involve demolition of an element related to the physical integrity of a structure?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out in an area that may have a contaminated or flammable atmosphere?
  • Does the tyre curing press work outlined in the Tyre Curing Press SWMS involve, or is likely to involve, disturbing asbestos?
  • Does the tyre curing press work outlined in the Tyre Curing Press SWMS involve tilt-up or precast concrete?
  • Does the tyre curing press work outlined in the Tyre Curing Press SWMS involve structural alteration or repair that requires temporary support to prevent collapse?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out in or near a confined space?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out in an area of a workplace where there is any movement of powered mobile plant?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out in/near a shaft or trench deeper than 1.5m or tunnel involving use of explosives?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out in areas with artificial extremes of temperature?
  • Is the tyre curing press work outlined in the Tyre Curing Press SWMS carried out in or near water or other liquid that involves a risk of drowning?
  • Does the tyre curing press work outlined in the Tyre Curing Press SWMS involve diving work? 

Your Tyre Curing Press Safe Work Method Statement should also identify any high-risk machinery or equipment in operation near the worksite, such as:

Your Tyre Curing Press SWMS should also list any Personal Protective Equipment such as:

  • Foot Protection - Boots or closed in shoes
  • Hand Protection - Gloves
  • Head Protection - Hard hat or helmet
  • Hearing Protection - Ear plugs or ear muffs
  • Eye Protection - Safety glasses, goggles or face shields
  • Respiratory Protection - Face masks etc
  • Face Protection - Face shield, welding mask etc
  • High Visual Clothing
  • Protective Clothing - Overalls etc
  • Fall Protection - Safety harness, edge protection etc
  • Sun Protection - Sunscreen, hat etc
  • Hair and Jewellery Secured - Hair Net, etc

The Tyre Curing Press SWMS must be reviewed continually to ensure it remains effective and relevant. The Tyre Curing Press SWMS must be reviewed (and revised if necessary) if relevant control measures in relation to tyre curing press work are revised. The review process should be carried out in consultation with workers (including contractors and subcontractors) who may be affected by the Tyre Curing Press and their health and safety representatives who represented that work group at the workplace.

When the Tyre Curing Press SWMS has been revised, the person conducting a business or undertaking must ensure:

  1. All persons involved in the tyre curing press work are advised that a revision has been made and how they can access the revised Tyre Curing Press SWMS;
  2. Persons who will need to change a work procedure or system as a result of the review are advised of the changes in a way that will enable them to implement their duties consistently with the revised Tyre Curing Press SWMS; and,
  3. Workers that will be involved in the tyre curing presswork are provided with the relevant information and instruction that will assist them to understand and implement the revised Tyre Curing Press SWMS.

When preparing your Tyre Curing Press SWMS, here are some topics you might want to also include to ensure you have covered as many risks and hazards as possible.  

Planning and Preparation When Working With and Around Tyre Curing Press.

When writing your Tyre Curing Press SWMS, establish any policies, procedures and systems for working with Tyre Curing Press in consultation with the Principal Contractor and workers while being sure to establish:

  • Health and Safety guidelines for tyre curing press work
  • Emergency plans and evacuation procedures for the Tyre Curing Press SWMS
  • Worker inductions for Tyre Curing Press
  • Toolbox talks (safety meetings) added to the Tyre Curing Press SWMS
  • Outline details of supervision of the site and workers on the Tyre Curing Press SWMS
  • Check all workers qualifications, permits and competencies for Tyre Curing Press operations
  • Ensure the Tyre Curing Press and any related equipment is functioning correctly
  • Hazard reporting procedures in place and added to the Tyre Curing Press SWMS
  • Incident reporting procedures in place and added to the Tyre Curing Press SWMS
  • Exclusion zones when conducting tyre curing press work
  • Risk Assessment for TASK completed and noted on the Tyre Curing Press SWMS
  • Electrical NO GO ZONES identified, discussed and documented.

Assessment of Site Conditions

Thoroughly assess the work site/area conditions when excavating and ensure that:

  1. A risk assessment of the tyre curing press work is conducted
  2. Suitable access and adequate space to conduct tyre curing press work safely
  3. Consult with all stakeholders on potential hazards and risks when conducting tyre curing press work
  4. Consultation with all relevant workers and personnel for Tyre Curing Press SWMS details
  5. If conducting Tyre Curing Press at night, ensure there is adequate lighting
  6. Check that the work environment is suitable for tyre curing press work

Tyre Curing Press Training and Worker Qualifications

Ensure all workers have the appropriate licenses in conducting Tyre Curing Press as well as any qualifications that may be required for various tyre curing press projects before starting work. If White Cards are required, retain copies of all cards, licenses and qualifications of personnel.

All personnel must:

  1. Be trained and/or have received instructions on the Tyre Curing Press SWMS including all safety and emergency procedures.
  2. Be qualified, knowledgeable and competent in Tyre Curing Press operations and tyre curing press work as well as all delegated tasks/responsibilities
  3. Be fully aware and understand the scope of work in relation to the Tyre Curing Press SWMS 

Below are some examples of some Control Measures to be implemented when creating your own Tyre Curing Press Safe Work Method Statement Template:

  • Delivering steam to press will make steam pipes and fitting shot insulate steam pipes and fittings.
  • Moulding of tyre will make exposed metal surfaces hot avoid hot parts touching skin.
  • Always check air supply pipes and fittings for evidence of leaks or faults wearing hand protection is necessary.
  • Regularly check and empty the water traps on compressed air supply lines.
  • Keep floor area around curing presses clean from parts and debris always keep the floor clean and dry.
  • Keep hands away from all moving parts of press when press is opened.
  • Make sure that enough floor space is available to allow safe handling of tyres always keep work areas clear.
  • Obtain assistance or use mechanical aids to handle large or heavy tyres ensure proper handling practices are observed.
  • Periodically check that there are no foreign objects between the mould segments, and make sure that the air connection is sound and the tube is inflated before closing press stay away from moving parts when closing press.
  • Make sure that the curing cycle is completed before opening press to remove tyre always stand clear when opening press.
  • Make sure that steam supply to press is turned off completely before opening.
  • Wearing suitable gloves and clothing is necessary when handling hot tyres or press surfaces wearing gloves and apron is essential.
  • Shut off the steam supply to press before carrying out cleaning or maintenance.
  • Make sure that control switch is in the OFF position before working on the press.
  • Use suitable tools to clean mould and surfaces after removal of tyres wearing hand protection is necessary.
  • Always avoid touching sharp edges on moulds when cleaning or replacing.
  • Use mechanical aids to remove and replace tyre moulds in press obtain assistance when handling heavy or awkward loads.
  • Make sure that moulds are properly positioned and secured before using press.